13.07.2015 Views

Operational Range Assessment Program Phase I Qualitative ...

Operational Range Assessment Program Phase I Qualitative ...

Operational Range Assessment Program Phase I Qualitative ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Operational</strong> <strong>Range</strong> <strong>Assessment</strong> <strong>Program</strong>, <strong>Phase</strong> I <strong>Qualitative</strong> <strong>Assessment</strong> Report May 2008River Road Training Site, DelawareTable ES-1: Summary of Findings and Conclusions for River Road Training SiteCategoryUnlikelyTotal Numberof <strong>Range</strong>s andAcreage Source(s) Pathway(s)13 operationalranges;181.60 acresSmall arms range firing lines,impact berms, and historicalimpact areasNo source – limited or nomilitary munitions useSurface water andgroundwaterHumanReceptorsNoneEcologicalReceptorsSensitive speciesand environmentspresent in areasadjacent to theinstallationNot evaluated (no source was identified)Conclusions and RationaleRe-evaluate during the five-yearreview. The receptors identifiedare unlikely to be affected bypotential MCOC due to the sizeand flow rate of the DelawareRiver.Re-evaluate during the five-yearreview. No source wasidentified.EA Engineering, Science, and Technology, Inc. ES-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!