12.07.2015 Views

Maritime Press Clippings 2012 - Hydrex Underwater Technology

Maritime Press Clippings 2012 - Hydrex Underwater Technology

Maritime Press Clippings 2012 - Hydrex Underwater Technology

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DAILY COLLECTION OF MARITIME PRESS CLIPPINGS <strong>2012</strong> – 209positioning (DP) mode, using satellite technology to automatically maintain position without anchoring. This places aheavy responsibility on thruster performance and reliability. Highly efficient propulsion during transit moves to a drillingsite, and closely controlled position keeping when drilling operations are in progress are key requirements of thesegiant thrusters. Seadrill has specified Rolls-Royce thrusters again for three drillships to be built by Samsung in Korea.Each vessel will be equipped with six azimuth thrusters, each rated at 4,500kW. A similar thruster order is specified fora drillship ordered by Pacific Drilling, while more powerful thrusters of the same design have been ordered for anEnsco drillship, both to be built at the same Samsung yard. Rolls-Royce thrusters are also to be used on drillshipspreviously contracted in Korea by Rowan, Noble and Fred Olsen at Hyundai and by Attwood, Transocean (Aker) andVantage at Daewoo. Source : PortNewsPort expansion continuesProgress on Arrium Mining's port expansion is continuing to rack up the milestones, with construction work now wellunderway. The expansion will increase Arrium Mining's export capability to 12 million tonnes of iron ore per year,opening up a number of opportunities for increased sales from its existing iron ore operations and through theacquisition of the Southern Iron assets near Coober Pedy. According to Arrium Mining general manager Whyalla portexpansion project Jon Hobbs, about 90 per cent of the areas have been fully handed over to the various contractors,meaning most aspects of the project have now begun. "Construction work has commenced on 11 of the 12 sites, withonly the new permanent berth still in the design phase," Mr Hobbs said. "As an interim measure, a temporary berth isunder construction by Leighton, the company also responsible for the permanent berth and rail line." Source:Whyalla NewsThe RISINGER at the Westerscheldt River – Photo : Walter de Groot ©Indonesian Port Operators Team Up toBoost EfficiencyDistribution : daily to 22500+ active addresses 27-07-<strong>2012</strong> Page 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!