12.07.2015 Views

Rajasthan State Road Development & Construction Corporation Ltd.

Rajasthan State Road Development & Construction Corporation Ltd.

Rajasthan State Road Development & Construction Corporation Ltd.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the site.22 Specification The Specification of the Works included in the Contract and anymodification or addition made or approved by the Engineer.23 Start Date The date when the Contractor shall commence execution of the worksas per Contract Data. It does not necessarily coincide with any of theSite Possession Dates.24 Subcontractor A person or corporate body who has a Contract with the Contractor tocarry out a part of the work in the Contract which includes work onthe Site.25 Temporary Works Works designed, constructed, installed, and removed by theContractor which are needed for construction or installation of theWorks.26 Variation An instruction given by the Engineer, which varies the Works.27 Works What the Contract requires the Contractor to construct, install, andturnover to the Employer, as defined in the Contract Data.2 Interpretation2.1 In interpreting these Conditions of Contract, singular also means plural, male also meansfemale or neuter, and the other way around. Headings have no significance. Words have theirnormal meaning under the language of the Contract unless specifically defined. The Engineerwill provide instructions clarifying queries about the Conditions of Contract.2.2 If sectional completion is specified in the Contract Data, references in the Conditions ofContract to the Works, the Completion Date, and the Intended Completion Date apply to anySection of the Works (other than references to the Completion Date and Intended Completiondate for the whole of the Works).2.3 The documents forming the Contract shall be interpreted in the following order of priority:a. Agreementb. Letter of Acceptance/notice to proceed with the worksc. Contractor's Bidd. Contract Datae. Conditions of Contract including Special Conditions of Contractf. Specificationsg. Drawingsh. Bill of Quantities andi. any other document listed in the Contract Data as forming part of the Contract3 Language and Law3.1 The language of the Contract and the law governing the Contract are stated in the ContractData.4 Engineer's Decisions4.1 Except where otherwise specifically stated, the Engineer will decide contractual mattersbetween the Employer and the Contractor in the role representing the Employer.5 Delegation5.1 The Engineer may delegate any of his duties and responsibilities to other people afternotifying the Contractor and may cancel any delegation after notifying the Contractor.6 Communications6.1 Communications between parties which are referred to in the conditions are effective onlywhen in writing.7 Sub-contracting7.1 The Contractor may sub-contract any portion of work, upto a limit specified in ContractData, with the approval of the Engineer but may not assign the Contract without the approvalof the Employer in writing. Sub-contracting does not alter the Contractor's obligations. Subcontractors shall have to be got approved from employer after submitting credentials.Bid document for 4-laning of Merta-Lambiya-Beawar <strong>Road</strong> km 83/0 to 98/0 of SH-39Page 26 of 86

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!