the site.22 Specification The Specification of the Works included in the Contract and anymodification or addition made or approved by the Engineer.23 Start Date The date when the Contractor shall commence execution of the worksas per Contract Data. It does not necessarily coincide with any of theSite Possession Dates.24 Subcontractor A person or corporate body who has a Contract with the Contractor tocarry out a part of the work in the Contract which includes work onthe Site.25 Temporary Works Works designed, constructed, installed, and removed by theContractor which are needed for construction or installation of theWorks.26 Variation An instruction given by the Engineer, which varies the Works.27 Works What the Contract requires the Contractor to construct, install, andturnover to the Employer, as defined in the Contract Data.2 Interpretation2.1 In interpreting these Conditions of Contract, singular also means plural, male also meansfemale or neuter, and the other way around. Headings have no significance. Words have theirnormal meaning under the language of the Contract unless specifically defined. The Engineerwill provide instructions clarifying queries about the Conditions of Contract.2.2 If sectional completion is specified in the Contract Data, references in the Conditions ofContract to the Works, the Completion Date, and the Intended Completion Date apply to anySection of the Works (other than references to the Completion Date and Intended Completiondate for the whole of the Works).2.3 The documents forming the Contract shall be interpreted in the following order of priority:a. Agreementb. Letter of Acceptance/notice to proceed with the worksc. Contractor's Bidd. Contract Datae. Conditions of Contract including Special Conditions of Contractf. Specificationsg. Drawingsh. Bill of Quantities andi. any other document listed in the Contract Data as forming part of the Contract3 Language and Law3.1 The language of the Contract and the law governing the Contract are stated in the ContractData.4 Engineer's Decisions4.1 Except where otherwise specifically stated, the Engineer will decide contractual mattersbetween the Employer and the Contractor in the role representing the Employer.5 Delegation5.1 The Engineer may delegate any of his duties and responsibilities to other people afternotifying the Contractor and may cancel any delegation after notifying the Contractor.6 Communications6.1 Communications between parties which are referred to in the conditions are effective onlywhen in writing.7 Sub-contracting7.1 The Contractor may sub-contract any portion of work, upto a limit specified in ContractData, with the approval of the Engineer but may not assign the Contract without the approvalof the Employer in writing. Sub-contracting does not alter the Contractor's obligations. Subcontractors shall have to be got approved from employer after submitting credentials.Bid document for 4-laning of Merta-Lambiya-Beawar <strong>Road</strong> km 83/0 to 98/0 of SH-39Page 26 of 86
8 Other Contractors8.1 The Contractor shall cooperate and share the Site with other contractors, public authorities,utilities, and the Employer between the dates given in the Schedule of other Contractors. TheContractor shall as referred to in the Contract Data, also provide facilities and services forthem as described in the Schedule. The employer may modify the schedule of othercontractors and shall notify the contractor of any such modification.9 Personnel9.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel asreferred to in the Contract Data to carry out the functions stated in the Schedule or otherpersonnel approved by the Engineer. The Engineer will approve any proposed replacement ofkey personnel only if their qualifications, abilities, and relevant experience are substantiallyequal to or better than those of the personnel listed in the Schedule.9.2 If the Engineer asks the Contractor to remove a person who is a member of the Contractor'sstaff or his work force stating the reasons the Contractor shall ensure that the person leavesthe Site within seven days and has no further connection with the work in the Contract.10 Employer's and Contractor's Risks10.1 The Employer carries the risks which this Contract states are Employer's risks, and theContractor carries the risks which this Contract states are Contractor's risks11 Employer's Risks11.1 The Employer is responsible for the excepted risks which are in so far as they directly affectthe execution of the Works in India, the risks of war, hostilities, invasion, act of foreignenemies, rebellion, revolution, insurrection or military or usurped power, civil war, riotcommotion or disorder (unless restrict to the Contractor's employees), and contaminationfrom any nuclear fuel or nuclear waste or radioactive toxic explosive.12 Contractor's Risks12.1 All risks of loss of or damage to physical property and of personal injury and death whicharise during and in consequence of the performance of the Contract other than the exceptedrisks are the responsibility of the Contractor.13 Insurance13.1 The Contractor shall provide, in the joint names of the Employer and the Contractor,insurance cover from the Start Date to the end of the Defects Liability Period, in the amountsand deductibles stated in the Contract Data for the following events which are due to theContractor's risks:a. loss of or damage to the Works, Plant and Materials;b. loss of or damage to Equipment;c. loss of or damage of property (except the Works, Plant, Materials and Equipment) inconnection with the Contract; andd. personal injury or death.13.2 Policies and certificates for insurance shall be delivered by the Contractor to the Engineer forthe Engineer's approval before the Start Date. All such insurance shall provide forcompensation to be payable in the types and proportions of currencies required to rectify theloss or damage incurred.13.3 If the Contractor does not provide any of the policies and certificates required, the Employermay affect the insurance which the Contractor should have provided and recover thepremiums the Employer has paid from payments otherwise due to the Contractor or, if nopayment is due, the payment of the premiums shall be a debt due.13.4 Alterations to the terms of insurance shall not be made without the approval of the Employer.13.5 Both parties shall comply with any conditions of the insurance policies.14 Site Investigation Reports14.1 The Contractor, in preparing the Bid, shall rely on any site Investigation Reports referred toin the Contract Data, supplemented by any information available to the Bidder. However,bidders are advised to verify the details at their own level. The Employer will have noresponsibility in case any discrepancy is observed.Bid document for 4-laning of Merta-Lambiya-Beawar <strong>Road</strong> km 83/0 to 98/0 of SH-39Page 27 of 86