12.07.2015 Views

Rajasthan State Road Development & Construction Corporation Ltd.

Rajasthan State Road Development & Construction Corporation Ltd.

Rajasthan State Road Development & Construction Corporation Ltd.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

28 3 ofSCCApplicable payment during maintenance period.thousand.1 st Year NIL2 nd Year 0.50%3 rd Year 0.75%4 th Year 1.00%5 th Year 1.25%6 th Year 1.50%* the rate is to be specified for specific project i.e road /building/ bridge/ ROB/ others29 52 The Securities shall be for the following minimum amountsequivalent as a percentage of the Contract Price:Percentage of completioncost*Performance Security for5 per cent of contractprice plus Rs._________as additional performancesecurity in terms of ITBClause 29.5The standard form of Performance Security and AdditionalPerformance Security acceptable to the Employer shall bean unconditional Bank Guarantee of the type as in Section 8of the Bidding Documents.30 58 The Schedule of Operating and Maintenance Manuals _________N/A31 58 The date by which ‘as-built’ drawings (in scale as directed)in 2 sets are requiredwithin 28 days of issue ofcertificate of completion32 58 The amount to be withheld for failing to supply ‘as built’ Rs 5 Lacs.drawings by the date required33 59.2 The events shall also be fundamental breach of contract The Contractor hascontravened clause 7.1and Clause 9 of GCC.Bid document for 4-laning of Merta-Lambiya-Beawar <strong>Road</strong> km 83/0 to 98/0 of SH-39Page 44 of 86

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!