- Page 3: MASSACHUSETTS WATER RESOURCES AUTHO
- Page 8 and 9: TotalContractFY09-13 FY14-18 Beyond
- Page 10 and 11: Highlights of changes from FY11 Fin
- Page 12 and 13: Dam Projects total project spending
- Page 14 and 15: In June 2011, MWRA executed a $32.5
- Page 16 and 17: The breakdown of the $574.9 million
- Page 18 and 19: Table 6 below describes the dollar
- Page 20: Future Risk FactorsDue to the very
- Page 23 and 24: Project Budget Summaries and Detail
- Page 25 and 26: S. 104 Braintree-Weymouth Relief Fa
- Page 27 and 28: ProjectStatus5/1193.5%Status as % i
- Page 29 and 30: Expenditure Forecast (in $000s) and
- Page 31 and 32: ProjectStatus5/1135.0%Status as % i
- Page 33 and 34: FES/FERSBiofilters Design& Construc
- Page 35 and 36: Expenditure Forecast (in $000s) and
- Page 37 and 38: EquipmentPrepurchaseTechnical Assis
- Page 39 and 40: Pump Station FeasibilityMWRA consid
- Page 41 and 42: Expenditure Forecast (in $000s) and
- Page 43 and 44: Changes to Project Scope, Budget, a
- Page 45 and 46: Sub-phaseInterceptor Renewal#4 Ever
- Page 47 and 48: Sub-phaseNut Island Fire PumpBuildi
- Page 49: Sub-phasePrison PointGearbox Rebuil
- Page 53 and 54: S. 206 Deer Island Treatment Plant
- Page 55 and 56: Sub-phaseEquipment Replacement:Sout
- Page 57 and 58: Sub-phaseUtilities:DI Digester Flar
- Page 59 and 60: Expenditure Forecast (in $000s) and
- Page 61 and 62: S. 210 Clinton Wastewater Treatment
- Page 63 and 64: S. 211 Laboratory ServicesProject P
- Page 65 and 66: S. 271 Residuals Asset ProtectionPr
- Page 67 and 68: Expenditure Forecast (in $000s) and
- Page 69 and 70: Channel, East Boston, and Alewife B
- Page 71 and 72: Table 1Receiving WaterAlewife Brook
- Page 73 and 74: Anticipated operating cost impacts
- Page 75 and 76: ProjectCSO SupportCSO Planning andS
- Page 77 and 78: Seven. For the Morrissey Boulevard
- Page 79 and 80: S. 347 East Boston Branch Sewer Rel
- Page 81 and 82: S. 355 MWR003 Gate and SiphonProjec
- Page 83 and 84: S. 357 Charles River CSO ControlsPr
- Page 85 and 86: S. 340 South Dorchester Bay Sewer S
- Page 87 and 88: S. 341 South Dorchester Bay Sewer S
- Page 89 and 90: S. 344 Stony Brook Sewer Separation
- Page 91 and 92: S. 346 Cambridge Sewer SeparationPr
- Page 93 and 94: S. 356 Fort Point Channel Sewer Sep
- Page 95 and 96: S. 358 Morrissey Boulevard DrainPro
- Page 97 and 98: ProjectStatus5/1132.2%Status as % i
- Page 99 and 100: ProjectStatus5/1131.0%Status as % i
- Page 101 and 102:
Changes to Project Scope, Budget, a
- Page 103 and 104:
By amendment to the Master Planning
- Page 105 and 106:
S. 128 Infiltration/Inflow Local Fi
- Page 107 and 108:
Integrated Water Supply Improvement
- Page 109 and 110:
changes to comply with the Stage 2
- Page 111 and 112:
Sub-phaseWalnut Hill Ultra VioletDi
- Page 113 and 114:
S. 543 Quabbin Water Treatment Plan
- Page 115 and 116:
S. 545 Blue Hills Covered StoragePr
- Page 117 and 118:
S. 550 Spot Pond Storage FacilityPr
- Page 119 and 120:
Changes to Project Scope, Budget, a
- Page 121 and 122:
In September 2009 construction bega
- Page 123 and 124:
Sub-phaseOwner ControlledInsuranceD
- Page 125 and 126:
S. 615 Chicopee Valley Aqueduct Red
- Page 127 and 128:
S. 597 Winsor Station/Pipeline Impr
- Page 129 and 130:
Winsor Station/Pipeline Improvement
- Page 131 and 132:
Ware River IntakeValveReplacementCV
- Page 133:
Changes to Project Scope, Budget, a
- Page 136 and 137:
S. 621 Watershed LandProject Purpos
- Page 138 and 139:
S. 623 Dam ProjectsProject Purpose
- Page 140 and 141:
S. 625 Long Term RedundancyProject
- Page 142 and 143:
Expenditure Forecast (in $000s) and
- Page 144 and 145:
Sub-phaseEquipmentPurchaseScopePurc
- Page 146 and 147:
Changes to Project Scope, Budget, a
- Page 148 and 149:
were intended to prevent electrical
- Page 150 and 151:
Sub-phaseDesign CA/RISection 36/WS/
- Page 152 and 153:
S. 721 Southern Spine Distribution
- Page 154 and 155:
S. 727 Southern Extra High Redundan
- Page 156 and 157:
Changes to Project Scope, Budget, a
- Page 158 and 159:
ScopeSub-phaseDesign/CA/RI andConst
- Page 160 and 161:
S. 704 Rehabilitation of Other Pump
- Page 162 and 163:
S. 722 Northern Intermediate High (
- Page 164 and 165:
S. 713 Spot Pond Supply Mains - Reh
- Page 166 and 167:
Expenditure Forecast (in $000s) and
- Page 168 and 169:
Expenditure Forecast (in $000s) and
- Page 170 and 171:
ScopeSub-phaseWatertown MOURouting
- Page 172 and 173:
S. 692 Northern High Service - Sect
- Page 174 and 175:
ScopeSub-phaseDesign/CS/RI -Revere/
- Page 176 and 177:
S. 731 Lynnfield PipelineProject Pu
- Page 178 and 179:
S. 618 Northern High Northwest Tran
- Page 180 and 181:
Explanation of ChangesProject cost
- Page 182 and 183:
S. 753 Central Monitoring SystemPro
- Page 184 and 185:
ProjectStatus5/1192.4%Status as % i
- Page 186 and 187:
Changes to Project Scope, Budget, a
- Page 188 and 189:
Expenditure Forecast (in $000s) and
- Page 190 and 191:
Sub-phaseScopeCovered StorageTank R
- Page 192 and 193:
Changes to Project Scope, Budget, a
- Page 194 and 195:
ProjectStatus5/1154.2%Status as % i
- Page 196 and 197:
S. 931 Business Systems PlanProject
- Page 198 and 199:
Sub-phasePhase V(FY01-10)Scope(Comp
- Page 200 and 201:
Sub-phaseNET2020(FY10-FY12)SAN II (
- Page 202 and 203:
Sub-phaseNET 2020DITP/SouthboroughS
- Page 204 and 205:
Expenditure Forecast (in $000s) and
- Page 206 and 207:
Explanation of ChangesProject cost,
- Page 208 and 209:
Expenditure Forecast (in $000s) and
- Page 210 and 211:
Understanding the Expenditure Forec
- Page 212 and 213:
Massachusetts Water Resources Autho
- Page 214 and 215:
Massachusetts Water Resources Autho
- Page 216 and 217:
Massachusetts Water Resources Autho
- Page 218 and 219:
Massachusetts Water Resources Autho
- Page 220 and 221:
Massachusetts Water Resources Autho
- Page 222 and 223:
Massachusetts Water Resources Autho
- Page 224 and 225:
Massachusetts Water Resources Autho
- Page 226 and 227:
Massachusetts Water Resources Autho
- Page 228 and 229:
Massachusetts Water Resources Autho
- Page 230 and 231:
Massachusetts Water Resources Autho
- Page 232 and 233:
Massachusetts Water Resources Autho
- Page 234 and 235:
Massachusetts Water Resources Autho
- Page 236 and 237:
Massachusetts Water Resources Autho
- Page 238 and 239:
Massachusetts Water Resources Autho
- Page 240 and 241:
Massachusetts Water Resources Autho
- Page 242 and 243:
Massachusetts Water Resources Autho
- Page 244 and 245:
APPENDIX 3New Capital Projects Adde
- Page 246 and 247:
Appendix 3New Capital Projects Adde
- Page 248 and 249:
APPENDIX 4Overview of the FY12 Fina
- Page 250 and 251:
Program and ProjectTotal BudgetAmou
- Page 252 and 253:
APPENDIX 5Master Plan/CIP Status
- Page 254 and 255:
Priority Four Important Projects Ri
- Page 256 and 257:
Monitor system needs and plan appro
- Page 258 and 259:
Appendix 5Master Plan/CIP Status(in
- Page 260 and 261:
Appendix 5Master Plan/CIP Status(in
- Page 262 and 263:
Appendix 5Master Plan/CIP Status(in
- Page 264 and 265:
Subphase/ProjectAppendix 6Project S
- Page 266 and 267:
Subphase/ProjectTotalContractAmount
- Page 268 and 269:
Subphase/ProjectTotalContractAmount
- Page 270 and 271:
Subphase/ProjectTotalContractAmount
- Page 272 and 273:
Subphase/ProjectTotalContractAmount
- Page 274 and 275:
Subphase/ProjectTotalContractAmount
- Page 276 and 277:
Subphase/ProjectTotalContractAmount
- Page 278 and 279:
Subphase/ProjectTotalContractAmount
- Page 280 and 281:
Subphase/ProjectTotalContractAmount
- Page 282 and 283:
Subphase/ProjectTotalContractAmount
- Page 284 and 285:
Subphase/ProjectTotalContractAmount
- Page 286 and 287:
APPENDIX 7PROJECT/MUNICIPALITY(s)Pr
- Page 288 and 289:
APPENDIX 8Municipality and ProjectR
- Page 290 and 291:
MunicipalityProject Number/ProjectA
- Page 292 and 293:
APPENDIX 8MUNICIPALITY/PROJECT(s)Mu
- Page 294 and 295:
Appendix 9ProjectTotal Cost($000)Wa
- Page 296 and 297:
Appendix 9S.194 Nut IslandIntermedi
- Page 298 and 299:
Appendix 9Waterworks System Improve
- Page 300 and 301:
Appendix 9S.681 Southern ServiceImp
- Page 302 and 303:
Appendix 9Business & Operations Sup
- Page 304:
APPENDIX 10EXPECTED USEFUL LIFE OF