13.07.2015 Views

Barclays 2012 CEO Energy/Power Conference - Peabody Energy

Barclays 2012 CEO Energy/Power Conference - Peabody Energy

Barclays 2012 CEO Energy/Power Conference - Peabody Energy

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Peabody</strong> Advancing Late-StageProjects to Completion● Wilpinjong expansion completed on time and on budget– Expanded BTU‟s lowest-cost Australia thermal mine capacity by30% to ~13 MTPY● Millennium expansion near completion– Doubling mine capacity to ~3 – 4 MTPY– Includes SHCC/PCI and adding HCC to mine mix● Burton widening/extension nearingcompletion– Moving to new HCC mining area in Q3– Extends mine life and expands production● North Goonyella longwall top coal cavingtechnology to add HQHCC volumes● Eaglefield co-development extendingmine life, HQHCC production● Middlemount permit received foreventual increase to4 MTPY (100% basis)26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!