12.07.2015 Views

Te Puke Recreation and Aquatic Centre Feasibility Study

Te Puke Recreation and Aquatic Centre Feasibility Study

Te Puke Recreation and Aquatic Centre Feasibility Study

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Purpose of the ReportThis report has been prepared as a preliminary feasibility document to aid discussion between potentialpartners in the proposed <strong>Te</strong> <strong>Puke</strong> High School Community <strong>Aquatic</strong> <strong>and</strong> <strong>Recreation</strong> <strong>Centre</strong>. The document hasbeen prepared in accordance with Western Bay of Plenty District Council <strong>and</strong> <strong>Te</strong> Puki High School’s projectbrief <strong>and</strong> report formatting requirements. The document is envisaged to be the first step in a much longerprocess. Prior to a detailed business plan being developed it is essential that the potential partners discuss <strong>and</strong>finalise the type of facility they desire, <strong>and</strong> the likely levels of available capital funding.DisclaimerInformation, data <strong>and</strong> general assumptions used in the compilation of this preliminary report have beenobtained from sources believed to be reliable. Visitor Solutions Ltd has used this information in good faith <strong>and</strong>makes no warranties or representations, express or implied, concerning the accuracy or completeness of thisinformation. Interested parties should perform their own investigations, analysis <strong>and</strong> projections on all issuesprior to acting in any way with regard to this project.2


Executive SummaryThis <strong>Te</strong> <strong>Puke</strong> High School Community <strong>Aquatic</strong> <strong>and</strong> Indoor <strong>Recreation</strong> <strong>Feasibility</strong> study was undertaken toidentify the overall community needs <strong>and</strong> wishes for replacing the existing high school swimming pool <strong>and</strong>gymnasium with new facilities; either to meet just the school needs, or to meet the needs of the wider easterndistrict.A multi staged research approach was undertaken as part of the study. It included stakeholder consultation,international <strong>and</strong> national effective practice reviews, demographic <strong>and</strong> growth analysis, governance <strong>and</strong>management options, preliminary concept plan, operational plans <strong>and</strong> a quantity survey.The findings from the feasibility study have identified that there is a demonstrated need for a new aquatics<strong>and</strong> indoor recreation facility in <strong>Te</strong> <strong>Puke</strong>, in partnership with <strong>Te</strong> <strong>Puke</strong> High School.The demographic analysis of the <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas has indicated that the proposed <strong>Te</strong> <strong>Puke</strong>aquatics <strong>and</strong> indoor recreation facility has a solid <strong>and</strong> growing catchment population <strong>and</strong> that by 2031 this isestimated to reach approximately 20,000 for <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas.The growth management strategies that have been developed for <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas identify theneed for a pool <strong>and</strong> recreational complex to meet the future growth of <strong>Te</strong> <strong>Puke</strong>.The review of the existing network of aquatic <strong>and</strong> indoor recreation facilities has highlighted that <strong>Te</strong> <strong>Puke</strong>currently has limited access to indoor sport <strong>and</strong> recreation facilities. The key findings are:• <strong>Te</strong> <strong>Puke</strong> has one pool of sufficient size for club <strong>and</strong> community use, but this is nearing its use by date.• Bay Wave in Tauranga is the closest aquatic facility open 12 months of the year that could providesome of the recreational <strong>and</strong> swim sport needs of the <strong>Te</strong> <strong>Puke</strong> residents, but this is already operatingat capacity at peak times.• With regards to indoor recreation space there is currently no community focused indoor recreationcentre in <strong>Te</strong> <strong>Puke</strong>, or surrounding areas, apart from the <strong>Te</strong> <strong>Puke</strong> High School gymnasium (which isbeing replaced) <strong>and</strong> the <strong>Te</strong> <strong>Puke</strong> Sports Club indoor court. The closest indoor community recreationcentre is in Tauranga.The consultation process with key stakeholders has identified strong support for the development of anaquatic <strong>and</strong> indoor recreation facility in <strong>Te</strong> <strong>Puke</strong>.• The major issue identified by all the stakeholders was the lack of facilities within <strong>Te</strong> <strong>Puke</strong> for the localcommunity; <strong>and</strong> the inability or the funds to travel to Tauranga on a regular basis to access sport <strong>and</strong>recreation facilities.• From the sporting stakeholder perspective it was identified that there was a real lack of lane spacefor swimming squads <strong>and</strong> water polo space in the Western Bay <strong>and</strong> Tauranga areas. Currently thereare waiting lists to get into swim squads <strong>and</strong> insufficient space for water polo to allow for teamgrowth.• The majority of the stakeholders identified that the preferred location for a potential aquatic <strong>and</strong>indoor recreation facility would be adjacent to <strong>Te</strong> <strong>Puke</strong> High School. The main reasons given for thispreference were that it would allow for maximum use of the facility with school use during the day<strong>and</strong> community use after school hours. The small minority of people who were concerned with aschool site perceived that it may lead to the school monopolising the facility use.3


Two options regarding the concept plan <strong>and</strong> operation of the proposed facility have been considered <strong>and</strong>developed. These are:1. A facility with an indoor aquatic space <strong>and</strong> a two court indoor recreation centre2. A facility with an outdoor aquatic facility <strong>and</strong> a two court indoor recreation centreIn addition to the main components a series of spaces are included in each option; these would increase thesport <strong>and</strong> recreational opportunities <strong>and</strong> assist with making the centre more operationally viable. Thesecomponents are a weights gymnasium, a learn to swim pool, <strong>and</strong> a multi-purpose function/activity space.The high level estimated cost for the development of the <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility optionsare: (The sums include the fees at 15% <strong>and</strong> a contingency component of 10%).Option 1 - Covered Pool & <strong>Recreation</strong> <strong>Centre</strong>• Covered Pool $ 7,700,000• <strong>Recreation</strong> <strong>Centre</strong> $ 7,300,000• Total $ 15,000,000Option 2 - Uncovered Pool & <strong>Recreation</strong> <strong>Centre</strong>• Uncovered Pool $ 4,200,000• <strong>Recreation</strong> <strong>Centre</strong> $ 7,300,000• Total $ 11,500,000The concept plan includes a series of components that will need to be thoroughly reviewed <strong>and</strong> negotiated bythe partners to determine their level of ‘necessity’ before being included in the facility.There is also the potential that some components may be scaled down in size, or excluded from the finaldevelopment once this review has been completed. The final decision on whether specific items are includedor not will all impact on the final cost of the development.A number of potential governance <strong>and</strong> management models which could be utilised for the <strong>Te</strong> <strong>Puke</strong>development have also been considered as part of the study. These are:1 Full Council Ownership Model2 Full School Ownership Model3 A Holistic Site-Wide Trust ModelOf the three options it has been recommended that ‘OPTON 3 - A Holistic Site-Wide Trust Model’ beconsidered as the preferred governance model for the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility.Due to the significance of the proposed development, not only for <strong>Te</strong> <strong>Puke</strong>, but for surrounding areas whichcould include communities within the Tauranga City Council boundaries, as well as the cross council planningthat has been undertaken on other recreation developments, it is recommended that the Tauranga CityCouncil be included in the project team to develop the next phase of the project evaluation.4


Contents1.0 Introduction ................................................................................................................................ 71.1 Background ..................................................................................................................................... 72.0 Population Overview .................................................................................................................. 82.1 <strong>Te</strong> <strong>Puke</strong> Population ......................................................................................................................... 82.2 Ethnic Groups.................................................................................................................................... 92.3 Population – Including Surrounding Areas ...................................................................................... 92.4 Population Projections .................................................................................................................. 102.5 Population Projections including surrounding areas ..................................................................... 102.6 Population Projections – Age Breakdowns .................................................................................... 112.8 Population – Seasonal Workers..................................................................................................... 133.0 Growth Strategies ..................................................................................................................... 143.1 Relevant ‘Growth Management Strategy’ Planning Documents .................................................... 143.2 <strong>Te</strong> <strong>Puke</strong> Long <strong>Te</strong>rm Development Plan 2004 -2024........................................................................ 154.0 Value of Sport of Sport <strong>and</strong> <strong>Recreation</strong> ..................................................................................... 174.1 Building Communities ................................................................................................................... 184.2 Social Inclusion ............................................................................................................................. 184.3 Supporting Education .................................................................................................................... 184.4 Improving our well being .............................................................................................................. 184.5 Reduced anti-social behaviour ...................................................................................................... 194.6 Economic Growth .......................................................................................................................... 194.7 Urban <strong>and</strong> Regional Regeneration ................................................................................................ 205.0 Council/School Facility Partnerships Learnings ......................................................................... 215.1 Introduction .................................................................................................................................. 215.2 Key Learnings ................................................................................................................................ 225.2.1 Preliminary <strong>Feasibility</strong> <strong>and</strong> Capital Development Funding (“Capx”) Considerations ................. 225.2.2 Operational Costs (“Opex”) Considerations ............................................................................... 225.2.3 Revenue Considerations ............................................................................................................. 225.2.5 Full <strong>Feasibility</strong> ............................................................................................................................. 235.2.6 Negotiation, Agreements <strong>and</strong> Documentation Considerations ................................................. 245.2.7 Project Management <strong>and</strong> Consultant Appointments ................................................................ 245.2.8 Project Planning <strong>and</strong> Design ....................................................................................................... 255.2.9 Governance Considerations ....................................................................................................... 255.2.10 Management Considerations ..................................................................................................... 265.2.11 Monitoring Considerations ......................................................................................................... 266.0 National Code Profiles <strong>and</strong> Trends ............................................................................................ 276.1 Traditional Sports <strong>and</strong> Activities ................................................................................................... 286.1.1 Swimming ................................................................................................................................... 286.1.2 Canoe/Kayak ............................................................................................................................... 286.1.3 Basketball ................................................................................................................................... 286.1.4 Equipment Based Exercise.......................................................................................................... 296.1.5 Football ....................................................................................................................................... 296.1.6 Netball ........................................................................................................................................ 296.1.7 Touch .......................................................................................................................................... 296.1.8 Rugby .......................................................................................................................................... 306.2 Non Traditional Sports <strong>and</strong> Activities ........................................................................................... 306.2.1 Pay for Play <strong>and</strong> Social ‘Leagues’................................................................................................ 306.2.2 Ethnic Sports ............................................................................................................................... 305


7.0 Network of Facilities ................................................................................................................. 327.1 <strong>Te</strong> <strong>Puke</strong> High School Facilities ....................................................................................................... 337.2 Pool Facilities ................................................................................................................................ 347.2.1 Existing School Pools Surrounding <strong>Te</strong> <strong>Puke</strong> ................................................................................ 347.2.2 Existing Other Pools in Surrounding Areas ................................................................................. 357.2.3 Planned New Pools in Surrounding Areas .................................................................................. 357.3 Indoor <strong>Recreation</strong> <strong>Centre</strong>s ............................................................................................................ 357.3.1 Existing <strong>Te</strong> <strong>Puke</strong> Indoor <strong>Centre</strong>s ................................................................................................. 357.3.2 Existing Other Indoor <strong>Recreation</strong> <strong>Centre</strong>s in Surrounding Areas ............................................... 367.3.3 Planned New Indoor <strong>Recreation</strong> <strong>Centre</strong> ..................................................................................... 368.0 Benchmark against other Councils ............................................................................................ 378.1 Other Councils .............................................................................................................................. 379.0 Stakeholder Feedback Overview .............................................................................................. 399.1 Key Sports Clubs Feedback ............................................................................................................ 409.2 <strong>Te</strong> <strong>Puke</strong> Community Board Feedback ............................................................................................ 419.3 <strong>Te</strong> <strong>Puke</strong> Councillors ....................................................................................................................... 429.4 <strong>Te</strong> <strong>Puke</strong> Community ...................................................................................................................... 439.5 Schools .......................................................................................................................................... 439.6 Tauranga City Council .................................................................................................................... 4410.0 Needs Analysis Summary ......................................................................................................... 4510.1 Needs Analysis .............................................................................................................................. 4510.2 Site Selection ................................................................................................................................ 4711.0 Design Brief .............................................................................................................................. 4811.1 Key Considerations ....................................................................................................................... 4811.1.1 Indoor Pool vs. Outdoor Pool ..................................................................................................... 4911.1.2. Depth of Main Pool vs. Size of Learners Pool ............................................................................. 5011.2 Summary ....................................................................................................................................... 5112.0 Schedule of Spaces ................................................................................................................... 5213.0 High Level Cost Estimates of the Concept Plan ......................................................................... 5413.1 Potential to Reduce Costs ............................................................................................................. 5413.2 Estimated Cost for ‘Concept Plan’ ................................................................................................. 5413.2.1 Estimated Cost Inclusions ........................................................................................................... 5513.2.2 Estimated Costs Exclusions ......................................................................................................... 5513.3 Funding Splits & Staging Options .................................................................................................. 5514.0 Governance <strong>and</strong> Management ................................................................................................. 5714.1 Introduction .................................................................................................................................. 5714.2 High Level Governance & Management Structure Options ........................................................... 5815.0 Preliminary Operational Costs ................................................................................................. 6115.1 Development of Operational Costs ............................................................................................... 6115.2 Preliminary Operational Budget .................................................................................................... 6115.3 Income Streams ............................................................................................................................ 6215.4 Costs ............................................................................................................................................. 6215.5 Preliminary Operational Budget Deficit/Surplus ........................................................................... 6316.0 Funding .................................................................................................................................... 6617.0 Conclusions ............................................................................................................................... 7018.0 Recommendations .................................................................................................................... 70Appendix…………………………………………………………………………………………………………………………………………………….716


1.0 IntroductionVisitor Solutions Ltd has been commissioned by Western Bay of Plenty District Council <strong>and</strong> <strong>Te</strong> <strong>Puke</strong> High Schoolto undertake a holistic feasibility study for the proposed <strong>Te</strong> <strong>Puke</strong> <strong>Aquatic</strong> <strong>and</strong> Indoor <strong>Recreation</strong> Facility.The scope of the project included carrying out consultation <strong>and</strong> needs analysis research, consideration ofpotential sites, designing a preliminary concept ‘master plan’, examining preliminary operational costs <strong>and</strong>revenue streams, preparing an overall development programme, examining potential governance structures<strong>and</strong> establishing the likely development costs.1.1 BackgroundAn outdoor 33 metre aquatic facility is situated adjacent to the <strong>Te</strong> <strong>Puke</strong> High School on MoE l<strong>and</strong>. Known asthe <strong>Te</strong> <strong>Puke</strong> <strong>Aquatic</strong> <strong>Centre</strong> <strong>and</strong> Memorial Pool, the facility has been in existence since 1961.The pool complex has been operated under a variety of structures over this time, including directly by theCouncil <strong>and</strong> by local swimming clubs (pool user). It is currently owned <strong>and</strong> managed by the <strong>Te</strong> <strong>Puke</strong> HighSchool. The Western Bay of Plenty District Council (WBOPDC) has an annual Service Delivery Contract (SDC)with the <strong>Te</strong> <strong>Puke</strong> High School, which is used to assist meeting operational costs associated with public use. TheWBOPDC has also entered into a Deed of Agreement with the School Board of Trustees to ensure public accessto the Pool.The pool has been experiencing a significant leak since 2009 <strong>and</strong> investigations in to the cause remain ongoing.However, it is clear that the pool is likely to be coming to the end of its anticipated life.<strong>Te</strong> <strong>Puke</strong> High School also currently has a one court gymnasium that was developed in the early 1970s. Untilrecently the facility was shared with a variety of community groups. However, increased use by the school dueto its roll growth has prevented the continuation of this arrangement. This has lead to some communitygroups being displaced.This lack of indoor gymnasium space has also been recognised by the Ministry of Education (MoE). A key factorfor <strong>Te</strong> <strong>Puke</strong> High School being interested in the development of a new indoor gymnasium is that they areentitled under MoE guidelines to new gymnasium space after 2012. The guidelines state this space is to beequivalent to 1.6 basket ball courts.<strong>Te</strong> <strong>Puke</strong> High School reviewed its ten year property plan in 2009 <strong>and</strong> identified there was a need to replace theexisting gymnasium in 2010/11 <strong>and</strong> the pool on or about 2012/13.The Western Bay of Plenty District Council has also identified, through various planning documents includingthe <strong>Te</strong> <strong>Puke</strong> 20 Year Development Plan outcomes, the potential need for a pool complex with integratedaquatic <strong>and</strong> recreational facilities. Investigating <strong>and</strong> resolving these issues was seen as a priority.As a result of the aging pool <strong>and</strong> gymnasium complex at <strong>Te</strong> <strong>Puke</strong> High School, <strong>and</strong> the <strong>Te</strong> <strong>Puke</strong> communityidentifying the need for a long term solution for aquatic <strong>and</strong> indoor recreation space, the high school <strong>and</strong>Council partnered to undertake a feasibility study.7


2.0 Population OverviewUnderst<strong>and</strong>ing the demographic composition of both the immediate <strong>and</strong> surrounding areas (the potentialcatchment) is beneficial, even essential, when planning new community facilities. It is very important tounderst<strong>and</strong> the potential requirements of existing <strong>and</strong> future populations, both in terms of needs <strong>and</strong> alsofrom a potential operational st<strong>and</strong>point.The key considerations from the population section are identified in the below box.Key Considerations of the SectionThe demographic analysis of the <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas has indicated that the proposed <strong>Te</strong> <strong>Puke</strong>aquatics <strong>and</strong> indoor recreation facility has a solid <strong>and</strong> growing catchment population.The key information which adds support to developing <strong>Te</strong> <strong>Puke</strong> recreational infrastructure are:• Statistics New Zeal<strong>and</strong> identifies that <strong>Te</strong> <strong>Puke</strong> East <strong>and</strong> West will have a combined population of 7,670people by 2011, <strong>and</strong> 9,180 people by 2031.• Statistics New Zeal<strong>and</strong> projections indicate that by 2011 <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> its surrounding areas (excludingthe Papamoa East Growth Area) will have a catchment of approximately 17,000 people.• By 2031 the population projections for <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas are estimated to beapproximately 20,000.• It is estimated that seasonal workers increase the <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas population by anadditional 6,400 for four months of each year.• The Papamoa East growth area adjacent to <strong>Te</strong> <strong>Puke</strong> has an estimated future population of 30,000.This population, immediately adjacent to <strong>Te</strong> <strong>Puke</strong>, has the potential to have a significant impact onfacilities.All aquatic <strong>and</strong> indoor recreational facilities require a sufficient catchment population to generate a criticalnumber of users to make the facility operationally viable <strong>and</strong> less reliant on subsidies <strong>and</strong> grants from partners<strong>and</strong> other funders to meet costs.So long as the facility is correctly designed <strong>and</strong> managed to cater to community preferences <strong>and</strong> needs, thepopulation of <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> the surrounding areas (together with transient works) will provide a sufficientcritical population mass to make the proposed facility a viable operation. However, it will also be important toconsider users from outside of the area such as sports clubs from Tauranga who are unable to access requiredaquatic space <strong>and</strong> residents from the proposed Papamoa East development area. This will be particularlyimportant when considering the aquatic component of the proposed facility (indoor pool vs. outdoor pool).A more detailed analysis of the section is outlined below which provides an overview of the demographic data.These data are drawn from Statistics New Zeal<strong>and</strong>’s 2006 Census unless stated otherwise.2.1 <strong>Te</strong> <strong>Puke</strong> PopulationThe population of <strong>Te</strong> <strong>Puke</strong> is broken down into <strong>Te</strong> <strong>Puke</strong> West <strong>and</strong> East in the New Zeal<strong>and</strong> Census. The 2006census identified that 2,916 people usually live in <strong>Te</strong> <strong>Puke</strong> West, an increase of 63 people, or 2.2 percent, sincethe 2001 Census. It also identified that 4,164 people usually live in <strong>Te</strong> <strong>Puke</strong> East in 2006. This represents anincrease of 246 people, or 6.3 percent, since the 2001 Census.The total number of persons living within <strong>Te</strong> <strong>Puke</strong> at the 2006 Census was 7,080 (Table 1).8


Table 1: Population - 2006 Census<strong>Te</strong> <strong>Puke</strong> West <strong>Te</strong> <strong>Puke</strong> East <strong>Te</strong> <strong>Puke</strong> TotalMale 1,449 1,938 3,387Female 1,467 2,226 3,693Total 2,916 4,164 7,080Source: 2006 Census Population2.2 Ethnic GroupsSource: 2006 Census PopulationTable 2: Ethnic Groups (%) - 2006 Census<strong>Te</strong> <strong>Puke</strong> West <strong>Te</strong> <strong>Puke</strong> East Bay of PlentyEuropean 60.2 69.9 67.1Māori 30.2 20.7 27.5Pacific peoples 3.1 3.7 2.6Asian 8.0 5.6 3.2Middle Eastern/Latin American/African 0.2 0.3 0.3Other ethnicity 10.2 11.2 12.3People of European ethnicity make up over 60 percent of residents in the two <strong>Te</strong> <strong>Puke</strong> wards. The next mostdominant ethnicity is Maori who comprise approximately 30 percent of the West ward <strong>and</strong> 20 percent of theEast ward. People of Asian ethnicity were more dominant than Pacific peoples (Table 2).In <strong>Te</strong> <strong>Puke</strong> East 17.2 percent of the people were born overseas, compared to 14.9 percent for Bay of PlentyRegion as a whole. By comparison 15.4 percent of the people in <strong>Te</strong> <strong>Puke</strong> West were born overseas.Different ethnic groups tend to favour different sporting <strong>and</strong> recreational opportunities. Underst<strong>and</strong>ing thesepreferences assists in planning facilities <strong>and</strong> programmes. Tailored programmes are more likely to beoperationally viable (<strong>and</strong> potentially revenue generating), as well as meeting the needs of the community as awhole. The popular sports for different ethnic groups are outlined in the ‘Trends in Sport’ section of thisreport.2.3 Population – Including Surrounding AreasCensus areas surrounding <strong>Te</strong> <strong>Puke</strong> East <strong>and</strong> West have also been included as their populations will be keypotential users of any new facilities built within <strong>Te</strong> <strong>Puke</strong> (Table 3).The key assumption is that the areas directly adjacent to <strong>Te</strong> <strong>Puke</strong> view <strong>Te</strong> <strong>Puke</strong> as ‘their’ town centre with thetravel distance to <strong>Te</strong> <strong>Puke</strong> being considered acceptable at approximately 15 minutes for most.This potential catchment population of approximately 15,000 people will be vital to ensuring that a criticalcatchment mass exists to make the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation a viable operation.9


Table 3: Census Areas Surrounding <strong>Te</strong> <strong>Puke</strong>Census Area2006 CensusOhauiti-Ngapeke 648Upper Papamoa 2,070Paengaroa 900Rangiuru 2,028Pongakawa 2,988<strong>Te</strong> <strong>Puke</strong> West 2,916<strong>Te</strong> <strong>Puke</strong> East 4,164Total 15,714Source: 2006 Census Population2.4 Population ProjectionsThe population projections from Statistics New Zeal<strong>and</strong> identify that <strong>Te</strong> <strong>Puke</strong> East <strong>and</strong> West are expected tohave a combined population of 7,670 by 2011, rising to 9,180 people by 2031 (Table 4).Note: When undertaking population projections Statistics New Zeal<strong>and</strong> use a slightly different baseline for the2006 year than the actual 2006 census data.Table 4: Population ProjectionsArea 2006 2011 2016 2021 2026 2031<strong>Te</strong> <strong>Puke</strong> West 3,040 3,180 3,370 3,550 3,720 3,850<strong>Te</strong> <strong>Puke</strong> East 4,290 4,490 4,740 4,960 5,160 5,330Total 7,330 7,670 8,110 8,510 8,880 9,180Source: Area Unit Population Projections by <strong>Te</strong>rritorial Authorities, Age <strong>and</strong> Sex, 2006(base)-2031 update2.5 Population Projections including surrounding areasThe population projections for the areas surrounding <strong>Te</strong> <strong>Puke</strong> also indicate a steady increase in populationover the next twenty years (Table 5).The growth in the projected populations indicates that the proposed facility would be meeting theneeds of a growing catchment over time. Assuming the 2011 projections the catchment wouldincrease from approximately 17,000 people to a total of 20,000 people by 2031. Source: Area UnitTable 5: Population Projections - including surrounding areasArea 2006 2011 2016 2021 2026 2031Ohauiti-Ngapeke 670 750 830 910 990 1,060Upper Papamoa 2,070 2,280 2,420 2,560 2,690 2,810Paengaroa 930 950 1,000 1,030 1,070 1,090Rangiuru 2,090 2,150 2,180 2,200 2,200 2,180Pongakawa 3,080 3,290 3,430 3,550 3,660 3,730<strong>Te</strong> <strong>Puke</strong> West 3,040 3,180 3,370 3,550 3,720 3,850<strong>Te</strong> <strong>Puke</strong> East 4290 4,490 4,740 4,960 5,160 5,330Total 16,170 17,090 17,970 18,760 19,490 20,050Population Projections by <strong>Te</strong>rritorial Authorities, Age <strong>and</strong> Sex, 2006(base)-2031 update10


2.6 Population Projections – Age BreakdownsAn underst<strong>and</strong>ing of current <strong>and</strong> future age breakdown of a community is also essential when planning forboth facility <strong>and</strong> programme design. This is important when developing a realistic operational plan, as themajority of indoor recreation facilities (aquatic or recreation) have youth as one of their major user groups.Although all age ranges use aquatic facilities <strong>and</strong> recreation centres, those aged 0 – 39 are traditionally thedominant users of such facilities. The combined age bracket of 0 -39 is projected to increase slightly in <strong>Te</strong> <strong>Puke</strong><strong>and</strong> in most of the surrounding areas (Table 6).Table 6: Projected Catchment Age BreakdownsYear at 30 June 2006 2011 2016 2021 2026 2031AreaAge (years)Ohauiti-Ngapeke 0-14 Years 120 150 180 200 210 22015-39 Years 170 190 200 220 250 27040-64 Years 280 300 300 310 310 31065 Years <strong>and</strong> over 90 120 150 190 220 260Total All Ages 670 750 830 910 990 1060Upper Papamoa 0-14 Years 460 450 460 470 470 48015-39 Years 590 640 640 680 690 70040-64 Years 840 950 980 940 920 92065 Years <strong>and</strong> over 180 240 340 470 610 720Total All Ages 2,070 2,280 2,420 2,560 2,690 2,810Paengaroa 0-14 Years 250 240 230 230 230 23015-39 Years 280 280 280 280 290 29040-64 Years 300 330 360 360 340 35065 Years <strong>and</strong> over 90 100 130 160 210 230Total All Ages 930 950 1,000 1,030 1,070 1,090Rangiuru 0-14 Years 550 530 500 480 440 42015-39 Years 610 570 560 550 540 54040-64 Years 760 820 810 790 760 71065 Years <strong>and</strong> over 170 230 300 380 450 510Total All Ages 2,090 2,150 2,180 2,200 2,200 2,180Pongakawa 0-14 Years 700 700 690 690 670 64015-39 Years 960 980 960 930 940 91040-64 Years 1,130 1,250 1,310 1,330 1,270 1,27065 Years <strong>and</strong> over 280 350 470 600 780 910Total All Ages 3,080 3,290 3,430 3,550 3,660 3,730<strong>Te</strong> <strong>Puke</strong> West 0-14 Years 710 680 710 750 760 75015-39 Years 1,000 1,040 1,070 1,110 1,120 1,06040-64 Years 920 1000 1050 1050 1090 118065 Years <strong>and</strong> over 410 460 550 640 750 860Total All Ages 3,040 3,180 3,370 3,,550 3,720 3,85011


<strong>Te</strong> <strong>Puke</strong> East 0-14 Years 840 910 960 1,010 990 97015-39 Years 1,160 1,120 1,160 1,140 1,200 1,22040-64 Years 1,280 1,350 1,390 1,440 1,430 1,48065 Years <strong>and</strong> over 1,020 1,110 1,230 1,380 1,540 1,660Total All Ages 4,290 4,490 4,740 4,960 5,160 5,330Source: Area Unit Population Projections by <strong>Te</strong>rritorial Authorities, Age <strong>and</strong> Sex, 2006(base)-2031 updateRecent Sport <strong>and</strong> <strong>Recreation</strong> New Zeal<strong>and</strong> (SPARC) survey work indicates that the older population isbecoming more active <strong>and</strong> are participating more in both formal <strong>and</strong> informal sport <strong>and</strong> recreation activity.The aging population of <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas presents an opportunity to provide programmes forthe older adults (particularly aquatic programmes).2.7 Population Projections including the Papamoa East Growth AreasThe growth area of Papamoa East, together with its related infrastructure, has the potential to have asignificant impact on <strong>Te</strong> <strong>Puke</strong> facility user numbers. With a potential population of 30,000 within the proposedPapamoa East growth area the potential exists for the proposed <strong>Te</strong> <strong>Puke</strong> facility to double its potentialcatchment size.However, a greater underst<strong>and</strong>ing of the area’s proposed sporting <strong>and</strong> recreational facilities will be essential.As Tauranga City Council (TCC) has only just commenced considering the area’s potential community facilityneeds it remains too early to say what impact the area will have on the proposed <strong>Te</strong> <strong>Puke</strong> facilities. However,potential for joint planning <strong>and</strong> a partnership with TCC (particularly for an aquatic facility) may be a possibilityas the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility is relatively close to Papamoa East.Table 7: Population Projections including the Papamoa East Growth AreasCensus Stats 2006 2011 2016 2021 2026 2031 2036* 2041* 2046* 2051*Ohauiti-Ngapeke 670 750 830 910 990 1060Upper Papamoa 2070 2280 2420 2560 2690 2810Paengaroa 930 950 1000 1030 1070 1090Rangiuru 2090 2150 2180 2200 2200 2180Pongakawa 3080 3290 3430 3550 3660 3730<strong>Te</strong> <strong>Puke</strong> West 3040 3180 3370 3550 3720 3850<strong>Te</strong> <strong>Puke</strong> East 4290 4490 4740 4960 5160 5330Sub Total 16,170 17,090 17,970 18,760 19,490 20,050* Statistics NZ does not provide a breakdown per census unit past 2031 for population projectionsSmartGrowth Stats 2006 2011 2016 2021 2026 2031 2036* 2041* 2046* 2051*Papamoa East- Wairakei 0 1050 3304 6500 9604 11995 11995 11995 11995 11995Papamoa East- <strong>Te</strong> Tumu 0 0 0 0 714 2355 6260 10167 14487 19068Sub Total 1,050 3,304 6,500 10,318 14,350 18,255 22,162 26,482 31,063Total * 18,140 21,274 25,260 29,808 34,400* Census stats including smart growth statistics for Papamoa EastSource: Area Unit Population Projections by <strong>Te</strong>rritorial Authorities, Age <strong>and</strong> Sex, 2006(base)-2031 updateSource: SmartGrowth Stats12


2.8 Population – Seasonal WorkersWith <strong>Te</strong> <strong>Puke</strong> being located within the main Kiwi fruit producing area consideration of seasonal workers willalso need to be taken into account. It is estimated that of all the seasonal workers that come to the WesternBay of Plenty, approximately three quarters go to <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> its surrounding areas (this is estimated toequate to an additional 6,400 people).This increase comes in the period between February <strong>and</strong> May. These seasonal workers are made up of bothNew Zeal<strong>and</strong> <strong>and</strong> overseas workers.There are plans for the introduction of new varieties / species of fruit. It is anticipated that this will see anincrease in production that in turn will increase the number of seasonal workers coming into the area. Theseason may also be extended as a result of the new crops, meaning workers will likely stay in the area forlonger.Current seasonal workers are reported to be accommodated by pack houses in <strong>and</strong> around <strong>Te</strong> <strong>Puke</strong>. Theseworkers often live at camping grounds, rent or board locally, live at the local hotel, or rent <strong>and</strong> board inPapamoa.The sporting <strong>and</strong> recreational needs of these seasonal workers will need to be taken into consideration.13


3.0 Growth StrategiesTo accommodate the projected population growth of <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> its surrounding areas in a planned manner,a number of ‘Growth Management Strategies’ have been developed. These ‘Growth Management Strategies’have been developed, at a regional <strong>and</strong> sub regional level, to provide for the integrated <strong>and</strong> aligned planning<strong>and</strong> development management of future population growth.The key considerations from the growth strategies section are identified in the below box.Key Considerations of the SectionThe growth management strategies that have been developed for <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas identify keyrecreational components that should be considered as part of the long term future for <strong>Te</strong> <strong>Puke</strong>.Key outcomes for <strong>Te</strong> <strong>Puke</strong> were identified as:• The need for a pool complex, with integrated aquatic <strong>and</strong> recreational facilities, should beinvestigated <strong>and</strong> resolved.• A potential aquatic <strong>and</strong> recreational facility should service the areas of Papamoa, Paengaroa,<strong>Puke</strong>hina <strong>and</strong> Maketu.In essence the community, who were involved in the development of the <strong>Te</strong> <strong>Puke</strong> Long <strong>Te</strong>rm DevelopmentPlan, have already supported the general concept of the development of an aquatic <strong>and</strong> recreational facility tomeet the future requirements of <strong>Te</strong> <strong>Puke</strong> residents.The SmartGrowth work underscores that the areas surrounding <strong>Te</strong> <strong>Puke</strong> will undergo considerable growth infuture years. This growth will in turn require infrastructure, including sport <strong>and</strong> recreation facilities to meet theneeds of the wider population.A more detailed analysis of the section is outlined below which identifies the relevant ‘Growth ManagementStrategy’ documents <strong>and</strong> to highlight the relevant components that should be considered in the developmentof the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation study.3.1 Relevant ‘Growth Management Strategy’ Planning DocumentsThere are various ‘Growth Management Strategy’ <strong>and</strong> recreation planning documents that currently exist. Theplanning documents <strong>and</strong> information outlined below have been collated <strong>and</strong> presented to identify data ofrelevance to the <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation study.The ‘Growth Management Strategy’ planning documents that have been identified as most relevant are:1. <strong>Te</strong> <strong>Puke</strong> Long <strong>Te</strong>rm Development Plan 2004 – 20242. Smart Growth Plan14


3.2 <strong>Te</strong> <strong>Puke</strong> Long <strong>Te</strong>rm Development Plan 2004 -2024The <strong>Te</strong> <strong>Puke</strong> Long <strong>Te</strong>rm Development Plan 2004 -2024 was developed to provide a‘Blueprint for the community to use - a valuable tool to inform people where the <strong>Te</strong> <strong>Puke</strong> communitywants to go <strong>and</strong> how it plans to get there’.A key component of the plan was focused on the recreation <strong>and</strong> leisure outcomes for the <strong>Te</strong> <strong>Puke</strong> community.As part of the process a series of ‘<strong>Recreation</strong> <strong>and</strong> Leisure Vision <strong>and</strong> Outcomes’ where developed. Theseincluded:• ‘The people of <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounds are happy, fit <strong>and</strong> healthy’.• ‘<strong>Recreation</strong> <strong>and</strong> Leisure is accessible to all sectors of the community’.• ‘An indoor multi sports centre is built for <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> the wider sub region’.• ‘The need for a pool complex with integrated aquatic <strong>and</strong> recreational facilities has beeninvestigated <strong>and</strong> resolved’.• ‘Partnerships between Council, schools, tangata whenua, private sector groups <strong>and</strong> strategic partnersdeliver good outcomes’.• ‘Complementary recreational activities are positioned to maximise effort <strong>and</strong> resources in onelocation’.• ‘<strong>Te</strong> <strong>Puke</strong> hosts national <strong>and</strong> regional events’.The key considerations that were identified as part of the <strong>Te</strong> <strong>Puke</strong> Long <strong>Te</strong>rm Development Plan 2004 -2024for recreation <strong>and</strong> leisure, were:• ‘There may be an opportunity for a sub-regional, indoor multi-purpose sports facility to be built in <strong>Te</strong><strong>Puke</strong>. This facility could also service Mount Maunganui, Papamoa, Tauranga, Paengaroa, <strong>Puke</strong>hina<strong>and</strong> Maketu. A feasibility study will be undertaken to examine the need, viability, location <strong>and</strong> fundingrequirements to develop such a facility’.• ‘The <strong>Te</strong> <strong>Puke</strong> High School aquatic centre has served our community well for many years, <strong>and</strong> willcontinue to in the short to medium term. However, there is concern that in the long term, the existingpool complex will not meet the community’s needs. This issue will need to be carefully evaluated,together with other aquatic developments in the eastern area. It is noted that Tauranga is building anaquatic facility’.3.3 SmartGrowthSmartGrowth was launched in 2004 <strong>and</strong> involves stakeholders such as Tauranga City Council, Western Bay ofPlenty District Council, <strong>and</strong> Environmental Bay of Plenty, Tangata Whenua, Central Government <strong>and</strong> theprivate sector.‘SmartGrowth has been identified as playing a key role in preparing the Western Bay for thefuture, such as planning major transportation projects, business parks, new urban centres,recreational facilities <strong>and</strong> the protection of the natural environment.’15


SmartGrowth Eastern CorridorThe SmartGrowth Eastern Corridor covers the areas of Papamoa East, <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> Rangiuru. This corridor is animportant area indentified for growth. The eastern corridor is projected to be home to up to 70,000 by 2051.The area is considered important as it provides the last large greenfields location close to Tauranga.By 2051 the eastern corridor has been identified to provide for the following:• 17,500 new homes.• A forecast of up to 70,000 people.• Majority of these people will live in Papamoa East (Wairakei Stage 1 <strong>and</strong> in the longer term, <strong>Te</strong> TumuStage 2).• 450 hectares of industrial development.• The Rangiuru Business Park, south of <strong>Te</strong> <strong>Puke</strong>.• Up to 100,000 square metres of shops, office <strong>and</strong> commercial activity.• Development of the Tauranga Eastern Motorway which will bypass <strong>Te</strong> <strong>Puke</strong>.• A new Primary School in Papamoa East.• A new High School in Papamoa.The SmartGrowth Eastern Corridor areasThe smart growth eastern corridor has been broken down into sub area. A key summary of these areas isoutlined below.1. <strong>Te</strong> <strong>Puke</strong><strong>Te</strong> <strong>Puke</strong> has a current population of approximately 6,700 people <strong>and</strong> another 8,000 people living insurrounding areas. The <strong>Te</strong> <strong>Puke</strong> population is projected to increase to 11,000 by 2021.There are moves to rezone approximately 72 hectares of l<strong>and</strong> from rural to industrial.2. Papamoa East Stage 1– WairakeiTauranga City Council has released a decision relating to the Papamoa East Stage 1– Wairakei. Thisdecision is that the proposed plan change 44, to rezone 420 hectares of future urban l<strong>and</strong> in PapamoaEast Stage 1, be adopted.This will allow for up to 12,600 people to be accommodated in residential areas in addition to 119hectares becoming business l<strong>and</strong> to serve the community. Wairakei will also have a town centre.3. Papamoa East Stage 2 – <strong>Te</strong> TumuIt is proposed that the <strong>Te</strong> Tumu development will provide for 28,000 residents <strong>and</strong> for 65 hectares ofbusiness l<strong>and</strong>. This proposed development has been identified as being unlikely to proceed before2016 <strong>and</strong> will be subject to a detailed planning process.4. Rangiuru Business ParkThe Rangiuru Business Park has been identified as having 148 hectares of business l<strong>and</strong>. The mainaccess route into <strong>and</strong> out of the business park will be via the Tauranga Eastern Motorway.16


4.0 Value of Sport of Sport <strong>and</strong> <strong>Recreation</strong>“Sport has the power to unite people in a way little else can. Sport can create hope. Breaksdown racial barriers … laughs in the face of discrimination … speaks to people in a languagethey can underst<strong>and</strong>.”- Nelson M<strong>and</strong>elaThere are many benefits that sport <strong>and</strong> recreation bring to a community which enhances people’s physical,social <strong>and</strong> even economic wellbeing. Many studies have been undertaken in recent times that have examinedthe value of sport. The Western Australian State Government has undertaken one such comprehensive study.The findings of which are very similar to other international research.The key findings of the Western Australian State Government study on the value of sport <strong>and</strong> recreation areidentified below.Key Considerations of the SectionInternational research has identified that increasing community participation in organised sport <strong>and</strong> recreationcontributes positively to the following components of a community in the below ways:• Builds communities.• Develops social inclusion.• Reduces anti-social behavior.• Improves education.• Improves physical <strong>and</strong> mental well being.• Assists economic growth.• Aids urban <strong>and</strong> regional regeneration.The proposed aquatic <strong>and</strong> indoor recreation centre development at <strong>Te</strong> <strong>Puke</strong> will provide much more than justa sport <strong>and</strong> recreation facility. For example, potential water polo competitions (that require space in theWestern Bay of Plenty) could drive additional spending on accommodation <strong>and</strong> goods <strong>and</strong> services while theproposed facility itself would generate employment.Social benefits would also be derived from the proposed aquatic <strong>and</strong> indoor recreation centre. The facilitycould serve to help create new relationships among disparate social groups (for examples between transientworkers <strong>and</strong> the local population).It would also undoubtedly assist in developing stronger social networks <strong>and</strong> opportunities for socialengagement amongst residents (through activities such as social sports programmes).The wider benefits of sport <strong>and</strong> recreation have been well researched <strong>and</strong> the proposed aquatic <strong>and</strong> indoorrecreation centre would certainly be able to foster many of these benefits within <strong>Te</strong> <strong>Puke</strong>.17


The Western Australian State Government study which is outlined below analyses the key considerations infurther detail.4.1 Building CommunitiesSporting <strong>and</strong> recreational activities <strong>and</strong> events contribute to the development of stronger social networks <strong>and</strong>more cohesive communities (for participants, volunteers <strong>and</strong> supporters). They provide opportunities forsocial engagement; often creating awareness <strong>and</strong> acceptance of differences between individuals <strong>and</strong>communities.This is especially evident in rural communities, where traditional Saturday sports such as football <strong>and</strong> netballare the glue that bonds the community; often acting as the main community social event for the week.Generally, places with high levels of social capital are safer, better governed <strong>and</strong> more prosperous, comparedto those places with low levels of social capital (Putnam, 2000).4.2 Social InclusionSport <strong>and</strong> recreation is a key medium for creating new relationships among disparate social groups. Peoplefrom culturally <strong>and</strong> linguistically diverse backgrounds can be vulnerable to social <strong>and</strong> structural disconnection.Participation in sport provides increased opportunities to connect with the wider community (Savage, et al.,2003).This is where sport <strong>and</strong> recreation provides some of its greatest value; it’s about including people in arewarding shared experience <strong>and</strong> making individuals <strong>and</strong> our community stronger through the process.4.3 Supporting EducationInternational studies have identified strong positive effects of physical activity on cognitive functioning <strong>and</strong>academic ability. Previous literature reviews relating to the effects of physical activity on cognitive functioningdemonstrates that:• There may be short term benefits of physical activity on concentration.• There is a positive relationship between physical activity <strong>and</strong> cognitive functioning.• Acute bouts of physical activity exert short term benefits on cognitive functioning (especially withyouth).Most university based (internationally published) research has found a positive association between children’slevels of physical activity or sport <strong>and</strong> cognitive functioning (<strong>and</strong> academic success).4.4 Improving our well beingSport plays a key role in improving the physical <strong>and</strong> psychological wellbeing of individuals, <strong>and</strong> therefore thewider community. Participation in sport can contribute to higher levels of self esteem, motivation <strong>and</strong> selfworth. It can contribute to the prevention of obesity, relieve symptoms of arthritis <strong>and</strong> positively influence theimmune system. It helps people improve <strong>and</strong> maintain cognitive abilities into older age, <strong>and</strong> may prevent thedevelopment of dementia <strong>and</strong> Alzheimer’s disease.18


4.5 Reduced anti-social behaviourCommunity safety issues, such as youth offending <strong>and</strong> anti social behaviour, can be assisted through sportsintervention programs.By targeting those at risk of offending, participation in sport provides positive alternatives by creatingopportunities to learn new skills, develop confidence, enhance self esteem <strong>and</strong> importantly to reduceboredom <strong>and</strong> apathy, both of which can be triggers for at risk behaviours.Sport <strong>and</strong> recreation can help divert young people from crime <strong>and</strong> anti social behaviour. It can also targetthose young people most at risk of committing crime <strong>and</strong> help their rehabilitation <strong>and</strong> development.Sport <strong>and</strong> recreation is an ideal medium for social inclusion <strong>and</strong> support for at risk members of our society. Itcan also help provide a level playing field <strong>and</strong> can therefore help bridge gaps in our society in a positive <strong>and</strong>constructive manner.4.6 Economic GrowthSport <strong>and</strong> recreation can also play a major role in the economic growth of a community. This is by way ofsporting <strong>and</strong> recreational events <strong>and</strong> competitions, employment generation, infrastructure investment <strong>and</strong>through the attraction of additional visitors.• Events <strong>and</strong> tourismSporting events have the potential to attract additional visitors to an area who thencontribute to the economy through their spending on things such as accommodation <strong>and</strong>goods <strong>and</strong> services. <strong>Te</strong>nnis tournaments within <strong>Te</strong> <strong>Puke</strong> are examples of small local eventswhich attract people from outside of the area to come play <strong>and</strong> spend within <strong>Te</strong> <strong>Puke</strong>.• EmploymentSport <strong>and</strong> recreation is a large employer. From facility managers, sports administrators,trainers, coaches, officials <strong>and</strong> athletes, to educators <strong>and</strong> event managers, to tourism <strong>and</strong>retail; sport <strong>and</strong> recreation cut across many sectors creating a broad <strong>and</strong> diverse industry. <strong>Te</strong><strong>Puke</strong> residents within the sport <strong>and</strong> recreation sector have to leave or commute to othercentres to achieve their goals• Increasing productivityResearch suggests a direct correlation between the health of an individual <strong>and</strong> their level ofproductivity. Healthy, fit employees are more likely to be productive, with increased output(due to improved attitude <strong>and</strong> motivation changes derived from positive leisure experiences)(Australian Government, 2004).• Infrastructure investmentThe investment in sporting infrastructure is significant even at a local level. From sportsgrounds, to recreation centres to aquatic facilities the construction industry can benefitenormously on sporting facility developments. The recent Centennial Park development, theproposed Jamieson Oval/Jubilee Park redesign <strong>and</strong> the future No 3 Road active sport reserveare example of investment in sport <strong>and</strong> recreation infrastructure within <strong>Te</strong> <strong>Puke</strong>.19


4.7 Urban <strong>and</strong> Regional RegenerationInvestment in sports facilities can bolster a community’s perception of their local area, restoring pride in theirregion <strong>and</strong> improving future social <strong>and</strong> economic possibilities. Communities use sporting events to redefinetheir image, promote urban development <strong>and</strong> fund economic growth <strong>and</strong> regeneration.Where new facilities are established or redeveloped, often as a consequence of much hard work in fundraising<strong>and</strong> lobbying, the heightened sense of community achievement can be as valuable as the facility itself.“Sport is not a luxury in society. On the contrary, sport is an important investment in the present<strong>and</strong> the future.”Walter Fust, Director General, Swiss Agency for Development <strong>and</strong> Cooperation (2005)20


5.0 Council/School Facility Partnerships Learnings5.1 IntroductionFacility partnerships are increasingly being considered to meet the sporting <strong>and</strong> leisure needs of both thewider community <strong>and</strong> school students. Research from New Zeal<strong>and</strong> <strong>and</strong> internationally demonstrates thatthey can be extraordinarily successful. However, this success in the vast majority of cases comes about fromcareful planning rather than by luck. Partnerships are not like other development propositions <strong>and</strong> must betreated differently in terms of planning, design, development <strong>and</strong> operation.The key considerations from the territorial authority/school facility partnership learning’s section are identifiedin the below box.Key Considerations of the SectionThe majority of partnerships can be envisaged to have four general phases. These are:1. Preliminary strategic planning <strong>and</strong> needs analysis.2. Project planning <strong>and</strong> needs analysis.3. Negotiation detailed project planning <strong>and</strong> design.4. Operation.These general phases can be broken down into further areas where key learnings, which are considered criticalin developing a successful facility partnership, have been identified as follows.• Preliminary <strong>Feasibility</strong> <strong>and</strong> Capital Development Funding (“Capx”) Considerations• Operational Costs (“Opex”) Considerations• Revenue Considerations• Governance <strong>and</strong> Management Considerations• Negotiation, Agreements <strong>and</strong> Documentation Considerations• Full <strong>Feasibility</strong>• Project Management <strong>and</strong> Consultant Appointments• Project Planning <strong>and</strong> Design• Governance Considerations• Management Considerations• Monitoring ConsiderationsThe <strong>Te</strong> <strong>Puke</strong> High School Community <strong>Aquatic</strong> And <strong>Recreation</strong> Facility development, through this feasibilitystudy, has followed the initial one <strong>and</strong> two general phases along with their related components.As the development of the proposed <strong>Te</strong> <strong>Puke</strong> School facilities continues it is recommended that phases three<strong>and</strong> four of the key partnership phases, together with their related components, be followed to enableeffective practise to continue.21


5.2 Key LearningsThe following section outlines the key learnings in further detail that have been identified from the NewZeal<strong>and</strong> <strong>and</strong> UK review of facility partnerships between local authorities <strong>and</strong> schools.5.2.1 Preliminary <strong>Feasibility</strong> <strong>and</strong> Capital Development Funding (“Capx”) Considerations• Be prepared to do your research - review information on the different funding organisations’application processes <strong>and</strong> timeframes, examine past grant allocations, talk with staff at the differentcharitable funders <strong>and</strong> discuss with other organisations in your local area how they went about theircapital development fundraising.• Develop a funding plan <strong>and</strong> programme which sets out the target budget <strong>and</strong> how <strong>and</strong> by when youplan to reach it. Use earlier funding research in order to ensure the sums sought from each potentialfunder remain realistic.• To avoid a conflict of interest when bringing in external expertise. Research, feasibility analysis <strong>and</strong>planning should be kept separate from professional fundraising.• Don’t get ahead of yourself by commissioning costly architectural concepts before you have looked atyour likely funding thresholds. Talk with a Project Manager or Quantity Surveyor about approximatem2 rates for different facility types so that you can compare this against your funding research <strong>and</strong>can estimate the cost <strong>and</strong> affordability of different facilities.• Don’t do any more design work than is absolutely necessary to fulfil each stage of the fundraisingprocess.5.2.2 Operational Costs (“Opex”) Considerations• Begin your research on operational costs early <strong>and</strong> be realistic. Resist the temptation to start lookingat arguably more interesting topics such as the detail of ‘facility design’. One could say:“...you get easily picked up <strong>and</strong> swept away by the detail of the architecture, like a prettypicture in a travel brochure, when what you really should be doing first up is readingwhen the cyclone season is! Consider the ongoing operational cost first, or you mayregret it later.”• Operational cost data should be incorporated into preliminary <strong>and</strong> detailed feasibility studies <strong>and</strong>later into a detailed business plan. Include different operational cost scenarios.• Consider long term operational <strong>and</strong> short term development tradeoffs early on in the projectplanning.• Discuss operational issues with your partners (potential partners) as early as possible in the process.5.2.3 Revenue Considerations• Undertake revenue research at an early stage in the project.• Undertake a market research exercise to establish what other facilities are in your general catchment<strong>and</strong> what they are offering users (including their fee structures).22


• Consider revenue generation issues in the development of the schedule of spaces <strong>and</strong> your designbrief.• As a general rule consider that:- Having two internal courts enables greater revenue generation as you can run casual leagueson a ‘pay for play’ basis.- The appropriate sizes of weights <strong>and</strong> aerobics spaces are important.- Don’t design a facility around basketball courts as netball courts are larger (hiring a facilityfor netball may provide another revenue option).- Casual ‘pay for play’ leagues <strong>and</strong> ‘memberships’ will generate more revenue than thestraight hiring out of a court or room.• Revenue generation is linked to the quality <strong>and</strong> type of management approach adopted.5.2.4 Governance <strong>and</strong> Management Considerations• Investigate the different governance <strong>and</strong> management models to see which of the differentapproaches is likely to work most effectively for your potential project.- Talk with other schools <strong>and</strong> trusts that operate facilities.- Draw up various models <strong>and</strong> a list of potential pros <strong>and</strong> cons for each.- Consult with the Ministry of Education (MOE) at both a regional <strong>and</strong> head office levelrequesting written feedback.- Talk with your potential partner/s (such as council <strong>and</strong> funders).- Seek advice from experienced advisors (ideally from individuals familiar with working onexisting partnership projects).- Consider what Council wants from the project long term <strong>and</strong> take this into consideration.5.2.5 Full <strong>Feasibility</strong>• At a basic level the full feasibility study should include material on:- Needs.- Strategic alignment.- Schedule of spaces.- Preliminary design brief.- Very preliminary concept plans.- Governance.- Management.- Operational costs.23


- Revenue streams.- Operating models (high, medium <strong>and</strong> low).- Capital development costs.- Capital fundraising plan.5.2.6 Negotiation, Agreements <strong>and</strong> Documentation Considerations• Always document what is discovered, discussed <strong>and</strong> agreed to from the outset of the project (this canbe done both formerly <strong>and</strong> informally).• Write all agreements as if they were being written for a person with no underst<strong>and</strong>ing of the project,or the partners involved (although the writer will use these agreements it is even more likely that, anas yet unknown person, will be the main user).• Take considerable time when developing service level agreements (SLA’s) <strong>and</strong> key performanceindicators (KPIs). Simplistic KPIs which are only developed around the number of users don’t tell thewhole story <strong>and</strong> may actually be detrimental <strong>and</strong> direct managers away from meeting certainstrategic community needs.• Talk with other Councils <strong>and</strong> Facility managers about their experiences <strong>and</strong> review a range ofmemor<strong>and</strong>um of underst<strong>and</strong>ing (MOU), heads of agreement (HOA), SLAs <strong>and</strong> contracts beforedeveloping your own.• Never assume anything - discuss, negotiate <strong>and</strong> document.5.2.7 Project Management <strong>and</strong> Consultant Appointments• <strong>Te</strong>nder <strong>and</strong> appoint an independent project manager (PM) <strong>and</strong> a quantity surveyor (QS) directly tothe client.• The PM should be in charge of running the project control group (PCG).• Consider the pros <strong>and</strong> cons of the design build <strong>and</strong> traditional design <strong>and</strong> construction tenderapproaches. In general very simple partnership developments may be suitable c<strong>and</strong>idates for thedesign build approach, but larger or more complex projects will generally not be.• Note that there are numerous variations on the design build <strong>and</strong> traditional design <strong>and</strong> tenderapproaches. Talk to Council staff, PM, Sports <strong>and</strong> Leisure Consultants <strong>and</strong> building owners about theirexperiences.• Either tender or appoint a “design team” under a single lead consultant (traditionally the architect), ortender a design build contract.24


5.2.8 Project Planning <strong>and</strong> Design• Prior to starting any detailed concept <strong>and</strong> design work do your preliminary <strong>and</strong> feasibility researcharound issues such as:- Strategic need- Funding- Operational cost- Revenue- Management / Governance- Schedule of spaces- Bulk <strong>and</strong> location plans• Make sure that your consultants underst<strong>and</strong> that you place importance on lowering potential ongoingoperational costs. State this as a requirement in your design brief.• Ensure the finalised design brief contains specific references to:- Operational efficiency.- Revenue maximisation.- Future proofing (ability to exp<strong>and</strong> or redevelop the building at a later date).- Community <strong>and</strong> student users.- The way in which the facility will be managed.• Don’t hold back on asking your design team about the operational implications of various designs <strong>and</strong>proposals.• As your plans develop seek feedback (design reviews) on the operational costs associated withdesigns from other facility managers or sports consultants.5.2.9 Governance Considerations• Read one of the numerous books on management <strong>and</strong> governance (the MOE <strong>and</strong> Sport <strong>and</strong><strong>Recreation</strong> New Zeal<strong>and</strong> (SPARC) are a good starting point for advice).• Clearly define the lines between governance <strong>and</strong> management.• Establish key performance indicators <strong>and</strong> undertake regular reporting.• Develop a succession plan.25


5.2.10 Management Considerations• In advance discuss the process that would be implemented if the selected management approach wasnot delivering the benefits that were envisaged by the partners.• Monitor the performance of the chosen management approach.5.2.11 Monitoring Considerations• Develop a balanced monitoring approach with both outcome <strong>and</strong> qualitative measures.• Monitor regularly <strong>and</strong> use the data to help inform management decisions.• Build in a review period so that the measures set out in the original partnership agreement can be reexamined<strong>and</strong> optimised in line with new strategic <strong>and</strong> community needs data.26


6.0 National Code Profiles <strong>and</strong> TrendsThe following section outlines available national sports code participation data. In 2007/08 SPARC surveyedthe New Zeal<strong>and</strong> population (aged 16 years <strong>and</strong> above) as part of their Active NZ Survey to determine howactive we are as a nation. The survey included questions on participation levels, profiles of participants,participation patterns <strong>and</strong> volunteering levels.Notes:1 All data have been obtained from SPARC’s 2007/08 Active NZ Survey released in August 2009.2 The survey excluded those under the age of 16 years (often a large proportion of club membership forsports like cricket, football <strong>and</strong> netball).The ‘Trends in Sport’ section has been developed in two parts: traditional sports/activities <strong>and</strong> non traditionalsports/activities. The traditional <strong>and</strong> non traditional sports <strong>and</strong> activities have been included where there isrelevance to the proposed facility <strong>and</strong> <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding communities 1 .The key considerations from the trends in sport section are identified in the below box.Key Considerations of the SectionThe trends in sport section has identified that many of the most popular sport <strong>and</strong> recreation past times foradult New Zeal<strong>and</strong>ers could be provided for within the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreationfacility. For example• Swimming had the 3rd highest adult participation levels in the country• Equipment based exercise was ranked 4 th highest• Basketball was the 17th most popular participation sport in the country.Youth participation has not been assessed in the SPARC research. However, we are aware that activities suchas football (soccer), netball, rugby, basketball <strong>and</strong> swimming are all very popular both at an organised <strong>and</strong>social level. All these activities are readily accommodated in the proposed facility.The continued growth of pay for play social sport will also provide opportunities for ‘social leagues’ to beundertaken at the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility. These activities if well planned <strong>and</strong>run should help make the facility a more viable operation. The facility could also provide youth with a range ofinformal sports league opportunities which are proving increasingly popular nationally.The key traditional <strong>and</strong> non traditional sports <strong>and</strong> activities that have been considered relevant to theproposed facility <strong>and</strong> <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding communities are further analysed below.1 Note: There are several sport <strong>and</strong> recreation activities that rated highly in terms of participation levels in the SPARC survey, but whichwere not considered relevant to this study. Examples of these activities are gardening, fishing <strong>and</strong> golf which all rate within the top 10sports <strong>and</strong> recreation activities.27


6.1 Traditional Sports <strong>and</strong> Activities6.1.1 SwimmingSPARC survey data for 2007/08 indicate that 34.7 % of all adults aged 16 years <strong>and</strong> over had participated inswimming at least once in the previous 12 months. Half of the 16.4% had undertaken their swimming at anindoor pool. Swimming had the 3rd highest participation levels in the country for those aged 16 years or over.Local contextThere are several swim clubs that utilise the <strong>Te</strong> <strong>Puke</strong> High School pool for their training requirements.Increased access to lane space was identified as a key issue by the swim clubs to assist with growing theirmembership. Currently <strong>Te</strong> <strong>Puke</strong> swimmers have to travel to Tauranga to continue with their swimming duringthe winter months when the high school pool is closed.Water Polo is extremely strong in the Western Bay of Plenty with a strong club <strong>and</strong> representative base.Currently there is limited access to pool space for water polo teams to practise <strong>and</strong> to hold competitions; thisis limiting the growth of their sport <strong>and</strong> membership.<strong>Te</strong> <strong>Puke</strong> High School in particular has a strong history with water polo having past regional <strong>and</strong> nationalrepresentatives. Flipper ball is also strong in the Western Bay of Plenty including <strong>Te</strong> <strong>Puke</strong>.An additional pool space suitable for water polo would be an asset for the Western Bay of Plenty district, withthe water polo community identifying they would utilise the <strong>Te</strong> <strong>Puke</strong> aquatic facility for training <strong>and</strong>competitions.6.1.2 Canoe/KayakSPARC survey data for 2007/08 indicate that 6.4 percent of all New Zeal<strong>and</strong> adults (209,648 people) hadparticipated in canoeing/kayaking at least once in the previous 12 months. Canoeing/kayaking had the 16thhighest participation rate among various sport <strong>and</strong> recreation activities.Local contextCanoe polo is extremely strong at <strong>Te</strong> <strong>Puke</strong> High School, with previous teams finishing as national champions.Increased access to water space is critical for their ongoing success. Kayaking is also reported to be strong inthe Bay of Plenty.6.1.3 BasketballSPARC survey data for 2007/08 indicate that 6.3 % of all adults aged 16 years <strong>and</strong> over had played basketball atleast once in the previous 12 months. Basketball was the 17 th most popular participation sport in the countryfor those aged 16 years or over.Local context<strong>Te</strong> <strong>Puke</strong> High School has basketball teams which participate in local <strong>and</strong> regional championships. Sport Bay ofPlenty is working with the <strong>Te</strong> <strong>Puke</strong> community <strong>and</strong> sports clubs to strengthen existing clubs <strong>and</strong> for otherorganisations to provide additional opportunities. Sport Bay of Plenty has indicated that there is potential forTauranga basketball to provide basketball leagues in <strong>Te</strong> <strong>Puke</strong> provided a suitable facility can be made available.Lack of facilities is seen as an impediment to the sports development.28


6.1.4 Equipment Based ExerciseNational ContextIn terms of participation, equipment based exercise was ranked 4 th highest amongst the various sports <strong>and</strong>recreation activities. Among adults who participated in equipment based exercise, 52.6% were women <strong>and</strong>47.4% were men.A large proportion of adults who participated in equipment based exercise identified themselves as NewZeal<strong>and</strong> European 73.4%, Maori 10.6% <strong>and</strong> Asian 9.3%.Local contextThere is a small commercial gym within <strong>Te</strong> <strong>Puke</strong> that provides the local community recreational opportunities.6.1.5 FootballNational ContextIn terms of participation football was ranked 23rd highest amongst the various sports <strong>and</strong> recreation activities.8.3% of men <strong>and</strong> 2.8% of women aged 16 years <strong>and</strong> over had participated in football at least once in the past12 months. Although participation in football did not significantly differ by ethnicity, most football participantsself-identified as New Zeal<strong>and</strong> European or Asian.Local context<strong>Te</strong> <strong>Puke</strong> United Football Club is the main football club in the area with men’s, women’s <strong>and</strong> junior teams.There is the potential for social indoor football leagues to be established if a suitable indoor facility wasdeveloped. Social indoor football leagues are extremely popular nationally.6.1.6 NetballIn terms of participation rates Netball was ranked 28 th . Among adults who participated in netball at least oncein 12 months, 58.1% had participated in an organised competition or event. Of all netball participants 88.3%were women, the majority were aged 16-24 years <strong>and</strong> most self-identified as Maori, Pacific or NZ European.Local context<strong>Te</strong> <strong>Puke</strong> has a local netball association adjacent to the high school. Netball membership numbers are currentlydecreasing, but Sport Bay of Plenty is working with the association to increase their capability. Sport Bay ofPlenty has indicated that the social element of netball at the <strong>Te</strong> <strong>Puke</strong> Association is still strong, with the seriousteams heading to Tauranga to compete.There is the potential for social indoor netball leagues to be developed if a suitable indoor facility wasdeveloped. Social indoor netball leagues are extremely popular nationally.6.1.7 TouchIn terms of participation touch was ranked 15 th highest amongst the various sports <strong>and</strong> recreation activities.9.3% of men <strong>and</strong> 4.1% of women in the 16 years <strong>and</strong> over had played touch at least once in the previous 12months.Of those adults who participated in touch at least once in the past 12 months:29


• 68.8% were men <strong>and</strong> 31.2% were women• 47.9% were aged 16 – 24 years, <strong>and</strong>• 51.2% were NZ European, 35.1% were Maori, 18.9% were Pacific <strong>and</strong> only 5.0% were AsianLocal contextThere is the potential for social indoor touch leagues to be developed if a suitable indoor facility wasdeveloped. Social indoor touch leagues are extremely popular nationally during winter months.6.1.8 RugbyRugby was the 21 st most popular participation sport in the country for those aged 16 years or over. Whensurvey responses were weighted to be representative of the New Zeal<strong>and</strong> adult population 189,661 peoplewere estimated to have participated in rugby at least once over 12-months.Local contextThere are several rugby clubs surrounding the <strong>Te</strong> <strong>Puke</strong> area which complement the <strong>Te</strong> <strong>Puke</strong> Rugby Club. Theywill be potential users of the gym, pool <strong>and</strong> indoor courts for training purposes both in the off season <strong>and</strong>during the season.6.2 Non Traditional Sports <strong>and</strong> ActivitiesSPARC state that participation in recreation is changing <strong>and</strong> New Zeal<strong>and</strong>ers are dem<strong>and</strong>ing more informalsports participation opportunities that are closer to where they live, are flexible <strong>and</strong> can fit into their busyschedules.The major challenges will be to identify the activities which will be most relevant to the population <strong>and</strong> thatcan be accommodated within a multipurpose facility. The non traditional sports <strong>and</strong> activities outlined belowhave been highlighted as having the most potential to be accommodated within the <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong>indoor recreation facility development.6.2.1 Pay for Play <strong>and</strong> Social ‘Leagues’The rise in popularity of informal sport (pay as you play) opportunities has continued to widen the sportsspectrum.The majority of pay for play opportunities are being provided by commercial <strong>and</strong> council facility operators.Most of these opportunities are strongly based on the social element of playing with friends <strong>and</strong> family. Theability for people not to have to belong to clubs <strong>and</strong> to just turn up with everything provided (facility, refereesetc) <strong>and</strong> play is a major factor in the popularity of social leagues. Leagues can also be financially rewarding forthe commercial <strong>and</strong> council operators.Some sports have also begun to see the advantages of social pay for play <strong>and</strong> have started to provideopportunities within their sporting settings.6.2.2 Ethnic SportsAs the New Zeal<strong>and</strong> population becomes more ethnically diverse many communities are establishing their ownethnic sports teams <strong>and</strong> leagues. They also participate informally in a range of sports.30


The <strong>Te</strong> <strong>Puke</strong> region has a higher percentage of people of Asian ethnicity (8.0% for <strong>Te</strong> <strong>Puke</strong> West <strong>and</strong> 5.6% for<strong>Te</strong> <strong>Puke</strong> East) than the Bay of Plenty as a whole (3.2%). The area also has a high transient population many ofwhom are reported to likely be of Asian <strong>and</strong> Pacific ethnicity.Previous research on the sporting needs of the Asian immigrant population identified the following sports asbeing popular:• Table <strong>Te</strong>nnis.• Badminton.• Football.• Basketball.These activities’ are most often associated with people from South East Asia. People with other ethnicbackgrounds have different sporting interests (for example people with Asian sub continent ethnicbackgrounds are more interested in sports such as cricket).The proposed <strong>Te</strong> <strong>Puke</strong> indoor recreation facility will be able to provide a wide range of opportunities whichalign with the special interests of many populations.31


7.0 Network of FacilitiesThere are a number of aquatic <strong>and</strong> indoor recreation facilities throughout the surrounding areas of <strong>Te</strong> <strong>Puke</strong>which currently provide sport <strong>and</strong> recreation opportunities.The proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> recreation facility would have a vital role to play in the northern part ofWestern Bay of Plenty ‘network’ of sport <strong>and</strong> recreation facilities (particularly in the wider network of sport<strong>and</strong> recreation facilities in the southern part of Tauranga).To avoid duplication it is important that the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> recreation facility is not only in adesirable geographic location, but also has a planned role or niche within the hierarchy of current <strong>and</strong>proposed facilities.The key considerations from the network of facilities section are identified in the below box.Key Considerations of the SectionThe review of the existing network of aquatic <strong>and</strong> indoor recreation facilities has highlighted that <strong>Te</strong> <strong>Puke</strong> haslimited access to indoor sport <strong>and</strong> recreation facilities. The key findings are:• <strong>Te</strong> <strong>Puke</strong> has one pool of sufficient size for club <strong>and</strong> community use, but this is soon due for closure.Excluding sports fields <strong>and</strong> hard courts, a high school gym <strong>and</strong> one indoor court (owned by a sportsclub) are the only recreation facilities of note (even these facilities have constrained use).• Unless major facilities are developed in Papamoa East the current lack of adequate facilities supportsthe need for <strong>Te</strong> <strong>Puke</strong> to develop additional aquatic <strong>and</strong> indoor recreation facilities for its current <strong>and</strong>future population.• The surrounding areas close to <strong>Te</strong> <strong>Puke</strong> are currently serviced by primary school pools over thesummer months. The majority of the primary schools have their own ‘learn to swim’ pool with accessfor their local community being provided on a casual basis after school hours.• Some schools are planning pool developments such as extensions to existing small pools, or new 20 or25m pools (Fairhaven, Paengaroa, <strong>Te</strong> Ranga). Two schools are also planning to enclose their 20mpools in the future.• The planned primary school developments have secured varied levels of funding to date. It would berealistic to assume that some of the planned developments, but not all will go ahead. However, evenwith the planned ‘learn to swim’ aquatic facilities at local <strong>and</strong> surrounding primary schools there willstill not be sufficient recreational pool space to meet the needs of the wider community, noradequate swim squad <strong>and</strong> water polo water space.• Bay Wave in Tauranga is the closest aquatic facility open 12 months of the year that could providesome of the recreational <strong>and</strong> swim sport needs of the <strong>Te</strong> <strong>Puke</strong> residents. However BayWave isexperiencing capacity at peak times so cannot accommodate new users during peak times.• There is no public transport to Tauranga• With regards to indoor recreation space there is currently no community focused indoor recreationcentre in <strong>Te</strong> <strong>Puke</strong>, or surrounding areas, apart from the <strong>Te</strong> <strong>Puke</strong> High School gymnasium (which canno longer accommodate community use) <strong>and</strong> the <strong>Te</strong> <strong>Puke</strong> Sports Club indoor court. The closestindoor community recreation centre is the Mount Action <strong>Centre</strong> in Tauranga; although the newTauranga Indoor Sports <strong>and</strong> Exhibition <strong>Centre</strong> will be closer when it opens next year.32


• There is a planned one court indoor facility at Pongakawa School which will service the school <strong>and</strong> itsimmediate local area. To date only about half the costs have been raised towards this project. Thelack of existing, or planned, accessible indoor recreation space for <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> its surrounding areasis an identified gap, which will need to be addressed.The proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility would help fill the shortfall of pool <strong>and</strong> indoorrecreation space. However, it will be important for the proposed facility to be considered as part of a networkof existing <strong>and</strong> future facilities (for both the Western Bay of Plenty <strong>and</strong> Tauranga Councils), so as to avoidduplication.The future growth area of Papamoa East with a potential population of up to 30,000 will have a significantimpact on the nature <strong>and</strong> scale of the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility. Tauranga City’sfuture planning for this area should take into consideration <strong>Te</strong> <strong>Puke</strong>’s proposed aquatic <strong>and</strong> indoor recreationfacility as it is located only a short distance from the Papamoa East area.The potential exists for a partnership between the two Councils, particularly in regards to the provisions ofaquatic facilities, <strong>and</strong> it is recommended that the Tauranga City Council be included in the project team todevelop the next phase of the <strong>Te</strong> <strong>Puke</strong> High School facilities.The information outlined below provides further detail to the network of existing <strong>and</strong> planned aquatic <strong>and</strong>indoor recreation facilities in <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas.7.1 <strong>Te</strong> <strong>Puke</strong> High School FacilitiesFacilityTypeOutdoorPoolIndoorGymnasiumFacilitySize33m x 8lane.Dive well.Learn toswim pool.1 IndoorbasketballcourtHeating Facility Age Meet schoolrequirements?Yes 49 Years The high schoolOpened in 1961 is utilising thecurrent pool atcapacity duringthe summermonths.Approximately35 – 40 yearsAs with thepool, the highschool isutilising thecurrentgymnasium atcapacity duringschool time.Community useThe pool is hired outby swim squads aswell as utilised by thecommunity forrecreational useduring the summermonths.The pool is utilisedfor swimmingcompetitions byschools <strong>and</strong> clubsfrom surroundingareas.Until recent yearsthey shared the useof the gymnasiumwith a variety ofcommunity groups.However, increaseduse by the school asa result of rollgrowth hasprevented thecontinuation of thisarrangement.CommentsThe pool is verycongested duringschool time, withmultiple classes (upto 5) operating at atime.This is causing somelimitations for theschool in terms of thequality of theswimmingprogramme they canoffer their students.The schoolgymnasium is verycongested duringschool time <strong>and</strong> afterhours by classes <strong>and</strong>sports teams training.The one court hasmultiple classesutilising the spaceeach period <strong>and</strong> iscausing somelimitations in terms ofthe quality of theprogrammes they canoffer their students.33


7.2 Pool Facilities7.2.1 Existing School Pools Surrounding <strong>Te</strong> <strong>Puke</strong>School Time to<strong>Te</strong> <strong>Puke</strong>PoolSizeHeating Pool Age Meetschoolneeds?PapamoaPrimaryPongakawaSchoolMaketuSchoolPaengaroaSchool<strong>Te</strong> RangaSchoolFairhaven<strong>Te</strong> <strong>Puke</strong>Primary10 min. 25m x 6lane to1.3mdeep15 min.10 minfrom newPapamoadevelopments10 to 15min25m x 6laneCertifiedto BGradecomps20m x10m x0.9mYes – seasonfrom lateSeptember toend AprilYes – seasonfrom LabourWeekend toafter Easter31 years,butmodernised in 2007No About 20years –expectanother10 to 20years ofuse10 min 13m No 50 to 60years –new poolto be built15 min 12m x4m x0.9mIn <strong>Te</strong><strong>Puke</strong>In <strong>Te</strong><strong>Puke</strong>10m x6m x0.9m15m x7m x0.9mNoYes – useNovember toMarchNo – butcurrentlyinstalling solarheating – willextend usefrom week 3<strong>Te</strong>rm 4 toweek 2 <strong>Te</strong>rm2YesCommunityuseSome sparecapacityduring schoolday for otherschool use.Fullcommunityuse outsideschool hours11 years Yes Yes – keysalesOld, butplanninganupgradeOld, butfibreglassed 8years agoOld, butfibreglassed 2to 3 yearsago –expect afurther 20years useCommentsPool management iscontracted out.Used for cluster <strong>and</strong>regional swimmingsports.Action <strong>Centre</strong> to bebuilt adjacent.Yes Yes Used for districtswimming sportsPartly – newpoolplannedYesPartly –plans for lappoolYr 1 to 4.Yr 5 to 6needdeeper <strong>and</strong>longer poolforenduranceYes – keysalesYes – keysalesNo – did inpast, but notsince newwater quality<strong>and</strong> safetyrequirementsNo – not sincenew waterquality <strong>and</strong>safetyrequirementsSite prepared. TECT<strong>and</strong> local funding readyfor new 20m x 4 or 5lane pool. AwaitingLotteries grant. Plannedas indoor pool, but willbe outdoor initially.Planning to lengthen<strong>and</strong> deepen to 20m x1.5m deep end. Alsoplanning to put insidebuilding.No sourced funding yet.Planning 25m x 3 or 4lane lap pool – moneyalready for filter,pumps etc.Will provide for Yr 5 to6 needs34


7.2.2 Existing Other Pools in Surrounding AreasPoolBayWave -TaurangaBay of PlentyPolytechGreeton Pool -TaurangaMemorial Pool -TaurangaOtumoetai Pool-TaurangaPapamoa PrimarySchool PoolTime to <strong>Te</strong><strong>Puke</strong>Pool Size Heating Meet Community requirements?20 minutes IndoorYes At capacity during peak times.25m lap pool.Leisure pool.Tauranga City Council currentlyLearners pool.undertaking a review of aquatic facilityHydro Slide.provision.30 minutes Outdoor Yes Provides space for water polo teams.35 minutes Indoor Yes Meeting local community needs30 minutes Outdoor No Meeting local community needs35 minutes Indoor25 metre lap pool.Children’s pool15 minutes Outdoor25m lap poolYesNoMeeting local community needsMeeting school, local community learn toswim <strong>and</strong> water polo needs.7.2.3 Planned New Pools in Surrounding AreasPool Time to<strong>Te</strong> <strong>Puke</strong>Paengaroa School 10minutes<strong>Te</strong> Ranga School 15minutesFairhavenPrimary SchoolIn <strong>Te</strong><strong>Puke</strong>Bay Wave 20Expansion minutesPapamoa East 15minutesProposed developmentSite prepared. TECT <strong>and</strong> local funding ready for new 20m x 4 or 5 lane pool.Awaiting Lotteries grant. Planned as indoor pool, but will be outdoor initially.Planning to lengthen <strong>and</strong> deepen to 20m x 1.5m deep end.Also planning to put inside building.No funding sourced yet.Planning 25m x 3 or 4 lane lap pool – money already available for filter, pumps etcWill provide for Yr 5 to 6 needsTauranga City Council currently undertaking a review of aquatic facility provision.Future facility provision in the growth area of Papamoa East will be discussed aspart of the Tauranga City Council review of aquatic facility provision.7.3 Indoor <strong>Recreation</strong> <strong>Centre</strong>s7.3.1 Existing <strong>Te</strong> <strong>Puke</strong> Indoor <strong>Centre</strong>sIndoorrecreation centre<strong>Te</strong> <strong>Puke</strong> SportsClub<strong>Te</strong> <strong>Puke</strong> GymClubTime to <strong>Te</strong><strong>Puke</strong>Number of Courts Community use CommentsIn <strong>Te</strong> <strong>Puke</strong> 1 court <strong>Te</strong> <strong>Puke</strong> Women’s Limited community use <strong>and</strong>Volleyball <strong>Te</strong>am.community focus at thisCommercial miniball <strong>and</strong> stage.volleyball competitionIn <strong>Te</strong> <strong>Puke</strong> Rent large indoor Gym club use only Commercial lease which isspace for theirhard for a non profitpurposesorganisation to meet.35


7.3.2 Existing Other Indoor <strong>Recreation</strong> <strong>Centre</strong>s in Surrounding AreasIndoor recreationcentreAquinas CollegeAction <strong>Centre</strong>Merivale Action<strong>Centre</strong>Mount Action<strong>Centre</strong>Queen ElizabethYouth <strong>Centre</strong>MountMaunganui Sports<strong>Centre</strong>Time to <strong>Te</strong><strong>Puke</strong>Number of Courts community use40 minutes 1 court TA/School facility partnership with agreed communityuse after 3pm30 minutes 1 court TA/School facility partnership with agreed communityuse after 3pm25 minutes 4 courts,Large indoor sports centre which provides for large1 Indoor skating sports leagues to operaterink30 minutes 3 courtsYouth focused centre with ability to operate large1 skating rink events25 minutes 1 court Local 1 court facility for local community7.3.3 Planned New Indoor <strong>Recreation</strong> <strong>Centre</strong>IndoorrecreationcentrePongakawaSchoolTaurangaIndoorSports <strong>and</strong>Exhibition<strong>Centre</strong>PapamoaEast Action<strong>Centre</strong>PapamoaHigh SchoolGoldenS<strong>and</strong>sPrimarySchoolPapamoaTime to <strong>Te</strong> <strong>Puke</strong> Number of Courts Comments15 minutes Planning a 1 basketball courtnew action centreAlready have over $650,000towards it – total build cost of$1.2 millionWill be a good community facility for thelocal community <strong>and</strong> close surroundingareas.15 minutes 9 courts Will be the regional indoor sports facilityfor Bay of Plenty.10 minutes Potential future Action <strong>Centre</strong>identified within the ‘IndoorFacilities Blueprint’ – TaurangaCity Council 2005If developed it could have the potential toimpact on the proposed <strong>Te</strong> <strong>Puke</strong> Indoorrecreation facility.10 minutes Potential for new Courts Has potential to provide community accessfor local community.10 minutes Multipurpose room (hall like). Has potential to provide community accessSuitable for indoor sports – for local community.would fit an undersizedbasketball court or 2badminton courts with a highstud ceiling36


8.0 Benchmark against other Councils8.1 Other CouncilsA review <strong>and</strong> benchmark exercise was undertaken to determine other local council’s aquatic <strong>and</strong> indoorrecreation provision. A wide range of different sized local authorities were reviewed.Key Considerations of the SectionThe review of other local councils has identified that the provision of aquatic <strong>and</strong> indoor recreation facilitiesvaries widely. Facility provision is not based purely on population ratios. There are many factors that caninfluence a local authority to develop often significant sport <strong>and</strong> recreation facilities.These factors include such things as:• Projected population growth (facilities traditionally have a 50 year lifespan)• Travel distance to other similar facilities• Community value• A local authority’s desired outcome• External funding opportunities <strong>and</strong> economic viability.The development of the <strong>Te</strong> <strong>Puke</strong> High School facilities should be assessed on the key factors identified above.Based on the first four bullet points there is a clear demonstrated need to progress the development.The consideration regarding external funding should be the seen as a priority for the project team to progressas the development moves to the next phase. A funding plan <strong>and</strong> developing relationships with the keyexternal funders will be critical to access the potential funding sources that will be available for this project.A review of aquatic <strong>and</strong> indoor recreation provision compared to other local authorities identifies there is awide variety in terms of provision of both facility types, <strong>and</strong> this does not necessarily directly correspond topopulation numbers.Local Council Population Number of <strong>Aquatic</strong> Facilities Number of Indoor <strong>Recreation</strong>FacilitiesWestern Bay of 42,000 1 – Outdoor 25m – Council 1 – one court facilityPlenty District1 – Outdoor 33m – School withCouncil supportRodney District 89, 562 1 - Indoor 25m + learners pool 1 - two court facilityNorth Shore City 205,608 1 - Indoor 33m + learners pool1 - Outdoor 33m + learners pool1- Indoor 50m + learners pool1 - Indoor 25m + learners pool1 - multipurpose indoor concreterink facility1 - one court facility1 - four court multipurpose facility37


Waitakere City 186,444 1 - Indoor 50m + learners pool +fun poolsFranklin District 63,000 1 - Indoor 25m + learners pool1 - Outdoor 50m + learners pool1 - Outdoor 33m + learners poolPapakura District 40,000 1 - Outdoor 50m pool1 - Indoor 25m + fun poolRuapehu District 13,569 3 - Outdoor 25m pools1 - Indoor 25m pool – school pool1 - two court facility1 - six multipurpose court facility2 - one court facility1 - two court facility1 - one multipurpose court facility2 - one court multipurpose facility- schoolsSouth WairarapaDistrict8,892 3 - Outdoor 25m poolsSchool Pools with Council supportStratford District 8,889 1 - Indoor 25m + learners pool 1 - one multipurpose court facilityKaipara District 18,135 1 - Outdoor 50m pool - new 1 - one multipurpose court -community ownedGreymouthDistrictWaimakaririDistrict13,221 1 - Indoor 25m + learners + funpools1 - Outdoor 25m pool ** being upgraded <strong>and</strong> covered toprovide additional two months ofusage42,834 1 - Indoor 25m + learners pool1 - Indoor 25m + learners + funpool1 - Outdoor 25m + learners poolNoneNone38


9.0 Stakeholder Feedback OverviewA series of stakeholder interviews were undertaken as part of the feasibility study. The purpose of theseinterviews was to identify potential needs, issues <strong>and</strong> general considerations in relation to sport <strong>and</strong>recreation within <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> its surrounding areas. Both formal sporting group representatives <strong>and</strong> widercommunity stakeholders were interviewed.The consultation process with key stakeholders has identified strong support for the development of anaquatic <strong>and</strong> indoor recreation facility in <strong>Te</strong> <strong>Puke</strong>. The key points that the consultation process identified were:• The major issue identified by all the stakeholders was the lack of facilities within <strong>Te</strong> <strong>Puke</strong> for the localcommunity. It was identified that a significant proportion of youth from lower socio economichouseholds in <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas do not have the ability, or the funds to travel toTauranga on a regular basis to access sport <strong>and</strong> recreation facilities. An aquatic <strong>and</strong> indoor recreationfacility would provide local youth with opportunities to undertake their sport <strong>and</strong> recreationalpursuits locally. It was perceived this would assist in increasing participation in sports <strong>and</strong> physicalactivity.• The consultation also highlighted that the potential aquatic <strong>and</strong> indoor recreation facility wasperceived as an attraction that would bring people to <strong>Te</strong> <strong>Puke</strong>. This was perceived as a driver whichthe business community could use to move forward.• From the sporting stakeholder perspective it was identified that there was a real lack of lane space forswimming squads <strong>and</strong> water polo space in the Western Bay <strong>and</strong> Tauranga areas. Currently there arewaiting lists to get into swim squads <strong>and</strong> insufficient space for water polo to allow for team growth.As a direct result of this swimming clubs report restricting membership levels, with some having toclose down during winter months due to lack of aquatic space.• The lack of suitable indoor recreation space has also meant that there are no real social or formalindoor sports leagues (of the scale found in other similar communities) for the local <strong>Te</strong> <strong>Puke</strong>community. Currently the majority of people have to travel to Tauranga if they want to participate inthese activities.• The majority of the stakeholders identified that the preferred location for a potential aquatic <strong>and</strong>indoor recreation facility would be adjacent to <strong>Te</strong> <strong>Puke</strong> High School. The main reasons given for thispreference were that it would allow for maximum use of the facility with school use during the day<strong>and</strong> community use after school hours. The small minority of people who were concerned with aschool site perceived that it may lead to the school monopolising the facility use.• The majority of stakeholders also identified that the preferred management option was for anexternal management arrangement. It was thought that the expertise of an experienced organisationwould be required to successfully operate such a facility. It was also perceived that this approachwould prevent the perception that the school was in some way monopolising use.The consultation process has clearly identified strong support for the development of an aquatic <strong>and</strong> indoorrecreation facility. This support by key stakeholders interviewed will be critical as they will be required tobecome key user groups of the facility to enable it long term viability.The detail from the consultation process is outlined further in the section below.39


9.1 Key Sports Clubs FeedbackStakeholder Facilities Utilised Key Issues Discussion Points:<strong>Te</strong> <strong>Puke</strong>Swim ClubWesternBay WaterPolo ClubPapamoaSwim Club<strong>Te</strong> <strong>Puke</strong> HighSchoolPapamoa PrimarySchool<strong>Te</strong> <strong>Puke</strong> HighSchool Pool.Win<strong>Te</strong>ch.BayWave.Papamoa PrimarySchool PoolBayWave.Papamoa PrimarySchool PoolNot enough access to lane space for theswim club.Pool closes during the winter period <strong>and</strong>so the majority of members stopswimming during this time.Their elite members have to travel toBayWave in Tauranga during the wintermonths to continue their training.Membership would grow if they were ableto offer swimming during the wintermonths in an indoor pool.Limited access to pool space to meetdem<strong>and</strong>.Currently limiting the growth of theirmembership as they can’t offer theopportunity due to no increase of accessto pool space.Requirement for new pool in PapamoaEast <strong>and</strong> <strong>Te</strong> <strong>Puke</strong> area.<strong>Te</strong> <strong>Puke</strong> under subscribed in terms ofwater polo membership.<strong>Te</strong> <strong>Puke</strong> pool cannot cater for flipper balldue to deep depth of water.They mainly use the BayWave aquaticfacility in Tauranga for their training.There are approximately 15 membersfrom <strong>Te</strong> <strong>Puke</strong> who utilise the <strong>Te</strong> <strong>Puke</strong> HighSchool pool for training during thesummer months.They currently have access to 8 trainingsessions a week at BayWave, which hascapped the number of members that cantrain.They could increase their trainingmembership if they had more access tolane space. There is currently a waiting listto get onto the training squads.Papamoa Primary school pool has a depthof 0.8m which is too shallow to use fortheir swim squads.The <strong>Te</strong> <strong>Puke</strong> Swim Club identifiedthat they would need office spaceat the new facility to operate theirclub from, as they currently do atthe existing pool site.2m depth required for water polo.1.2m depth required for flipperball.Can you design a pool that catersfor both?Need for storage, clocks etc.Good to have gym component.Small meeting room.Used for training <strong>and</strong> competitionfrom wider Western Bay of Plentyarea.A 25m x 25m pool with a 2m depthwould be ideal.They are looking at other places touse for swim squad training.There is the potential to use a newaquatic facility in <strong>Te</strong> <strong>Puke</strong> forPapamoa Swimming Club training.(However, if a new pool wasdeveloped in the Papamoa/Papamoa East area in the futurethey would prefer to utilise that).Stakeholder Facilities Utilised Key Issues Discussion Points:Sport Bay ofPlentyThere is a significant growth in waterbased sport in the Bay of Plenty, especiallyswimming, water polo <strong>and</strong> surf life saving.They are currently working with the oneindoor court in <strong>Te</strong> <strong>Puke</strong> owned by the <strong>Te</strong><strong>Puke</strong> Sports Club. It is used by the <strong>Te</strong> <strong>Puke</strong>Women’s Indoor Volleyball team <strong>and</strong> by acommercial operator who runs a kiwiIt was Sport Bay of Plenty’s viewthat the work they are doing withthe sporting organisations of <strong>Te</strong><strong>Puke</strong> is strengthening clubs. Thiswork was perceived as helping toposition clubs to be better able torun their own code based ‘leagues’within aquatic <strong>and</strong> recreation40


volleyball <strong>and</strong> miniball league from thevenue.facilities.Volleyball, netball <strong>and</strong> basketballare some of the sports in <strong>Te</strong> <strong>Puke</strong>that Sport BOP are working with toincrease their capability.<strong>Te</strong> <strong>Puke</strong>Gym ClubLeased their ownbuilding sinceJanuary 2009Access for number of hours needed <strong>and</strong>being able to leave equipment out.Struggling to meet lease payments.Have recreational gymnasts,competitive gymnasts, preschoolclasses, plus a home school classduring the week day.Run classes on four days afterschool <strong>and</strong> in the evenings – Monto Wed <strong>and</strong> Fri plus one earlymorning.Looking to exp<strong>and</strong> by offering moreclasses to appeal to Intermediate<strong>and</strong> College ages – starting a new‘<strong>Te</strong>am Gym’ class aimed atgymnastic displays.<strong>Te</strong> <strong>Puke</strong>Athletics<strong>Te</strong> <strong>Puke</strong> HighSchoolDeclining membership.The requirement to change their clubnight has resulted in a decrease inmembers.Lack of quality facilities within <strong>Te</strong><strong>Puke</strong> <strong>and</strong> surrounding areas.PaengaroaAthleticsDeclining membership.Having to travel outside of the district tocompete.Lack of quality facilities within <strong>Te</strong><strong>Puke</strong> <strong>and</strong> surrounding areas.9.2 <strong>Te</strong> <strong>Puke</strong> Community Board FeedbackStakeholder Key Issues Discussion Points:<strong>Te</strong> <strong>Puke</strong>CommunityBoard• There is a significant portion of youth from low socioeconomic households in <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surroundingareas who are wanting after school non-organisedsporting opportunities. These youth do not have theability, nor the funds to travel to Tauranga on aregular basis.• There is a need for an aquatic <strong>and</strong> indoor recreationfacility to accommodate organised sports <strong>and</strong> forthe wider community.• When the school pool has been closed in thesummer months the local rivers have beenincreasingly utilised by the youth. This increases thesafety issues with regards to river swimming <strong>and</strong>diving dangers.• The new facility should at least consider a diving• Whether it would be cost effective todevelop an indoor or outdoor aquaticfacility.• The ongoing operational costs whencomparing an indoor with an outdooraquatic facility was a majorconsideration.• The Community Board membersstated that the pool needed to beoperationally viable <strong>and</strong> sustainable<strong>and</strong> not up to the Council to fund theoperation of the pool.• Parking will be an issue for the schoolsite.41


well <strong>and</strong> board to provide a ‘controlled risk’opportunity for the youth. There are no divingopportunities in the Western Bay of Plenty so itwould be an attraction to have a diving well/boardas part of the development <strong>and</strong> get people comingto <strong>Te</strong> <strong>Puke</strong>.• The aquatic <strong>and</strong> indoor facility would also assist inkeeping people in <strong>Te</strong> <strong>Puke</strong> to undertake theirrecreation activities.• Certain community board members also highlightedtheir underst<strong>and</strong>ing of potential issues of indoorpools (such as excess chlorine exposure).• Community Board representatives also identifiedthat if the school was going to build a new gym thenit would be good to contribute some capital dollarsin order to get greater community access to theindoor space.9.3 <strong>Te</strong> <strong>Puke</strong> CouncillorsStakeholder Key Issues Discussion Points:<strong>Te</strong> <strong>Puke</strong>Councillors• The <strong>Te</strong> <strong>Puke</strong> Councillors stated there was aneed for an aquatic facility in <strong>Te</strong> <strong>Puke</strong>.• The distance to Tauranga <strong>and</strong> to BayWave istoo far for the majority of <strong>Te</strong> <strong>Puke</strong> residents.• The 0 – 5 age group <strong>and</strong> recreational userswere considered just as important as theformal sports groups for the aquatic facility.• They also identified that a pool will help keeppeople in <strong>Te</strong> <strong>Puke</strong>.• The indoor recreation centre was a lesserpriority, however if the <strong>Te</strong> <strong>Puke</strong> High Schoolis to build a new gymnasium then councilwould be happy to contribute to gaincommunity access to it.• The key discussion was based around thecost to develop an indoor aquatic facilityversus an outdoor aquatic facility, <strong>and</strong> theongoing operational costs <strong>and</strong> viability of thefacilities.• Although the indoor pool was the preferredoption the capital <strong>and</strong> operational costsassociated with an indoor pool wereidentified as potential issues.• The increased cost to access an indooraquatic facility, compared to an outdoorfacility, was raised.• It was asked if there is there potential tostage the development by building theoutdoor pool first <strong>and</strong> then covering it inwhen funding became available.• The aquatic facility will need to beoperationally viable <strong>and</strong> not require asignificant annual operational contributionfrom Council to be successful.42


9.4 <strong>Te</strong> <strong>Puke</strong> CommunityStakeholder Facilities Utilised Key Issues<strong>Te</strong> <strong>Puke</strong>Community• BayWave• Swim<strong>Te</strong>ct• Papamoa School Pool• <strong>Te</strong> <strong>Puke</strong> High School Pool• <strong>Te</strong> <strong>Puke</strong> Squash Club• A pool that allowed usage throughout the year,not just during the summer period.• Ideally the facility should not be on school l<strong>and</strong> ifit is a public paid facility. However if it was, thenpublic access to the facilities should be at timesthat work for the public.• Need to have greater community access than iscurrently available at <strong>Te</strong> <strong>Puke</strong> High School.• The community has to travel outside of thedistrict for basic facilities that should be providedfor by the Council.• There are no ‘decent’ indoor sporting facilitieswithin <strong>Te</strong> <strong>Puke</strong>.• Key sports that were identified by the communityfor inclusion in any new facility were: volleyball,squash, badminton, netball, basketball, gym <strong>and</strong>gymnastics.9.5 SchoolsStakeholder Facilities Utilised Key Issues Discussion Points:<strong>Te</strong> <strong>Puke</strong> HighSchoolThe outdoor pool is utilised by thehigh school students:• In terms 1 <strong>and</strong> 4.• Utilised during every periodover the summer months.• Up to 5 classes during a singleperiod.School teams using the poolinclude:• Water polo• Canoe polo• Kayaking• SwimmingThe pool can only beused during terms 1 <strong>and</strong>4 due to it being anoutdoor pool.The pool is verycongested with use overthe summer period, withmultiple classes (up to 5classes) operating at atime in the pool.The high school is utilising thecurrent pool at capacity during thesummer months. This is limiting thequality of the school swimmingprogramme.43


SurroundingPrimarySchool’sUse the <strong>Te</strong> <strong>Puke</strong> High Schooloutdoor pool for:• Sessions prior to swimmingsports.• Senior school swimming sports.• ‘Learn to Swim’ programmes.• Sometimes used for one offbeach safety classes.• Water polo team use.• School swimming teams - interdistricts competitions.Smaller scale pooldevelopment plans inplace.Most primary schools have theirown pools <strong>and</strong> only use <strong>Te</strong> <strong>Puke</strong>High School pool for competitions<strong>and</strong> pre competition training.Several schools are also planningon developing 25m pools with theview to enclose them in the future.All acknowledged there was little inthe way of recreation facilities forchildren <strong>and</strong> teenagers in <strong>Te</strong> <strong>Puke</strong><strong>and</strong> facilities would give themsomewhere to spend their time.Access charges need to be realistic.Need both the aquatic centre <strong>and</strong>recreation centre – ‘will never becheaper than today’ – importantthat ‘we stretch rather than scaleback on what is provided’.9.6 Tauranga City CouncilStakeholder Key Issues Discussion Points:TaurangaCity CouncilStaff• Indoorrecreationplanner.• <strong>Aquatic</strong>facilitiesplanner.• Facilities to meet the needs ofPapamoa East’s future growth.• Have identified the need for alocal action centre to bedeveloped to meet the needs ofthe Papamoa East community.• Are currently undertaking anaquatic facilities review todetermine the long term needsfor aquatic space throughoutTauranga.• Discussion between WBOPDC <strong>and</strong> TCCwill need to be formalised in order toundertake joint network planning foraquatic <strong>and</strong> indoor recreation facilities inthe Papamoa East <strong>and</strong> <strong>Te</strong> <strong>Puke</strong> areas.• This needs to happen to avoid duplicationof facilities.• Potential exists for cross boundary capitalfunding.44


10.0 Needs Analysis SummaryThe previous sections have identified a range of key factors that assist in determining if a proposed sport <strong>and</strong>recreation facility has a demonstrated ‘need’. Determining if the level of need both now <strong>and</strong> into the future issufficient to warrant provision of a particular type <strong>and</strong> scale of facility is essential. This assessment is the firststep prior to deciding to test ‘feasibility’.10.1 Needs AnalysisThe key findings from the previous sections have all indicated that there is a demonstrated need for a newaquatics <strong>and</strong> indoor recreation facility in <strong>Te</strong> <strong>Puke</strong>, in partnership with <strong>Te</strong> <strong>Puke</strong> High School. The key findingsare:1. One of the key factors in determining ‘need’ is the size of the surrounding catchment population. Thedemographic analysis of the <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas has indicated there is a sufficientpopulation to provide a catchment population of 15,714. Add to this the seasonal workers whichprovide an estimated additional 6,400 people to the <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> the surrounding areas for four monthseach year. The <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas base population is also projected to increase to anestimated 20,050 by 2031. Very importantly particularly in relation to the aquatic facility is theprojected growth in Papamoa East (adjacent to <strong>Te</strong> <strong>Puke</strong>). This area of Tauranga District Council isestimated to accommodate up to 30,000 people. All this provides the proposed aquatic <strong>and</strong> indoorrecreational facility a solid existing <strong>and</strong> significant potential population base to draw on. It should alsobe noted that the proposed aquatic <strong>and</strong> indoor recreation facility should be seen as a 50 year asset.2. The existing growth management strategies developed for <strong>Te</strong> <strong>Puke</strong> (which had communityinvolvement) also identified key recreational components that should be considered as part of thearea’s long term future. This research identified the need for a pool complex with integrated aquatic<strong>and</strong> recreational facilities <strong>and</strong> stated that they should be investigated.3. An examination of the existing network of aquatic <strong>and</strong> indoor recreation facilities highlights that <strong>Te</strong><strong>Puke</strong> itself has limited opportunities. The current <strong>Te</strong> <strong>Puke</strong> High School pool is nearing the end of its 50year asset life, as it was opened in 1961. The pool has been experiencing a significant leak since 2009<strong>and</strong> investigations remain ongoing. However, it is clear that the pool is coming to the end of its usefullife. The <strong>Te</strong> <strong>Puke</strong> High School one court gymnasium was developed in the early 1970s <strong>and</strong> it too nolonger meets the need of the student population. Community use in the facility has been restricted asthe dem<strong>and</strong>s of the school have grown.4. Although there are some planned primary school pool developments in the surrounding areas they arevaried in terms of the amount of secured funding they have. However, even with the planned ‘learn toswim’ aquatic facilities at local <strong>and</strong> surrounding primary schools there will still be insufficientrecreational pool space for the wider community, or adequate swim squad <strong>and</strong> water polo water space.Bay Wave in Tauranga is the closest aquatic facility that can provide for the recreational <strong>and</strong> swimsports’ needs of <strong>Te</strong> <strong>Puke</strong> residents, <strong>and</strong> which is open 12 months of the year.5. There is currently no community focused indoor recreation centre in <strong>Te</strong> <strong>Puke</strong>, or surrounding areas,apart from the <strong>Te</strong> <strong>Puke</strong> High School gymnasium <strong>and</strong> the <strong>Te</strong> Sports Club indoor court. The closest otherindoor community recreation centre is the Mount Action <strong>Centre</strong> in Tauranga. However, the newTauranga Indoor Sports <strong>and</strong> Exhibition <strong>Centre</strong> will be closer when it opens in 2011. There is also aplanned one court indoor facility at Pongakawa School which will service the school <strong>and</strong> local area. Thisproject has approximately half of the required funding in place.45


6. The lack of existing or planned indoor recreation space for <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> its surrounding areas doesrepresent a significant gap.7. The consultation process with key stakeholders has identified strong support for the development of anaquatic <strong>and</strong> indoor recreation facility in <strong>Te</strong> <strong>Puke</strong> to fill this gap. All stakeholders perceived <strong>Te</strong> <strong>Puke</strong>lacked community recreation facilities. It was identified that a significant portion of youth from lowersocio economic households do not have the ability, or the funds, to travel to Tauranga on a regularbasis to access sport <strong>and</strong> recreation facilities. It was perceived that an aquatic <strong>and</strong> indoor recreationfacility would provide local youth with opportunities to undertake their sport <strong>and</strong> recreational pursuitslocally.8. From the sporting stakeholder perspective it was identified that there was a real lack of lane space forswimming squads <strong>and</strong> water polo space in the Western Bay <strong>and</strong> Tauranga areas. Currently there arewaiting lists for swimmers to join squads; <strong>and</strong> not enough adequate facilities to cater to the needs ofwater polo.9. The lack of indoor recreation space has meant there are no social or formal sports leagues in the localcommunity. People have to travel to Tauranga if they want to participate.10. The trends in sport section has identified that many of the most popular sport <strong>and</strong> recreation past timesfor New Zeal<strong>and</strong>ers could be provided for by the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreationfacility. For example swimming had the 3rd highest participation levels in the country, equipment basedexercise was ranked 4 th highest <strong>and</strong> basketball was the 17 th most popular participation sport in thecountry.Based on these findings there is a clear need for a facility to deliver aquatic <strong>and</strong> indoor recreationalopportunities to the <strong>Te</strong> <strong>Puke</strong> community <strong>and</strong> surrounding areas.The identified need is for:• An aquatic facility that provides opportunity for:o Learn to swim (year round).o <strong>Recreation</strong>al use.o Structured sport.• Indoor recreation facility that provides for:o Multi court provision.o Dual use between community <strong>and</strong> school.o <strong>Recreation</strong>al use.o Structured sport.o Social league use.46


10.2 Site SelectionDuring the initial stages of the study several potential site options were considered at a high level to determinetheir appropriateness to development the aquatic <strong>and</strong> indoor recreation centre.Of the Council’s reserves in <strong>Te</strong> <strong>Puke</strong>, Centennial <strong>and</strong> the Jamieson Oval/Jubilee Parks do provide the necessaryspace to develop a community aquatic <strong>and</strong> indoor recreation facility. However Centennial Park has becomethe home for junior soccer, tennis, Rangiuru Rugby Club <strong>and</strong> a variety of summer uses i.e. business housecricket, one off community events. Meanwhile Jamieson Oval/Jubilee Park has become the focus for the <strong>Te</strong><strong>Puke</strong> town centre development along with the integration of open space passive uses. The space required todevelop an aquatic <strong>and</strong> indoor recreation centre would take a significant portion of the sites <strong>and</strong> limit theircurrent use.The <strong>Te</strong> <strong>Puke</strong> High School site was considered the most appropriate site to develop the proposed aquatic <strong>and</strong>indoor recreation centre. This site was supported by the high majority of the stakeholders consulted with.47


11.0 Design BriefBased on the outcomes of the ‘needs analysis’ section a design brief which includes potential facility options,has been developed. These options have been designed to meet the identified community need for aquatic<strong>and</strong> indoor recreation space, as well as providing best practise components that will assist with operationalviability long term.The facility options that have been considered are:3. A facility with an indoor aquatic space <strong>and</strong> a two court indoor recreation centreA new pool option will be investigated based on an indoor pool in association with a two court indoorrecreation facility.Capital <strong>and</strong> operational costings will be based on the above facility configuration which will be modelledholistically.4. A facility with an outdoor aquatic facility <strong>and</strong> a two court indoor recreation centreA new pool option will be investigated based on an outdoor pool in association with a two court indoorrecreation facility.Capital <strong>and</strong> operational costings will be based on the above facility configuration which will be modelledholistically.In addition to the main components outlined a series of spaces are included in each option that will increasesport <strong>and</strong> recreational opportunities <strong>and</strong> assist with making the centre more operationally viable. Thesecomponents will be a weights gymnasium, learn to swim pool <strong>and</strong> a multi-purpose function/activity space.11.1 Key ConsiderationsAs part of the development of the design brief some key components have been considered <strong>and</strong> analysed infurther detail. These components will impact on the final capital cost of the facility <strong>and</strong> its functionality. It isimportant to underst<strong>and</strong> the potential issues associated with each component. The particular facilitycomponents considered in further detail are:• Indoor pool vs. outdoor pool.• Depth of the main pool.• Movable pool floor vs. non movable pool floor.• Size of the learners’ pool.The information below identifies the potential pros <strong>and</strong> cons of the facility components. It is not anticipatedthat the final selection of options will be made until the next stage of the project.48


11.1.1 Indoor Pool vs. Outdoor PoolIndoor PoolProsCons12 month operation. Additional capital costs associated with providingindoor pool.Local community do not have to travel toTauranga in winter months to undertakerecreational swimming activity.Additional operational costs such as heating <strong>and</strong>operating an indoor pool facility.Ability to provide increased aquatic recreational<strong>and</strong> sporting opportunities.Increases revenue potential.Ability for schools in surrounding areas to accessaquatic space in winter months.Outdoor PoolProsLower capital cost associated with providingan outdoor pool.Lower operational costs associated with anoutdoor pool facility.ConsOnly four months of operation duringsummer months.Local community will have to travel toTauranga in winter to undertake recreationalswimming activity.Reduced revenue potential.Developing an indoor pool over an outdoor pool does provide many advantages that would benefit communityrecreation <strong>and</strong> sport. However, the major consideration with developing an indoor pool will be the additionalcapital <strong>and</strong> operational costs. The additional community benefit of providing an indoor pool will have to beweighed up against the additional capital cost when making the final design decision. It is likely that apartnership with Tauranga City Council would lend additional weight to an indoor pool.49


11.1.2. Depth of Main Pool vs. Size of Learners PoolTwo Metre Deep Main Pool (with movable pool floor).ProsFlexibility of use - cater to wider spectrum ofcommunity <strong>and</strong> users.Dual use of 2m depth for half the pool <strong>and</strong> raiseddepth up to 0.9m for the other half of the pool.ConsAdditional capital costs associated with providinga movable floor.Additional operational costs such as maintenanceassociated with a movable floor.Ability to structure pool for a variety of differentsports - such as water polo <strong>and</strong> swimming torequired depth (2m).Ability to structure pool for a variety ofrecreational use (with shallow depth of up to0.9m).Increase size <strong>and</strong> depth of learners’ pool with main pool remaining constant 2 metre depth with NOmovable floor.ProsLower capital costs as there will be no movablefloor in the main pool.ConsThe main pool would lack flexibility of use.This will save approximately $650,000.Lower operational costs as there will be nomovable floor in the main pool to maintain.An increased learners’ pool size of 15m x 8mcould provide increased opportunity for learn toswim classes.Some recreational use will be able to beundertaken in the learners’ pool (increased size<strong>and</strong> depth).The main pool would not provide opportunitiesfor recreational, causal or the ‘learn to swim’sectors of the community (as 2 metre depthwould be too deep).Main pool would be used predominately forstructured sport, such as water polo <strong>and</strong>swimming.Reduced recreational space for community use.50


Learners’ pool <strong>and</strong> have main pool at sloping depth of 0.9m to 1.8m.ProsLower capital costs as there will be no movablefloor in the main pool.Lower operational costs as there will be nomovable floor to maintain in the main pool.The main pool would provide opportunities forrecreational, causal, <strong>and</strong> ‘learn to swim’ sectorsof the community (sloping depth).ConsThe main pool would not allow for water polo asthe sport needs a 2m constant depth.Other activities that require deep water space,such as aqua aerobics would be excluded /limited.Would not have the opportunity to host waterpolo events <strong>and</strong> competitions.11.2 SummaryThe final configuration of the aquatic facility will need be negotiated during the following project stages (priorto reaching detailed design). Considerations of weather, a movable floor, <strong>and</strong> or the preferred depth of themain pool will be critical to finalising the design.Irrespective of which option <strong>and</strong> configuration is chosen there will be an impact on the potential user groups<strong>and</strong> the strategic focus of the aquatic space.As an example a two metre only pool will cater strongly for the formal sports sector which is in need of accessto water space of two metres in depth. However, this would impact negatively on the recreational <strong>and</strong> learn toswim sectors as it would make the pool too deep for them to utilise.The most effective scenario from a functionality perspective would be for the final configuration to provideflexible use options (such as with a moveable floor). However, this brings with it significant cost ramifications.It will be vital that the aquatic facility specifications in particular are discussed amongst all the potential projectpartners (including Tauranga City Council as the pool should be seen as part of a regional network).51


12.0 Schedule of SpacesThe findings from the ‘needs’ analysis <strong>and</strong> the design brief sections have been used to develop the followingschedule of spaces.SpaceUse of SpaceSwimming Pool Area• 25m x 20m x 2m pool with adjustable floor.• 5m x 12.5m x 0.9m (average) learner pool.• Seating, open locker/store area <strong>and</strong> casual seating area.• Structured sport.• <strong>Recreation</strong> use.• Learn to swim.• Spectator seating <strong>and</strong> storage.Pool Store Area• Pool Store.• Required pool plant space.• Filtration plant room.• Water heating plant room.Wet Change Rooms• Flexible usage patterns.• Separate Community Changing Rooms.• Separate School Changing Rooms.• Ability to have dual use.• Provides for safety issues relating to student<strong>and</strong> community dual use.Indoor Court Arena• (28m x 14m basketball courts) with 2m sides <strong>and</strong> ends<strong>and</strong> 4m between each court.• Accommodates one full size basket ball <strong>and</strong> net ballcourt.• Courts will allow for flexibility in use.• Potential for dual school <strong>and</strong> community use bydividing the courts.• Ability to operate social leagues moreeffectively with a 2 court layout.• Ability to have two programmes running atonce by dividing the courts.Bleachers• Allows for 450 spectators around one netball size court(30m x 15m).• Spectators for formal <strong>and</strong> informal occasions.• Allows for competitions to be undertaken.Court Storage Area• Storage space for court equipment • Requirements for storage for equipment etc52


SpaceUse of SpaceDry Change Rooms• Separate Community Changing Rooms.• Separate School Changing Rooms.• Flexible usage patterns.• Ability to have dual use.• Provides for safety issues relating to student<strong>and</strong> community dual use.Joint Public Entry for Pool <strong>and</strong> Indoor <strong>Recreation</strong> <strong>Centre</strong>• Reception.• Administration.• Offices.• Public Toilets.• Stairs.• One main reception from where public canaccess both aquatic <strong>and</strong> indoor recreationfacilities.• Shared reception <strong>and</strong> administration services.• Controlled access point for entire facility.• Lift.<strong>Te</strong> <strong>Puke</strong> High School Access Area• High School entry.• High School administration <strong>and</strong> offices.• Separate school entry where students canaccess without congestion <strong>and</strong> conflict withcommunity users.• The school will be using the changing rooms fortheir outdoor field use as well.First Floor• Function/aerobics room.• Kitchen.• Multipurpose space that doubles as a functionspace, as well as floor space for activities, suchas aerobics.First Floor• Weights room • Weights room that will be utilised by bothschool <strong>and</strong> community.53


13.0 High Level Cost Estimates of the Concept PlanThe <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility concept plan has undergone a high level estimate of costs.The estimated costs are indicative only <strong>and</strong> are based on indicative sizes <strong>and</strong> locations of buildings <strong>and</strong> spaces.It is expected that during the detailed design stage a comprehensive analysis will be undertaken to identifymore exact costs.The cost estimates include options for either an indoor pool or an outdoor pool development. The estimateshave also been broken down to identify costs for the pool component <strong>and</strong> the indoor recreation facilitycomponent.13.1 Potential to Reduce CostsThe concept plan includes a series of components that will need to be thoroughly reviewed <strong>and</strong> negotiated bythe partners to determine the level of ‘necessity’ before being included in the facility.There is also the potential that some components may be scaled down in size or excluded from the finaldevelopment once the review is complete. An example of this is the cost of the movable pool floor which isincluded within the costs. The final decision on whether this <strong>and</strong> other items are included or not will all impacton the final cost of the development.13.2 Estimated Cost for ‘Concept Plan’The high level estimated cost for the development of the <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility optionsare:Option 1 - Covered Pool & <strong>Recreation</strong> <strong>Centre</strong>• Covered Pool $ 7,700,000• <strong>Recreation</strong> <strong>Centre</strong> $ 7,300,000• Total $ 15,000,000Option 2 - Uncovered Pool & <strong>Recreation</strong> <strong>Centre</strong>• Uncovered Pool $ 4,200,000• <strong>Recreation</strong> <strong>Centre</strong> $ 7,300,000• Total $ 11,500,000This sum includes the fees <strong>and</strong> a contingency component.The breakdown <strong>and</strong> cost for each component of the concept plan can be reviewed in Appendix 2.54


13.2.1 Estimated Cost InclusionsThe estimate of costs includes two key components within the total cost. These are:• Professional Fees of 15%• Contingency of 10%13.2.2 Estimated Costs ExclusionsThe following items have been excluded from these estimates:• High school boiler installation• Loose furniture, fittings & equipment• Development Contributions• L<strong>and</strong>, Finance & Legal costs• Escalation costs from October 2010• GST.13.3 Funding Splits & Staging OptionsThrough the next phase of the project there may be the potential to spread the costs over several years bystaging the development.Potential staging approaches may include:• Stage 1 – Indoor <strong>Recreation</strong> <strong>Centre</strong> Development• Stage 2 – Pool DevelopmentThere could be potential to develop the pool as an outdoor pool in the first instance <strong>and</strong> cover it at a laterstage when funding allows.However, it should be noted that staging a capital development of this size will impact of the total cost whichwould be likely to increase. The table below outlines the potential issues <strong>and</strong> impacts when staging adevelopment.55


Potential Issues <strong>and</strong> Impacts when Staging a DevelopmentPotential IssuePotential ImpactDisruption of operations duringStage 2 constructionLoss of car parkingConstruction of Stage 2 will likely impact on the usage of Stage 1;consider ability to separate construction zone, maintain access tooperate Stage 1, interruptions from noise & dust nuisance fromconstruction.Construction of Stage 2 will likely take out the car park area as aconstruction access area.If the car park was required to be completed for Stage 1, it is likely tobe damaged by construction access in Stage 2Additional external wallsInflationServices infrastructureEconomies of scale in constructionEconomies of scale in the design<strong>Te</strong>chnological changesLonger construction periodCompletion of Stage 1 will require additional external walls to close inthe building that would not necessarily be required if completed in asingle stage.Delaying Stage 1 will give rise to additional costs associated withinflation.Consider if funding allows for the installation of the servicesinfrastructure for the second stage, otherwise there are likely to beadditional costs associated with upgrading in Stage 2, e.g. the water<strong>and</strong> power supply requirements for the recreation centre will be quitedifferent to that of the pool.Components like the bulk earthworks will be more economical to becarried out all at once rather than in separate stages.Designing building components <strong>and</strong> services to be added to orextended in the future is more expensive than doing it in one stage.There is a possibility that advances in technology between stagescould create difficulties in compatibility.The overall construction period of 2 stages will be longer than onecombined stage, giving rise to longer period of disruption <strong>and</strong>additional costs.56


14.0 Governance <strong>and</strong> Management14.1 IntroductionEffective practice research undertaken both nationally <strong>and</strong> internationally has demonstrated that the truebenefits of any multi sport development cannot be fully unlocked unless the site is well governed <strong>and</strong>managed. The following section outlines a number of governance <strong>and</strong> management options.There are a number of potential governance <strong>and</strong> management models which could be utilised for the <strong>Te</strong> <strong>Puke</strong>development. These are:1. Full Council Ownership Model• Council owns <strong>and</strong> governs the pool <strong>and</strong> Indoor recreation facility.• Council either directly manages the facility or engages external expertise to manage the facility.2. Full School Ownership Model• School owns <strong>and</strong> governs the pool <strong>and</strong> Indoor recreation facility.• School either directly manages the facility or engages external expertise to manage the facility.3. A Holistic Site-Wide Trust Model• A community Trust is formed which owns <strong>and</strong> governs the facility (<strong>and</strong> oversees itsdevelopment).• The Trust either directly manages the facility or engages external expertise to manage the facility.With each of the governance <strong>and</strong> management models there are associated pros <strong>and</strong> cons which have beenhighlighted in the section below.Of the three options it is recommended that ‘OPTON 3 - A Holistic Site-Wide Trust Model’ is considered thepreferred governance model for the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility.The key areas which make this option the preferred governance model at this point in time are:• It will be easier to raise capital funding for the project (<strong>and</strong> there will be a strong requirement forexternal funding to complete the project).• There will be potential for a more balanced stakeholder representation structure.• The flexibility to accommodate additional partners.The overview of each governance <strong>and</strong> management model is outlined in more detail below.57


14.2 High Level Governance & Management Structure OptionsBase Option One: <strong>Te</strong> <strong>Puke</strong> High School Owned <strong>and</strong> OperatedWestern Bay of Plenty DistrictCouncilService LevelAgreement betweenWBPDC <strong>and</strong> TPHS<strong>Te</strong> <strong>Puke</strong> <strong>Recreation</strong> Facility (Swimming Pool & <strong>Recreation</strong> <strong>Centre</strong>)<strong>Te</strong> <strong>Puke</strong> High School owned <strong>and</strong> operatedOption ATPHS delivers facilityaccessOption BManagement Companydelivers facility access <strong>and</strong>programmeesProsVery simple structure.ConsHarder to raise the required capital funding.Management company could run the facility ifdesired.Shared School / Community use.Operational synergies still maintained (depending onquality of agreements).School responsible for the asset (from Councilperspective).Added responsibility for the school.Risk that the facility will be perceived as a school,rather than a community asset.Partnership is less balanced.58


Base Option 2: Western Bay of Plenty Owned <strong>and</strong> Operated<strong>Te</strong> <strong>Puke</strong> High SchoolService LevelAgreement betweenWBPDC <strong>and</strong> TPHSLease with School /MOE & WBPDC<strong>Te</strong> <strong>Puke</strong> <strong>Recreation</strong> Facility (Swimming Pool & <strong>Recreation</strong> <strong>Centre</strong>)WBPDC owned <strong>and</strong> operatedOption AWBPDC delivers facilityaccess <strong>and</strong> communityprogrammesOption BManagement Companydelivers facility access <strong>and</strong>programmesProsVery simple structure.ConsHard to raise the required capital funding.Management company could run the facility ifdesired.Shared School / Community use.Added responsibility for Council.Partnership is less balanced.Operational synergies still maintained (depending onquality of agreements).Council responsible for the asset (from the schoolperspective).59


Base Option 3: Trust Model<strong>Te</strong> <strong>Puke</strong> HighSchoolWestern Bay ofPlenty DistrictCouncilIndependentCommunityRepresentativesPotentialPartners(Yet to beidentified)Service LevelAgreementbetween WBPDC,TPHS & the TrustLease withSchool / MOE &the TrustTwo Representatives Two Representatives Two Representatives Two Representatives<strong>Te</strong> <strong>Puke</strong> <strong>Recreation</strong> Facility Trust (the “Trust”)(Swimming Pool & <strong>Recreation</strong> <strong>Centre</strong>)Management Contractbetween the Trust & amanagement companyManagementCompanyManagement companydelivers facility access<strong>and</strong> communityprogrammesProsEasier to raise the required capital funding.More balanced structure (representative).Shared School / Community use.Operational synergies still maintained (depending onquality of agreements).Management company could run the facility ifdesired.ConsMore complex structure.Added responsibility for the new Trust (trustees).Risk that Trust could become dysfunctional.Takes longer to establish <strong>and</strong> work through all therequired agreements / contracts.Flexibility to accommodate additional partners.Neither School nor Council responsible for the asset(however, both maintain a strong duty of care).60


15.0 Preliminary Operational Costs15.1 Development of Operational CostsThe development of the preliminary operational costs has been based on a series of reviews <strong>and</strong>benchmarking exercises that were undertaken in the North Isl<strong>and</strong>. These included:• Operational costs of facilities of similar size <strong>and</strong> based in areas of similar socio-economic status.• Usage data of facilities of similar size <strong>and</strong> in areas of similar socio-economic status.• Tauranga facilities pricing structures for:- Indoor recreation facilities.- Indoor pools.- Outdoor pools.• <strong>Te</strong> <strong>Puke</strong> High School pool pricing structures.• <strong>Te</strong> <strong>Puke</strong> High School pool usage data.• Discussions with facility managers who operate facilities of similar size15.2 Preliminary Operational BudgetA preliminary operational budget was established which are estimates based on high level assumptions for theinitial business planning purposes of this report.The assumptions are based on facilities of similar size <strong>and</strong> their related costs, fees <strong>and</strong> income levels <strong>and</strong>populations of similar socia-economic status.Further detailed business planning <strong>and</strong> consultation with potential user groups will be required during the nextphase of the facility development to develop a final business plan suitable for the <strong>Te</strong> <strong>Puke</strong> <strong>Aquatic</strong> <strong>and</strong> Indoor<strong>Recreation</strong> facility.The preliminary budget has been developed on the assumption that the aquatic <strong>and</strong> indoor recreationalfacility will be externally managed as one facility (not run by the school or council) under a commercial model.Two preliminary operational budgets have been developed:1 Outdoor Pool <strong>and</strong> 2 Court <strong>Recreation</strong> <strong>Centre</strong> (with gymnasium <strong>and</strong> multi functional room)2 Indoor Pool <strong>and</strong> 2 Court <strong>Recreation</strong> <strong>Centre</strong> (with gymnasium <strong>and</strong> multi functional room)The high level preliminary operational budgets are outlined in the following tables. In developing thepreliminary budgets there were some key assumptions made which are outlined below. A breakdown of theassumptions is found in Appendix 4.61


15.3 Income StreamsThe income streams for the preliminary operational budget have been developed based on the following keyassumptions:1. Programme development <strong>and</strong> delivery will be undertaken by the facility management.2. The ‘medium’ projections for pool, recreation centre, gym <strong>and</strong> function room usage have beenadopted.3. The facility will attract minimum funding grant income.4. The School will provide a subsidy of $50,000 per annum.5. WBPDC Council will provide a subsidy of $60,000 per annum (approximately the same as the existingsubsidy that WBPDC is providing to the School for the current <strong>Te</strong> <strong>Puke</strong> pool).6. The subsidy level from both the School <strong>and</strong> Council will need to be reviewed <strong>and</strong> negotiated so bothpartners are providing an adequate level of operational support in order to make the facilityfinancially viable.15.4 CostsThe costs for the operational plan have been developed based on benchmarking similar size facilities. Some ofthe key points are:15.4.1 Electricity / gas will be a significant cost due to the heating of the indoor pool area.15.4.2 There is the potential to significantly reduce the electricity / gas cost component if the proposedaquatic <strong>and</strong> recreation facility could utilise the <strong>Te</strong> <strong>Puke</strong> High School ‘bore’. There would be anadditional capital cost to utilise the school bore, but the long term operational saving for theproposed facility <strong>and</strong> the School facilities could justify the capital outlay.15.4.3 There are shared costs associated with:• Communications• Security• Bank / finance charges• Insurance (building)• Insurance (content)• Office / cleaning supplies• Professional Fees• Advertising / Marketing15.4.4 A contribution towards the depreciation costs of the building has been included within thepreliminary operational budget.62


15.5 Preliminary Operational Budget Deficit/SurplusThe preliminary operational budgets for both facility options have highlighted an operational deficit ofapproximately $60,000 -$65,000 per annum.This forecast deficit has the potential to be reduced / erased, depending on a number of factors which include:• Increased programme development <strong>and</strong> delivery.• Decreasing the electricity/gas costs.• Increasing partner subsidy levels.The next phase of the project would include a detailed business model <strong>and</strong> plan. Partners’ negotiations wouldalso be undertaken to determine charging levels, programme development <strong>and</strong> management issues.63


Indoor Pool <strong>and</strong> Rec <strong>Centre</strong> - Projection Cashflow ModelRef Section Year 1%Growth Year 2%Growth Year 3%Growth Year 4%Growth Year 51.1 Hall $30,000 2.0% $30,600 3.0% $31,518 3.0% $32,464 2.0% $33,1131.2 Gym $90,000 2.0% $91,800 3.0% $94,554 3.0% $97,391 2.0% $99,3381.3 Aerobic Studio $10,000 2.0% $10,200 3.0% $10,506 3.0% $10,821 2.0% $11,0381.4 Function Room $10,000 2.0% $10,200 3.0% $10,506 3.0% $10,821 2.0% $11,0381.5 Casual Swimming $198,640 2.0% $202,613 3.0% $208,691 3.0% $214,952 2.0% $219,2511.6 Clubs $11,700 2.0% $11,934 3.0% $12,292 3.0% $12,661 2.0% $12,9141.7 Swimmig Lessons $48,000 2.0% $48,960 3.0% $50,429 3.0% $51,942 2.0% $52,9801.8 School use contribution $50,000 0.0% $50,000 0.0% $50,000 0.0% $50,000 0.0% $50,0001.9 Council grant $60,000 0.0% $60,000 0.0% $60,000 0.0% $60,000 0.0% $60,0001.10 Grant funding $10,000 0.0% $10,000 0.0% $10,000 0.0% $10,000 0.0% $10,0001 TOTAL INCOME $518,340 $526,307 $538,496 $551,051 $559,6722.1 Staffing $322,477 1.0% $325,701 1.0% $328,958 1.0% $332,248 1.0% $335,5702.2 Swim Instructors $8,120 1.0% $8,201 1.0% $8,283 1.0% $8,366 1.0% $8,4502 STAFF COSTS $330,597 $333,903 $337,242 $340,614 $344,0203.1 Electricty / gas $110,000 2.0% $112,200 2.0% $114,444 2.0% $116,733 2.0% $119,0683.2 Minor Maintenance $10,000 2.0% $10,200 2.0% $10,404 2.0% $10,612 2.0% $10,8243.3 Communications $5,000 2.0% $5,100 2.0% $5,202 2.0% $5,306 2.0% $5,4123.4 Security $3,000 0.0% $3,000 2.0% $3,060 2.0% $3,121 2.0% $3,1843.5 Bank / finance charges $2,000 0.0% $2,000 0.0% $2,000 0.0% $2,000 0.0% $2,0003.6 Misc costs $5,000 0.0% $5,000 0.0% $5,000 0.0% $5,000 0.0% $5,0003 SERVICES $135,000 $137,500 $140,110 $142,772 $145,4884.1 Insurance (building) $20,000 2.0% $20,400 2.0% $20,808 2.0% $21,224 2.0% $21,6494.2 Insurance (content) $5,000 2.0% $5,100 2.0% $5,202 2.0% $5,306 2.0% $5,4124.3 Rates / water / rubbish $13,000 2.0% $13,260 2.0% $13,525 2.0% $13,796 2.0% $14,0724.4 Accounting / Legal $5,000 0.0% $5,000 0.0% $5,000 0.0% $5,000 0.0% $5,0004 STATUATORY $43,000 $43,760 $44,535 $45,326 $46,1325.1 Office / cleaning supplies $4,000 0.0% $4,000 0.0% $4,000 0.0% $4,000 0.0% $4,0005.2 Pool Supplies $30,000 0.0% $30,000 0.0% $30,000 0.0% $30,000 0.0% $30,0005 SUPPLIES $34,000 $34,000 $34,000 $34,000 $34,0006.1 Advertising / Marketing $3,000 0.0% $3,000 0.0% $3,000 0.0% $3,000 0.0% $3,0006.2 Professional Fees $3,000 0.0% $3,000 0.0% $3,000 0.0% $3,000 0.0% $3,0006 ADVERTISING & MARKETING $6,000 $6,000 $6,000 $6,000 $6,0007.1 Depreciation (Building) $35,000 0.0% $35,000 0.0% $35,000 0.0% $35,000 0.0% $35,0007 DEPRECIATION $35,000 $35,000 $35,000 $35,000 $35,0008 TOTAL EXPENSES $583,597 $590,163 $596,887 $603,712 $610,640Net Operating Surplus -$65,257 -$63,856 -$58,391 -$52,661 -$50,968% -12.6% -12.1% -10.8% -9.6% -9.1%Cashflow -$65,257 -$63,856 -$58,391 -$52,661 -$50,968Cumulative Cashflow -$65,257 -$129,112 -$187,503 -$240,164 -$291,133Note: Preliminary Assessments - The above information are estimates based on high level assumptions for the initial businessplanning purposes of this report only.64


Outdoor Pool <strong>and</strong> Rec <strong>Centre</strong> -Projection Cashflow ModelRef Section Year 1 % Growth Year 2%Growth Year 3%Growth Year 4%Growth Year 51.1 Hall $30,000 2.0% $30,600 3.0% $31,518 3.0% $32,464 2.0% $33,1131.2 Gym $90,000 2.0% $91,800 3.0% $94,554 3.0% $97,391 2.0% $99,3381.3 Aerobic Studio $10,000 2.0% $10,200 3.0% $10,506 3.0% $10,821 2.0% $11,0381.4 Function Room $10,000 2.0% $10,200 3.0% $10,506 3.0% $10,821 2.0% $11,0381.5 Casual Swimming $44,800 2.0% $45,696 3.0% $47,067 3.0% $48,479 2.0% $49,4481.6 Clubs $3,600 2.0% $3,672 3.0% $3,782 3.0% $3,896 2.0% $3,9741.7 Swimming Lessons $19,200 2.0% $19,584 3.0% $20,172 3.0% $20,777 2.0% $21,1921.8 School use contribution $50,000 0.0% $50,000 0.0% $50,000 0.0% $50,000 0.0% $50,0001.9 Council grant $60,000 0.0% $60,000 0.0% $60,000 0.0% $60,000 0.0% $60,0001.10 Grant funding $10,000 0.0% $10,000 0.0% $10,000 0.0% $10,000 0.0% $10,0001 TOTAL INCOME $327,600 $331,752 $338,105 $344,648 $349,1412.1 Staffing $210,127 0.0% $210,127 1.0% $212,228 1.0% $214,350 1.0% $216,4942.2 Swim Instructors $3,248 0.0% $3,248 1.0% $3,280 1.0% $3,313 1.0% $3,3462 STAFF COSTS $213,375 $213,375 $215,508 $217,663 $219,8403.1 Electricty / gas $40,000 2.0% $40,800 2.0% $41,616 2.0% $42,448 2.0% $43,2973.2 Minor Maintenance $10,000 2.0% $10,200 2.0% $10,404 2.0% $10,612 2.0% $10,8243.3 Communications $5,000 2.0% $5,100 2.0% $5,202 2.0% $5,306 2.0% $5,4123.4 Security $3,000 0.0% $3,000 2.0% $3,060 2.0% $3,121 2.0% $3,1843.5 Bank / finance charges $2,000 0.0% $2,000 0.0% $2,000 0.0% $2,000 0.0% $2,0003.6 Misc costs $5,000 0.0% $5,000 0.0% $5,000 0.0% $5,000 0.0% $5,0003 SERVICES $65,000 $66,100 $67,282 $68,488 $69,7174.1 Insurance (building) $15,000 2.0% $15,300 2.0% $15,606 2.0% $15,918 2.0% $16,2364.2 Insurance (content) $5,000 2.0% $5,100 2.0% $5,202 2.0% $5,306 2.0% $5,4124.3 Rates / water / rubbish $10,000 2.0% $10,200 2.0% $10,404 2.0% $10,612 2.0% $10,8244.4 Accounting / Legal $5,000 0.0% $5,000 0.0% $5,000 0.0% $5,000 0.0% $5,0004 STATUATORY $35,000 $35,600 $36,212 $36,836 $37,4735.1 Office / cleaning supplies $4,000 0.0% $4,000 0.0% $4,000 0.0% $4,000 0.0% $4,0005.2 Pool Supplies $30,000 0.0% $30,000 0.0% $30,000 0.0% $30,000 0.0% $30,0005 SUPPLIES $34,000 $34,000 $34,000 $34,000 $34,0006.1 Advertising / Marketing $3,000 0.0% $3,000 0.0% $3,000 0.0% $3,000 0.0% $3,0006.2 Professional Fees $3,000 0.0% $3,000 0.0% $3,000 0.0% $3,000 0.0% $3,0006 ADVERTISING & MARKETING $6,000 $6,000 $6,000 $6,000 $6,0007.1 Depreciation (Building) $35,000 0.0% $35,000 0.0% $35,000 0.0% $35,000 0.0% $35,0007 DEPRECIATION $35,000 $35,000 $35,000 $35,000 $35,0008 TOTAL EXPENSES $388,375 $390,075 $394,002 $397,987 $402,030Net Operating Surplus -$60,775 -$58,323 -$55,898 -$53,340 -$52,890% -18.6% -17.6% -16.5% -15.5% -15.1%Cashflow -$60,775 -$58,323 -$55,898 -$53,340 -$52,890Cumulative Cashflow -$60,775 -$119,097 -$174,995 -$228,335 -$281,224Note: Preliminary Assessments - The above information are estimates based on high level assumptions for the initialbusiness planning purposes of this report only.65


16.0 FundingThe final capital costs associated with the proposed <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility will dependon the final detail design <strong>and</strong> the facility components associated with this. The final key decisions on whetherthe pool is an indoor or outdoor pool, has a movable pool floor or not will all impact on the final cost of thefacility development.Key Considerations of the SectionThe estimated capital costs that have been identified for the potential options will be significant <strong>and</strong> a fundingplan will need to be developed <strong>and</strong> implemented if the required funds are to be raised.There will be some crucial funding organisations that will need to be engaged with early on in the planningprocess. The funding organisations are:• The Western Bay of Plenty District Council has provided seed funding of $450,000 towardspreliminary planning <strong>and</strong> capital development costs for the proposed development. It remainsunlikely that the aquatic facility or a larger two court recreation centre would be viable withoutadditional capital support from Council. Discussions with Council will be required to determine whatlevel of funding may be possible.• Another important potential funder if the project is to be successful could be the Tauranga CityCouncil. Discussions with the Council should be opened as soon as possible. It is likely that the Councilwould be most interested in the aquatic component of the project. Their support is likely to be heavilylinked to strategic planning associated with the growth of Papamoa East.• Another key funding organisation will be the Ministry of Education, which under current guidelinesallows for <strong>Te</strong> <strong>Puke</strong> High School to develop a new gymnasium space after 2012 (equivalent to 1.6basketball courts). The funding from the MoE should provide a solid start to raising the required fundsfor the indoor recreation centre component of the proposed development.• A potential key major funding organisation within the Western Bay of Plenty will be the TECT fundingtrust. They have contributed significant amounts to key sport <strong>and</strong> recreation facility projects in theWestern Bay of Plenty in recent years. It will be critical to demonstrate the role that the proposed <strong>Te</strong><strong>Puke</strong> aquatic <strong>and</strong> indoor recreation facility will play strategically in future discussions with TECT.• Other traditional funding organisations such as ‘NZ Lottery Grants’ <strong>and</strong> ‘NZCT’ will also be importantpotential funding streams to consider.Undertaking discussions with potential key funding organisations is a priority. It is important to underst<strong>and</strong> thepotential funding that the project could realistically attract <strong>and</strong> within what time frames. The level of fundingwill be dependent on the role the facility is perceived to play. For example, an indoor pool could be seen aspart of a regional network, servicing the south of the region while ‘Bay Wave’ services the north.66


16.1 Historical Funding GrantsThe table below identifies the potential funding partners <strong>and</strong> their associated funding levels whichhave been granted historically.FundingOrganisationTECTPriority of Funding OrganisationMajor Amenities - $2,000,000 Annually• The emphasis of this Fund is to supportMajor Amenities that benefit the wholeTECT area, or a significant part of it.Community Amenities - $1,500,000 Annually• Funding within this category is tocontribute to Community Amenitieswithin the TECT District. An amenity mustbe of significant benefit to the communitywith funding directed towards apermanent new amenity or a significantupgrade of an existing amenity.Potential FundingExamples of past funding• $6m contribution to the TaurangaIndoor Sports <strong>and</strong> Exhibition<strong>Centre</strong>• $4 million contribution to‘BayWave’• $2.5 million contribution for thepurchase <strong>and</strong> development of theTECT All <strong>Te</strong>rrain Park in 2004. Afurther $1 million was approved in2007 towards the development ofan underpass to allow safe accessfrom the highway to both sides ofthe park.Examples of past funding• $225,000 helped to progress themuch anticipated Merivale Action<strong>Centre</strong> which is situated on theSchool’s grounds• $200,000 contribution to OmanuBeach Surf Lifesaving Club forupgrade of the club house• $250,000 contribution towards <strong>Te</strong><strong>Puke</strong> <strong>Te</strong>nnis Club court resurfaceCommunity Special Projects - $1,000,000Annually• Priority is given to applications that showlocal initiative <strong>and</strong> where the Grant willbenefit a significant part of ourCommunityNZ Lottery Grants • The New Zeal<strong>and</strong> Lottery Grants Boardwas set up by Parliament to benefit thecommunity by distributing the profitsfrom the games run by NZ Lotteries.• The support arts, cultural, sporting <strong>and</strong>community groups.• The Lottery Community Facilities Fund isfor projects to build or improvecommunity facilities that supportparticipation in community activities <strong>and</strong>Examples of past funding• Tauranga Volunteer Coastguard -grant of $250,000 towards a newrescue vessel.• Examples of past funding• Netball Waitakere Inc $750,000towards covering of four netballcourts <strong>and</strong> club room facilities• Waimakariri Covered PoolCommittee Inc $450,000• Mount Hutt Memorial Hall wasgranted $500,000 to refurbish thehall so it can provide the 49 user67


NZCTsocial interaction, to foster cohesion <strong>and</strong>strengthen communities.The Fund’s main emphasis is support forfacilities open to use by the widercommunity or that can be used for arange of services <strong>and</strong> activities.The primary focus of the NZCT is to fundsport, with 80% of the funding going towardsamateur sport. However other areas, such asrescue <strong>and</strong> life savings services, education,health, arts <strong>and</strong> culture are also funded.NZCT’s main criteria for approval of sportinggrants are:• Is the item funded necessary to playthe sport?• Will the funding help achieve greaterparticipation in, <strong>and</strong> thedevelopment of, the sportBay Trust Bay Trust will consider grants fororganisations <strong>and</strong> projects which significantlyhelp build, strengthen or enhance Bay ofPlenty Communities. Projects <strong>and</strong>organisations should help achieve the Trust'sStrategic Outcome areas, as identified in theTrust's Strategic Plan 2010 - 2013.groups a quality facility.The main emphasis of the NZCT isbased around operational costs, withfunding going towards componentssuch as salaries, uniforms <strong>and</strong> the like.However they do in some instancescontribute towards sport <strong>and</strong>recreation facility developments thatplay a significant role within an area.Examples of past funding• $75,000 towards Otumoetai Sports<strong>and</strong> <strong>Recreation</strong> Club Upgrade• $65,000 towards pool constructioncost at Paengaroa Primary School<strong>Te</strong> <strong>Puke</strong> HighSchoolMinistry ofEducationWBOPDCThese are:• Active Communities• Healthy Communities• Education• Cultural Heritage• Community Economic Development<strong>Te</strong> <strong>Puke</strong> High School, through the MoE grantfor 1.6 court space, will provide fundingtowards the project.Ministry of Education under currentguidelines will provide funding for <strong>Te</strong> <strong>Puke</strong>High School to develop a new gymnasiumspace after 2012, equivalent to 1.6 basket ballcourts.The Western Bay of Plenty District Council hasprovided seed funding towards the proposeddevelopment. However, now the scale of thepotential development is clearer additionaldiscussion will be required regarding funding.The MoE will commit an agreedamount based on their formulatowards the indoor recreation facility.The Western Bay of Plenty DistrictCouncil have approved with their LTCCP$450,000 towards the <strong>Te</strong> <strong>Puke</strong> <strong>Aquatic</strong><strong>and</strong> Indoor <strong>Recreation</strong> <strong>Centre</strong>.68


16.2 Potential Funding SplitsThe funding split percentages for potential funding partners outlined below are indicative only <strong>and</strong> are basedon a range of historic New Zeal<strong>and</strong> capital development partnership projects such as AMI Sports <strong>and</strong> Fitness<strong>Centre</strong>, Tamaki College <strong>Recreation</strong> <strong>Centre</strong>, Aquinas Community Action <strong>Centre</strong> <strong>and</strong> Mt Albert <strong>Aquatic</strong> <strong>Centre</strong>. Itshould be noted that the capital budgets of these projects are below $15 million.Potential Funding SplitsFunding SourceEstimated Contribution Range*Councils 30% - 60%Ministry of Education (New gymnasium guidelines) 20% - 50%<strong>Te</strong> <strong>Puke</strong> High School 10% - 50%Charitable Trusts (TECT, Bay Trust, NZCT etc) 10% - 50%New Zeal<strong>and</strong> Lottery Grants Board 5% - 20%Business Support 5% - 10%Key Note: It is essential that ongoing discussions <strong>and</strong> joint planning is undertaken with Tauranga City Council.The future growth in <strong>Te</strong> <strong>Puke</strong>’s adjoining area of Papamoa East will see that population increase to 30,000 inthe future. The planning for social infrastructure for the Papamoa East area is the responsibility of TaurangaCity Council, but has not been undertaken in any detail as yet. There is definite potential for the proposed <strong>Te</strong><strong>Puke</strong> aquatic <strong>and</strong> indoor recreation centre to also serve the growing population for Papamoa East particularlyin regards to aquatic facilities.69


17.0 ConclusionsSufficient need has been identified to warrant the development the <strong>Te</strong> <strong>Puke</strong> High School Community <strong>Aquatic</strong><strong>and</strong> Indoor <strong>Recreation</strong> facility.The analysis indicates that the growing catchment population for <strong>Te</strong> <strong>Puke</strong> <strong>and</strong> surrounding areas which isestimated to reach approximately 20,000 by 2031 <strong>and</strong> their current limited access to indoor sport <strong>and</strong> aquaticfacilities support the need for the development. The planned growth of Papamoa East will also have asignificant influence on the project.The study has identified two options for the development <strong>and</strong> operation of the proposed facility which havebeen considered. These are:1. A facility with an indoor aquatic space <strong>and</strong> a two court indoor recreation centre2. A facility with an outdoor aquatic facility <strong>and</strong> a two court indoor recreation centreBoth options include a series of components within the facility that will need to be thoroughly reviewed <strong>and</strong>negotiated by the partners to determine their level of ‘necessity’ before being included in the final facility.There is also the potential that some components may be scaled down in size, or excluded from the finaldevelopment, once the review is complete. The final decision on whether specific items are included or notwill all impact on the final cost <strong>and</strong> eventual feasibility of the development.18.0 Recommendations1. It is recommended that the key next step in the process be to develop <strong>and</strong> sign a MOU between the<strong>Te</strong> <strong>Puke</strong> High School <strong>and</strong> the Western Bay of Plenty District Council to outline the potentialrelationship <strong>and</strong> outcomes for the proposed aquatic <strong>and</strong> indoor recreation facility.2. A council / school project team should be formed to lead the development of the <strong>Te</strong> <strong>Puke</strong> aquatic <strong>and</strong>indoor recreation facility proposal <strong>and</strong> direct the negotiation <strong>and</strong> funding processes. <strong>Te</strong>rms ofReference for this project team should be developed.3. Joint planning is undertaken between the Western Bay of Plenty District Council <strong>and</strong> Tauranga CityCouncil to explore potential partnership opportunities in regards to the <strong>Te</strong> <strong>Puke</strong> pool <strong>and</strong> recreationcentre proposal <strong>and</strong> avoid future facility duplication.4. A funding plan is established as a priority that proactively engages with the potential key fundingorganisations / partners.5. The project team engage with the Ministry of Education as a key partner in the development of theproposed community facility on Ministry of Education l<strong>and</strong>.70


Appendix 1 – Concept Plan


Appendix 2 – Estimate of Costs Breakdown


Preliminary Budget EstimateFor<strong>Te</strong> <strong>Puke</strong> Pool & <strong>Recreation</strong> <strong>Centre</strong>1 October 2010


<strong>Te</strong> <strong>Puke</strong> Pool & <strong>Recreation</strong> <strong>Centre</strong>Order of Cost Estimate - October 2010Clarifications & ExclusionsGeneralThese estimates have been based on the assumptions stated in the estimateClarificationsEstimates are based on the following :PENZ concept sketches dated 22 September 2010PENZ schedule of spaces dated 22 September 2010Assumes adequate services infrastructure at boundary of sitecirculation areas allowed for within schedule of spaces areasEstimates assume a traditional procurement processEstimates are based on current day pricing <strong>and</strong> escalation costs should be allowed for separatelyProvisional Allowances have been made where noted for items where scopes have been assumed.ExclusionsThe following are excluded from these estimates:High school boiler installationLoose furniture, fittings & equipmentDevelopment ContributionsL<strong>and</strong>, Finance & Legal costsEscalation costs from October 2010GSTOptions SummaryOption 1; Covered Pool & <strong>Recreation</strong> <strong>Centre</strong>Covered Pool $ 7,700,000<strong>Recreation</strong> <strong>Centre</strong> $ 7,300,000$ 15,000,000Option 2; Uncovered Pool & <strong>Recreation</strong> <strong>Centre</strong>Uncovered Pool $ 4,200,000<strong>Recreation</strong> <strong>Centre</strong> $$7,300,00011,500,000


<strong>Te</strong> <strong>Puke</strong> Pool & <strong>Recreation</strong> <strong>Centre</strong>Order of Cost Estimate - October 2010Option 1; Covered pool & 2 court arenaDemolition <strong>and</strong> site clearance $ 100,000Bulk excavation 2,500 m3 55 $ 137,500Main Pool & plant Sum $ 1,250,000Learner pool & plant Sum $ 160,000Pool hall 1,350 m2 2,000 $ 2,700,000Pool store 150 m2 2,000 $ 300,000Wet Change rooms 210 m2 3,500 $ 735,000Court Arena (x2 courts) 1,152 m2 1,600 $ 1,843,200Bleacher store 75 m2 1,600 $ 120,000Store 160 m2 1,600 $ 256,000Dry change 210 m2 2,100 $ 441,000Public Entry Reception 100 m2 2,100 $ 210,000Public Admin Offices 35 m2 2,100 $ 73,500High School Entry Reception 90 m2 2,100 $189,000High School Admin Offices 35 m2 2,100 $ 73,5001st Floor Function/Aerobics Room 270 m2 2,100 $ 567,000Weights room 170 m2 2,100 $ 357,000Kitchen 42 m2 4,000 $ 168,000Public Toilets 30 m2 3,500 $ 105,000Stairs 180 m2 2,100 $ 378,000Lift 10 m2 2,100 $ 21,000General plant room 25 m2 1,300 $ 32,500Truck Dock 25 m2 1,300 $ 32,500Rubbish enclosure 25 m2 1,300 $ 32,500High School boiler & store 160 m2 1,300 $ 208,000Air h<strong>and</strong>ling plant room 60 m2 1,300 $ 78,000Water heating plant room 60 m2 1,300 $ 78,000Filtration plant room 130 m2 1,300 $ 169,000Gross Floor Area 4,754 m2Adjustable pool floor (half pool area) Item $ 800,000Allow to regrade existing carpark to form access Sum $ 75,000Allowance for hard & soft l<strong>and</strong>scaping Sum $ 130,000Sub Total $ 11,820,200Professional Fees 15% $ 1,773,030Contingency 10% $ 1,359,323$ 14,952,553Total Estimate for Option 1 Say $ 15,000,000M:\P1773 - <strong>Te</strong> <strong>Puke</strong> Pool & Rec <strong>Centre</strong>\<strong>Te</strong> <strong>Puke</strong> Pool & Rec <strong>Centre</strong> estimate 011010


<strong>Te</strong> <strong>Puke</strong> Pool & <strong>Recreation</strong> <strong>Centre</strong>Order of Cost Estimate - October 2010Option 2; Uncovered pool & 2 court arenaDemolition <strong>and</strong> site clearance $ 100,000Bulk excavation 2,500 m3 55 $ 137,500Uncovered Main pool & plant Sum $ 1,250,000Uncovered Learner pool & plant Sum $ 160,000Pool store 150 m2 2,000 $ 300,000Wet Change rooms 210 m2 3,500 $ 735,000Court Arena (x2 courts) 1,152 m2 1,600 $ 1,843,200Bleacher store 75 m2 1,600 $ 120,000Store 160 m2 1,600 $ 256,000Dry change 210 m2 2,100 $ 441,000Public Entry Reception 100 m2 2,100 $ 210,000Public Admin Offices 35 m2 2,100 $ 73,500High School Entry Reception 90 m2 2,100 $189,000High School Admin Offices 35 m2 2,100 $ 73,5001st Floor Function/Aerobics Room 270 m2 2,100 $ 567,000Weights room 170 m2 2,100 $ 357,000Kitchen 42 m2 4,000 $ 168,000Public Toilets 30 m2 3,500 $ 105,000Stairs 180 m2 2,100 $ 378,000Lift 10 m2 2,100 $ 21,000General plant room 25 m2 1,300 $ 32,500Truck Dock 25 m2 1,300 $ 32,500Rubbish enclosure 25 m2 1,300 $ 32,500High School boiler & store 160 m2 1,300 $ 208,000Air h<strong>and</strong>ling plant room 60 m2 1,300 $ 78,000Water heating plant room 60 m2 1,300 $ 78,000Filtration plant room 130 m2 1,300 $ 169,000Gross Floor Area 3,404 m2Adjustable pool floor (half pool area) Item $ 800,000Allow to regrade existing carpark to form access Sum $ 75,000Allowance for hard & soft l<strong>and</strong>scaping Sum $ 130,000Sub Total $ 9,120,200Professional Fees 15% $ 1,368,030Contingency 10% $ 1,048,823$ 11,537,053Total Estimate for Option 2 Say $ 11,500,000M:\P1773 - <strong>Te</strong> <strong>Puke</strong> Pool & Rec <strong>Centre</strong>\<strong>Te</strong> <strong>Puke</strong> Pool & Rec <strong>Centre</strong> estimate 011010


Appendix 3 Key Questions Relating to the Proposed Facility DevelopmentsIt is considered likely that the following two key questions may be raised by stakeholders as the projectcontinues into its next phase.Question 1:Can the proposed facility be developed more cheaply?Yes – the proposed facility could be developed more cheaply than the high level costs identified within thereport. However, it should be noted that with the reductions in the overall capital costs will come potentialimplications that should be considered.One way in which costs could be reduced is to reduce the components that are retained within the facility (ashas been identified within the report). Key components such as NOT having the movable floor would save onthe capital costs. However, the impact would be a reduced service level to the community. Without a movablefloor the pool could not accommodate BOTH recreational <strong>and</strong> learn to swim activities, <strong>and</strong> deep water aquaticopportunities like water polo.Other areas in which you could reduce costs could be to not develop the proposed fitness gym ormultipurpose meeting space. This could reduce the size of the building <strong>and</strong> reduce the capital costs.However, this would have a negative impact on the operational aspect of the proposed facility. Taking out keyareas such as the fitness gym or multipurpose meeting space would reduce the potential income streamswhich could then require a potentially greater subsidy from the partners. This would also reduce theopportunity for the community to access a range of local recreation opportunitiesThe proposed facility development could also reduce the capital costs by reducing the quality of material used.The current estimate of costs has been based on a ‘medium cost’ specification of material for the building. Theproposed facility could be developed using a lower specification of materials which could reduce the capitalcosts.However, previous experience has shown that the use of low cost (<strong>and</strong> quality) specification of materials haslead to an increase in maintenance <strong>and</strong> replacement costs <strong>and</strong> as a result increased the ongoing operationalcosts of facilities.Another alternative would be to develop only one component of the facility such as an indoor or outdoor pool<strong>and</strong> then develop a simpler School gymnasium which would meet the needs of the school predominantly. Thetrade off is that this would reduce or exclude wider community use for much of the time.Question 2:Can the proposed facility be developed by Loan Funding?Yes – the proposed facility could be developed with assistance from loan funding. However, it should be notedthat the ability for the facility to repay the loan would be an issue that would need to be examined in moredetail.Most facilities of this nature require an annual financial operational subsidy to be viable. Therefore it wouldbe likely that there would be no additional financial surplus to assist in paying the loan component. Anincrease in an operational subsidy could be required to meet the loan funding.A loan funding model could also take away from the ability to reinvest in the facility in terms of capitalimprovements <strong>and</strong> programmes; since the focus would be on repaying the loan amount.


Appendix 4 - Preliminary Operational Plans AssumptionsThe information below are estimates based on high level assumptions for purposes of the initial business planning.The assumptions are based on facilities of similar size <strong>and</strong> their related costs, fees <strong>and</strong> income levels (where possible facilities with like populations / similar socio-economicstatus were selected). Where possible estimates have been benchmarked against three or more facilities. Estimates have also been reviewed against the experiences ofexisting facility managers <strong>and</strong> management companies.Further detailed business planning <strong>and</strong> consultation with potential user groups will be required during the next phase of the facility development to establish a finalbusiness plan suitable for the <strong>Te</strong> <strong>Puke</strong> <strong>Aquatic</strong> <strong>and</strong> Indoor <strong>Recreation</strong> facility.Key Assumptions for Outdoor Pool <strong>and</strong> Indoor Courts:Indoor Hall IncomeUsers Number per week Fees Income NotesHall 50 $12.00 $30,000.00 Includes, sports leagues, clubs <strong>and</strong> casual usersGym - membership 300 $25.00 $90,000.00 $25 per monthFunction Room 10 $20.00 $10,000.00Aerobic Room 10 $2.50 $10,000.00 10 classes per week, for 40 weeks a year with 10 peopleTotal $140,000.00Outdoor Pool IncomeUsers Number per week Fees Income NotesCasual - Adult 250 $6.80 $27,200.00 8,000 visits per annumCasual - child 250 $4.40 $17,600.00 8,000 visits per annumClubs 9 $25.00 $3,600.00Swim Lessons 20 $10.00 $19,200.00 10 lessons a week, 6 people per lesson, 16 weeks a yearTotal $67,600.00Operational SupportOrganisation Income NotesWBOPDC Ops Grant $60,000.00School contribution $50,000.00General grants $10,000.00Total $120,000.00


Key Assumptions for Indoor Pool <strong>and</strong> Indoor Courts:Indoor Hall IncomeUsers Number per week Fees Income NotesHall 50 $12.00 $30,000.00 Includes, sports leagues, clubs <strong>and</strong> casual usersGym - membership 300 $25.00 $90,000.00 $25 per monthFunction Room 10 $20.00 $10,000.00Aerobic Room 10 $2.50 $10,000.00 10 classes per week, for 40 weeks a year with 10 peopleTotal $140,000.00Indoor PoolIncomeUsers Number per week Fees Income NotesCasual - Adult 400 $6.80 $141,440.00 26,000 visits per annumCasual - child 250 $4.40 $57,200.00 26,000 visits per annumClubs 9 $25.00 $11,700.00Swim Lessons 20 $10.00 $48,000.00 10 lessons a week, 6 people per lesson, 40 weeks a yearTotal $258,340.00OperationalSupportOrganisation Income NotesWBOPDC OpsGrant $60,000.00School contribution $50,000.00General grants $10,000.00Total $120,000.00


Appendix 5 - Traffic Engineer’s Letter


Visitor Solutions LtdP.O. Box 14-245PanmureAuckl<strong>and</strong>Ref: 1012614 October 2010Attn: Mr Craig JonesDear SirRe: <strong>Te</strong> <strong>Puke</strong> Swimming Pool & Gymnasium ComplexFurther to our recent discussions, we underst<strong>and</strong> that consideration is being given toconstructing a multi-purpose recreational facility within the grounds of <strong>Te</strong> <strong>Puke</strong> High SchoolThis facility will have a 8-lane 25 metre long indoor pool, a indoor two-court basketballfacility weights <strong>and</strong> function/aerobics area in a upper floor, <strong>and</strong> plant/infrastructure areasadding o the changing areas provided for users.Although we have not been provided with the number of people the overall facility will bedesigned to accommodate, we expect that the peak use of the various components will occurafter school during the weekdays, <strong>and</strong> also during the mid-late morning/early afternoon of theweekends.Given the varying uses are all recreational-related, an assessment of their cumulative parkingrequirements cannot be made at this stage not only because the various operational capacitiesof the activities I not know, but also the District Plan requires facilities of this type(with buildings) to provide motor vehicle <strong>and</strong> bicycle parking at levels that can cater for theproposed participant <strong>and</strong> spectator numbers.Once these numbers are established, we expect that car parking is likely to be required at therate of approximately one space/3 people the facility is design to accommodate, unless thereare good sound grounds to mount an argument to provide parking at this rate for theanticipated peak number of people likely to be present at one time.In our opinion the latter approach recognises the fact that it is highly unlikely that every areawill be operating at capacity at the same time.Despite the absence of anticipated patronage, it is our view that the 50 or so spaces providedon the northern side of the pool (between the road <strong>and</strong> the existing refuse bins) will beinsufficient to meet the needs of the facility. Additional parking should therefore provided.We have explored the options for this additional parking <strong>and</strong> have considered severalscenarios.


2The first scenario is to provide recessed parking bays on Cameron Road on the near side ofthe road. For this o be successfully done it will be necessary convert all of the 1.0m widegrass berm next to the kerb <strong>and</strong> the 1.4m wide footpath into recessed parking bays. As thiswill consume the area used by the footpath, a replacement footpath will have to beconstructed in either the 1.6m grass strip between the edge of the footpath <strong>and</strong> the fence, oralternatively adjacent to the fence within the school grounds.A representative illustration of this area is shown in the following photograph:Given the fact that any work close to or beyond the fence (within the school) will requireretaining to accommodate the sloping l<strong>and</strong> in the area, the effective width of the footpath willbe influenced by the presence of the trees, <strong>and</strong> the parking yield from this work is likely to besmall <strong>and</strong> confined to the near side of the road, we do not see much merit in undertakingthese works when more effective solutions are available elsewhere.The second scenario envisages the provision of the two rows of 90 degree parking extendingaround the corner where the rubbish skips are presently located <strong>and</strong> run up the hill(through the area where the gradient remains acceptable – 1:20 ideally) to a pointbefore/close to/beyond the High School office/Admin building shown in the plan.Although such a measure is likely to substantially increae the number of spaces available(<strong>and</strong> potentially double the number proposed in the sketch plan provided), it will impact onthe visual, amenity, <strong>and</strong> pedestrian connectivity between the new area <strong>and</strong> the fields – as thefollowing photograph shows.Physical works will also be required to ensure that the gradient vehicles are parking on do notgenerally accepted upper limits.


3Whilst this scenario has advantages, we suspect that the balancing of the connectivity,amenity <strong>and</strong> traffic needs of the area may result in yield that is reduced in number <strong>and</strong>confined to an area much less than that visible in the following photograph. The nett effectcould therefore be an increase in the number of parking spaces available, but the overallsupply not meeting the number required.It is for this reason that scenario three has been identified. In essence, this scenario envisagesthe clearing of the central part of the wooded grove <strong>and</strong> providing a parking area within thisclearing that could potentially be accessed from both the school’s access as well as the accesson the other side of the grove that runs beside the tennis courts.From an on-site appraisal, we believe that if some of the trees within the inner part of thegrove were to be removed, <strong>and</strong> the outer trees that make up the peripheral belt were to beretained, a carpark of a moderately large, but unconventional size, could be provided byremoving the knoll in the middle <strong>and</strong> levelling the cleared area in a cut-to-fill manner toprovide a relatively level area.This general area is shown in the following panoramic photograph, with the red “X”sindicating the trees that could potentially be removed:XXXXX


4With the removal of one or more of the more significant trees around the periphery the size<strong>and</strong> yield of this car park could be further increased.It is appreciated that such a measure may require ameliorative measures to be taken to protectthe roots of the remaining trees, <strong>and</strong> it is for this reason that we recommend that furtherinvestigations be carried to determine the shape, (vehicular <strong>and</strong> pedestrian) connections, <strong>and</strong>yield of this potential parking area.This investigation should also consider the feasibility of providing the parking on a slightlyelevated structure to reduce the disturbance to the roots of the trees that are to remain, as wellas the gradients that will result in the car park <strong>and</strong> on the connections that will serve it.Consideration should also be given to the potential use of this parking area by users of thetennis courts with the view to either accommodating these other users or identifying measureto prevent/restrict its use by these users.Should these subsequent investigations find that a car park is feasible in this area <strong>and</strong>achieves a desirable number of spaces, it together with any addition al parking available fromthe second scenario may well result in an adequate pool of parking being available for theproposed facilities.During the course of our discussions, you also asked us to consider the benefits of the parallel<strong>and</strong> angle parking located on Beatty Avenue to the proposed facility. Being located on the farside of the sports fields <strong>and</strong> not having good all-weather connectivity makes them lessattractive than other parking opportunities that are close to the facility.This coupled with the fact that exposed nature of the walk between the two locations will beunpleasant in inclement weather conditions results in us forming the view that this parking,whish available, is unlikely to be used by many (if any) patrons of the proposed facility.We therefore believe that it is best used by those associated with summer <strong>and</strong> winter sportingcodes that use the sports grounds.In summary then, several options exist to provide additional parking. However, further workwill be needed to substantiate the quantum of parking required for the level of activityenvisaged, <strong>and</strong> the parking yields that can be achieved in the identified areas.We trust this information is sufficiently detailed for your immediate needs. Should you wishto discuss any matter in greater detail, do not hesitate contacting us.Yours faithfullyTRAFFIC ENGINEERING & MANAGEMENT LTDP.R. BrownDirector

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!