12.07.2015 Views

Maritime Press Clippings 2012 - Hydrex Underwater Technology

Maritime Press Clippings 2012 - Hydrex Underwater Technology

Maritime Press Clippings 2012 - Hydrex Underwater Technology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DAILY COLLECTION OF MARITIME PRESS CLIPPINGS <strong>2012</strong> – 209(rpt) Sallim said this was to enable the fire and rescue personnel to take the necessary preventive and safetymeasures.The channelling of gas from Petronas Chemicals Methanol to the Patau-Patau power station was stoppedimmediately until after the situation returned to normal and it was safe, he said in a statement. Abdul Razak said thetemporary shutdown was expected to affect SESB's capability to channel electricity to all consumers in duty-freeLabuan. He also said that several emergency measures to meet the shortfall in electricity generation capacity would beimplemented, including Demand Side Management (DSM), during the period of peak demand. Rationing ofelectricity supply would only be implemented in stages if the implementation of the DSM was unable to cope with thedemand and the station could not operate at optimum capacity, he said. The Patau-Patau Power Station has thecapacity to generate 103.5MW of electricity, and is the only power station in the Federal Territory of Labuan. Source: BERNAMASHIPYARD NEWSSuccessful launch ceremonies forDOHUK and KARBALA by IHC MerwedeIHC Merwede has successfullylaunched the 500m3 grab hopperdredger, DOHUK, and the3,500m3 trailing suction hopperdredger, KARBALA (left) , in twoceremonies on 25 July <strong>2012</strong> at thecompany’s shipyard in Krimpen aanden IJssel, The Netherlands. TheDOHUK was launched early in themorning, followed later by theceremony for the KARBALA.The vessels were named bybreaking a jar of yoghurt over thebow. They are being built forToyota Tsusho Corporation,although the operator will be theGeneral Company for Ports ofIraq (GCPI). Both ceremonieswere performed by Mr Hussain Mohammed Abdullah, GCPI’s Project Director. The contract for the design,construction and delivery of both vessels was signed between Toyota Tsusho Corporation and IHC Dredgers on21 October 2010. The keel of the trailing suction hopper dredger was laid on 10 January <strong>2012</strong> and of the grab hopperDistribution : daily to 22500+ active addresses 27-07-<strong>2012</strong> Page 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!