12.07.2015 Views

Cultus Lake Park Sanitary Sewer Infrastructure Assessment

Cultus Lake Park Sanitary Sewer Infrastructure Assessment

Cultus Lake Park Sanitary Sewer Infrastructure Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fraser Valley Regional District<strong>Cultus</strong> <strong>Lake</strong> <strong>Sanitary</strong> <strong>Sewer</strong> <strong>Infrastructure</strong> <strong>Assessment</strong> – Final ReportTable 4: Land UseCategory/IdentificationArea (ha)Residential<strong>Cultus</strong> <strong>Lake</strong>, East side 12.8<strong>Cultus</strong> <strong>Lake</strong>, West side 3.3Mountain View/ <strong>Park</strong> Drive 9.5<strong>Cultus</strong> <strong>Lake</strong>side condominiums 1.3Future Expansion 12.5<strong>Cultus</strong> lake mobile home park 12.2Commercial and InstitutionalSunnyside campground (seasonal sites) 24.7Commercial and institutional (shopping plaza, gas station,restaurant, church, fire hall, water park, etc.)10.23.3 Design FlowsDaily design flows were developed based on the existing and future population and landuse. Two sources were used to determine the design flows for the developed treatmentand pumping options (refer to Appendix A). These sources are:• City of Chilliwack “Subdivision and Land Development Bylaw 2004, No. 3055”• <strong>Sewer</strong>age System Standard Practice Manual” (SPM) ? (BC Ministry of Health2007)The design flows were developed based on the following criteria:• Ultimate population: 1622 capita• Residential and commercial area: 86.5 ha• Domestic flow rate: 410 l/c/d• Infiltration: 0.1 l/s/ha• Peaking factor: 3Table 5 provides the Design Flows that were be used for developing the describedTreatment and Pumping Options. For detailed flow calculations, refer to Appendix B.Table 5: Design Flows for the Treatment and Pumping OptionsDescriptionUnitTreatmentOptionsPumpingOptionAverage Dry Weather Flow (ADWF) m 3 /day 946 946Maximum Day Design Flow (MDD) m 3 /day 1893 ?Average Wet Weather Flow (AWWF) m 3 /day 1694 ?Peak Wet Weather Flow (PWWF) L/s 42 42Project No. 30825 – September, 2012 Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!