12.07.2015 Views

Final - Massachusetts Water Resources Authority

Final - Massachusetts Water Resources Authority

Final - Massachusetts Water Resources Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Budget Summaries and Detail of ChangesProject IndexWastewater System ImprovementsInterception & PumpingS.104 Braintree-Weymouth Relief Facilities 16S.131 Upper Neponset Valley Sewer System 19S.130 Siphon Structure Rehabilitation 21S.132 Corrosion & Odor Control 23S.136 West Roxbury Tunnel 25S.137 Wastewater Central Monitoring 27S.139 South System Relief Project 29S.141 Wastewater Process Optimization 31S.142 Wastewater Meter System Equipment Replacement 33S.145 Interception & Pumping (I&P) Facility Asset Protection 35S.146 Inspection of Deer Island Cross Harbor Tunnels 42S.147 Randolph Trunk Sewer Relief 43TreatmentS.206 Deer Island Treatment Plant Asset Protection 44S.210 Clinton Wastewater Treatment Plant 52S.211 Laboratory Services 54ResidualsS.271 Residuals Asset Protection 56Combined Sewer OverflowsIntroduction to Combined Sewer Overflow Program 59S.339 North Dorchester Bay CSO Project 67S.347 East Boston Branch Sewer Relief 70S.355 MWR003 Gate and Siphon 72S.357 Charles River CSO Controls 74S.340 S. Dorchester Bay Sewer Separation (Fox Pt.) 76S.341 S. Dorchester Bay Sewer Separation (Comm. Pt.) 78S.344 Stony Brook Sewer Separation 80S.346 Cambridge Sewer Separation 82S.356 Fort Point Channel Sewer Separation 84S.358 Morrissey Boulevard Drain 86S.359 Reserved Channel Sewer Separation 87S.360 Brookline Sewer Separation 89S.361 Bulfinch Triangle Sewer Separation 91S.324 CSO Planning & Support 93Other WastewaterS.128 Infiltration/Inflow (I/I) Local Financial Assistance 96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!