13.07.2015 Views

DV08-081a Geological Hazards Ordinance - Pasco County ...

DV08-081a Geological Hazards Ordinance - Pasco County ...

DV08-081a Geological Hazards Ordinance - Pasco County ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

F. Fill proposed for the development site in the building pad areasshall be installed to within twelve(12) inches of the final grade prior to record platapproval or prior to issuance of the building permit where a record plat is notrequired. The fill shall be of an appropriate quality and composition containingless than 12% fines passing the No. 200 sieve. Fill soils shall be free of organicmaterials, clays and construction debris. Use of fill material with fines up to 20%passing the No. 200 sieve can be used with special precautions. The fill shall beplaced in compliance with the Geotechnical/<strong>Geological</strong> Engineering Reportrecommendations and compacted to a minimum density of 95% of the modifiedProctor maximum dry density.Density tests to confirm compaction shall berequired on each proposed lot, within the building pad area, before the next lift isplaced. Upon completion of the land development construction, a civil, structuralor geotechnical engineer shall provide a certification to <strong>Pasco</strong> <strong>County</strong> that theproject, including each building pad area, complies with the recommendations ofthe Geotechnical/<strong>Geological</strong> Engineering Report.The requirements of thissection cannot be bonded.704.7 Building Permit Application RequirementsPrior to the issuance of any building permit, evidence must be provided thatcompressible/collapsible material has been excavated and removed orrecompacted, the site is free from the presence of organic materials, constructiondebris and/or clay soils, to prevent ground settlement in all areas of projectdevelopment or, in the alternative that proper foundations have been designedfor use with the compressible/collapsible materials. The type and size of allfoundations for structures in the area of the project development will be designedin accordance with the design recommendations of the project geotechnicalengineer to minimize the potential for ground settlement impacts.Therequirements of this section cannot be bonded.704.8 Building Permit Inspection RequirementsAll building permit inspection requirements shall be in accordance with thetechnical standards adopted in Chapter 18, Building Regulation, of the <strong>Pasco</strong><strong>County</strong> Code of <strong>Ordinance</strong>s and per density testing/certification as required bythe Building Official.<strong>DV08</strong>-081_1_<strong>DV08</strong>-<strong>081a</strong>_Geologic_<strong>Hazards</strong>_<strong>Ordinance</strong>-Feb_27_2008.doc 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!