12.07.2015 Views

Permit Expiration/Renewal Amnesty Ordinance (02-44)

Permit Expiration/Renewal Amnesty Ordinance (02-44)

Permit Expiration/Renewal Amnesty Ordinance (02-44)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(3) The as-built certificate shall contain a narrativedescription of the methodology utilized to makethe determination set forth in the as-built certificate.In issuing the Certificate of Completion orOccupancy, the Building Official shall be entitledto rely on the accuracy of the as-built certificate.(4) Prior to issuing the Certificate of Completion orOccupancy, the Building Official shall conductan inspection to determine, to the best of his orher ability given the nature of the construction:(1) that the plans submitted reflect the present stateof the structure; and(2) That the construction complies with the BuildingCode in effect at the time the work was commenced;and(3) That the structure complies with all requirementsof the Building Code identified in Section 8-11(g)(2)(c) <strong>Ordinance</strong> <strong>02</strong>-<strong>44</strong>(4) That the as-built certificate represents accuratelythe conditions of the structure.Not withstanding the provisions of this section, theBuilding Official may at all times continue enforcementof the Code through any authorized meansincluding issuance of a Notice of Violation, recordingof the same, commencement of a case beforethe Unsafe Structures Board and/or the issuanceof a civil violation notice. This section shall notbe construed or serve as a defense against any enforcementaction brought by the Building Officialbased on the current requirements of the Code.The Building Official shall establish a fee for processingapplications and to conduct any testing donepursuant to this section.GUIDELINE FOR RENEWAL OF EXPIRED ROOFPERMITS.(WITHOUT FINAL INSPECTIONS)Roofing permits issued prior to March 1, 20<strong>02</strong> andafter October 1, 1994, under jurisdiction of theSouth Florida Building Code shall comply with thefollowing guideline:• Under Miami-Dade County <strong>Amnesty</strong> <strong>Ordinance</strong><strong>02</strong>-<strong>44</strong>, a state of Florida duly licensed architector engineer, may provide an as-built certificationletter, signed and sealed, certifying that the roofis in compliance with the code in effect at thetime of the roof installation.• The as-built letter shall state the approximatedate of the roof installation.• The as-built letter shall state the product approvalnumber of the approved roofing system andstate that the underlayment and the fastenerswere visually inspected by plugging the roof. Inlieu of plugging of the roof an uplift test is acceptable.• An application for the renewal of the roof permitmust be submitted by a licensed roof contractor.• Upon submittal of the required documents theCity Roofing Inspector will review the as-builtletter for compliance with the code in effect atthe time of the roof installation.• Roofing <strong>Permit</strong>s issued prior to October 1, 1994which received an approved tin tag inspection,mop-on inspection and in progress for tile(where applicable) will not require a final inspection.Where no approval was issued , anengineer’s certification letter shall be submittedcertifying compliance with the code in effect atthe time of the roof installation and describingthe current condition of the roof as to whetherrepairs are required.FLORIDA BUILDING CODEPERMIT EXTENSIONS PROCEDURES:All permits applied for and issued after March 1,20<strong>02</strong> shall comply with the following.FBC Section 104.5.1.4To extend a permit for a period of 180 days fromthe date of expiration a request for an extensionshall be made prior to the expiration date that appearson your permit.To obtain an extension, the permit holder must completea permit extension application, requesting thepermit extension and submit it to the Building Departmentprior to the permit expiration date. The fee fora permit extension is sixty-five ($75.00) dollars.PERMIT EXPIRATION (FBC 104.5.1.1)If work has commenced and the permit is revoked,becomes null and void, or expires because of lackof progress or abandonment, a new permit coveringthe proposed construction shall be obtainedbefore proceeding with the work.CONDITIONS OF THE PERMIT(FBC104.5.1.3)Every permit issued shall become invalid unless thework authorized by such permit is commenced within6 months after issuance, or if the work authorized bysuch permit is suspended or abandoned for a periodof six (6) months after the time the work is commenced.In addition, work shall be considered to be in activeprogress when the permit has received an approvedinspection within 180 days.Upon submittal of the as-built letter and the as-builtplans required by the <strong>Amnesty</strong> <strong>Ordinance</strong>, the documentswill be reviewed for compliance with the <strong>Ordinance</strong>and the applicable codes.Building Department1700 Convention Center DriveMiami Beach, Florida 33139Phone: (305) 673-7610Fax Counter: (305) 673-7857Fax Director: (305) 535-7513www.miamibeachfl.gov

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!