East Side AccessDispute Review Board StatusAndy ThompsonProgram Manager - ConstructionMTA Capital Construc1on 1


East Side AccessMTA Capital Construc1on 2


East Side Access• First Expansion of LIRR in over 100 years • A new LIRR terminal sta1on beneath GCT • 3½ route miles • 8 miles of tunnels connec1ng to the exis1ng 63rd Street tunnel – 38,000 Linear Ft of hard rock tunnel in ManhaLan – 10,500 Linear Ft of soN ground tunnel in Queens • New Mid Day Storage Yard in Sunnyside, Queen • 6 new vent plants • Substa1ons etc. • Project Budget: $8.24 billion • Comple;on: August 2019 MTA Capital Construc1on 3


Project ChallengesTHERE Sunnyside yard Harold Interlocking HERE MTA Capital Construc1on 4


Project ChallengesMTA Capital Construc1on 5


Grand Central TerminalMTA Capital Construc1on 6


LIRR Terminal at GCT47 th St 48 th St 49 th St 48 th St Entrance 280 Park Ave 50 th St Facility 46 th St 45 th St 44 th St 47 th St Entrance 245 Park Ave Madison Ave ADA Elevator 44 th St Facility Escalators from Mezzanine to Concourse Public Circula;on LIRR Caverns and Mezzanine Public Circula;on Escalators from Mezzanine to Concourse Escalator Up To GCT Dining Concourse Metro North Lower Track Level Historic GCT MTA Capital Construc1on 7


LIRR GCT ConcourseMTA Capital Construc1on 8


LIRR Station at GCTVanderbilt Avenue Park Avenue MNR Upper Level MNR Lower Level Off Street EntrancesLIRR Concourse Freight Elevators91’-­‐0” 140’-­‐0” West Cavern 10’-­‐7” 61’-­‐2” Passenger ElevatorsEast Cavern Escalator Sha[sLIRR MezzanineUpper Pla\ormLower Pla\orm13’-­‐0” 9’-­‐5” Terminal CavernsSection Looking NorthSection Looking North27’-­‐4” 51’-­‐11” MTA Capital Construc1on 9


Manhattan WorkManhaLan Tunnels & Structures 55 th St. Ven1la1on Facility 50 th St. Ven1la1on Facility 44th St. Demoli1on & Construct Fan Plant Structure & 245 Park Ave. Entrance GCT Concourse & Facili1es Fit-­‐Out Early Work Ver1cal Circula1on (Escalators & Elevators) MTA Capital Construc1on 10


Queens WorkYard LeadApproach StructureYard LeadTunnel ATunnel DHoneywell StSunnysideYardTunnel B/CFan Plant &EmergencyExitTBMTunnelsMTA Capital Construc1on 11


East Side Access OverviewMTA Capital Construc1on 12


East Side Access OverviewType Total Construc1on Bid Design Closed Third Party 42 14 4 7 17 Railroad 18 10 7 1 Total value under construc;on approx. $3.3bn: CM009 – Manhadan Tunnels I $450m Dragados/Judlau CM019 – Manhadan Tunnels II $725m Dragados/Judlau CM004 – 44 th St Vent Plant $42m Yonkers Construc@on Co. CM013 – 50 th St Vent Plant $93m Halmar/China Interna@onal CM013A – 55 th St Vent Plant $53m Schiavone/Picone CM014A – Concourse South $42m Yonkers Construc@on Co. CQ031 – Queens Bored Tunnels $717m Granite/Traylor/Fron@er CQ032 – Plaza Structure and Substa;on $148m Tutor Perini CQ039 – Northern Boulevard Crossing $83m Schiavone/Kiewit CH053 – Harold Structures $150m Perini CH054A – Harold Structures 2 $21m Perini MTA Capital Construc1on 13


Use of DRB’s• Restricted to contracts with underground work:– CM009 Manhattan Tunnels– CM019 Manhattan Structures 1– CM013 50 th St Vent Plant– CQ031 Queens Soft Ground Tunnels– CQ039 Northern Boulevard Crossing– Approx. $2.1bn or 45% of construction• Have been considered for other contracts butnot yet adopted.MTA Capital Construc1on 14


CM013 -50 th St Vent PlantMTA Capital Construc1on 15


50 th St Vent PlantCooling Tower reloca;on 437 Madison Avenue U;lity Chase 300 Park Avenue MTA Capital Construc1on 16


50 th St BeforeMTA Capital Construc1on 17


50 th St Vent FacilityMTA Capital Construc1on 18


50 th St Vent FacilityMTA Capital Construc1on 19


50 th St Vent FacilityMTA Capital Construc1on 20


Manhattan Tunnels CM009/019Excavation Scope By Contract38th St. Air PlenumGCT 1 & 2 West CavernGCT 1 & 2 East Cavern44 4 4 4 4 4UPPERLEVEL50th St. Air PlenumCaverns & TunnelGCT 3 WyeCavern WestGCT 3 WyeCavern EastGCT 3Crossover55th St. AirPlenum CavernTBMSELI(EB)Robbins(WB)(ft)(ft/dUpper Drive#1 5,665 5,665 100% 30 fUpper Drive#2 2,894 0 0%Lower Drive#1 3,797 0 0%Lower Drive#2 3,077 0 0%Total SELI 15,432 5,665 36.71%Upper Drive#1 7,650 7,650 100% 39 fUpper Drive#2 1,439 1,439 100% 66 fLower Drive#1 5,386 0 0%Lower Drive#2 1,434 0 0%Total Robbins 15,909 9,089 57.13%Grand TotalDrivesDriveLengthWB (Robbins) ProgressEB (SELI) ProgressTo Date (ft)%Complete31,341 14,754 47.1%CompleteActiveFutureAvProdu38th StreetGCT 1 & 2 West Cavern43rd StreetGCT CavernWest50th StreetGCT 4 WyeCavern West55th Street55th St. Air PlenumCavern59th StreetN63rd StreetGCT 5 WyeCavern WestCompleted on 10/14/10 GCT 1 & 2 East Cavern38th St. Air PlenumT301 (SD 1) LOWERLEVEL1BWBGCT CavernEastT302 4B 2B(SD 2) 2AEBT303 T304 (RD 2) 1A(RD 1) GCT 4CrossoverGCT 4 WyeCavern East50th St. Air PlenumCaverns1BWBGCT 5 WyeCavern EastEB1ATBMAssemblyChambersT401 (SD 3) 3BT402 (SD 4) 4BT403 4A(RD 3) 3AT404 (RD 4) EB Section Cavern Through GCT WB Cavern Cavern 3B 3ASection Thru Approach TunnelsMTA Capital Construc1on 21


TBM hole throughJanuary 2010 MTA Capital Construc1on 22


Completed Tunnel JunctionMTA Capital Construc1on 23


Cavern ConstructionMTA Capital Construc1on 24


Roadheader ExcavationMTA Capital Construc1on 25


Roadheader ExcavationMTA Capital Construc1on 26


Cavern Top HeadingMTA Capital Construc1on 27


Cavern Top HeadingMTA Capital Construc1on 28


Cavern ArchMTA Capital Construc1on 29


West CavernMTA Capital Construc1on 30


CM019 - Manhattan Structures 1MTA Capital Construc1on 31


Shafts and EscalatorsVanderbilt Avenue Park Avenue MNR Upper Level MNR Lower Level Off Street EntrancesLIRR Concourse Freight Elevators91’-­‐0” 140’-­‐0” Elevator and Service Sha[s Escalator Sha[sUpper Pla\ormLIRR MezzanineSection Looking NorthTerminal CavernsLower Pla\ormMTA Capital Construc1on 32


Existing ConditionsMTA Capital Construc1on 33


New ConditionsMTA Capital Construc1on 34


Escalator ShaftMTA Capital Construc1on 35


Vertical Shaft ConstructionMTA Capital Construc1on 36


CQ031 Queens Soft Ground TunnelsMTA Capital Construc1on 37


CQ031 March 2010MTA Capital Construc1on 38


TBM Launch Shaft RepairsMTA Capital Construc1on 39


TBM Launch Shaft RepairsMTA Capital Construc1on 40


CQ031 Slurry Wall DefectsMTA Capital Construc1on 41


Queens Open Cut ExcavationMTA Capital Construc1on 42


TBM Launch Shaft May 2011MTA Capital Construc1on 43


Completed TunnelMTA Capital Construc1on 44


Completed TunnelMTA Capital Construc1on 45


CQ039 Northern Boulevard CrossingNYCT BMT Elevated ( N & Q Lines)Northern Boulevard Roadway13’ 20’ NYCT INDSubway(E, M, & R Lines)Existing IND Subway InvertGround Freeze ArchDriftDriftDriftTemporaryShotcrete Lining55’ Final LinerDriftDriftDriftTop of Rock80’ MTA Capital Construc1on 46


Northern Boulevard CrossingNYCT Elevated (N & Q Lines) Above Northern Boulevard 51 26MTA Capital Construc1on 47


CQ039 – Northern Boulevard Crossing“Hole Through” Slurry Wall in Dri[ 1 and Dri[ 3 “Hole Through” Slurry Wall in Dri[ 1 and Dri[ 3 Installing Inside Wire Mesh at Dri[ 5 Round 15 MTA Capital Construc1on 48


Risk Management Tools• Differing Site Condition Clause• Ground Conditions– Geotechnical Baseline Report CM009/CM019,CM013– Geotechnical Interpretative Report CQ031– Geotechnical Design Summary Report CQ039• Negotiated Contracts (limited prequal)– CM019, CQ031, CQ039• Risks Identified, Assessed, Allocated in theContract Documents• Clear Contractual Division of responsibilityMTA Capital Construc1on 49


DRB Composition• 3 person panel• Members typically selected from prescreenedpool of qualified members retained by MTA• Chairperson on each DRB is a lawyer• To date - mutual agreement reached for all DRBpanels.• Costs shared between MTA and ContractorMTA Capital Construc1on 50


ESA ExperienceContract NOC’s Dispute No1ces Advisory Opinion Hearings Recommenda1ons CM009 8 7 1 0 0 CM019 19 2 0 0 0 CM013 0 0 0 0 0 CQ031 70 22 0 0 0 CQ039 22 13 0 2 1 Overall 119 44 1 2 1 MTA Capital Construc1on 51


ESA Experience• Fosters communication• Forces resolution of issues• Can be burdensome• Considering using on future non undergroundcontractsMTA Capital Construc1on 52


Thank YouMTA Capital Construc1on 53