13.07.2015 Views

Case Study EZ Roll Gravel Paver Dallas Arboretum - NDS

Case Study EZ Roll Gravel Paver Dallas Arboretum - NDS

Case Study EZ Roll Gravel Paver Dallas Arboretum - NDS

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>EZ</strong> <strong>Roll</strong> <strong>Gravel</strong> <strong>Paver</strong>CASE STUDY<strong>Dallas</strong> <strong>Arboretum</strong> Parking Lot<strong>EZ</strong><strong>Roll</strong> <strong>Gravel</strong> <strong>Paver</strong> with geotextilefabric backing.Fast FactsProduct & Quantity<strong>NDS</strong> <strong>EZ</strong> <strong>Roll</strong> <strong>Gravel</strong> <strong>Paver</strong>75,000 sq. ft.Address8525 Garland Road<strong>Dallas</strong>, TX 75218ApplicationDaily Parking – Cars, trucks and busesInstallation DateApril 2012Owner & DESIGNER<strong>Dallas</strong> <strong>Arboretum</strong>, City of <strong>Dallas</strong>Design TeamArchitect – Good, Fulton 7 Farrell;<strong>Dallas</strong>, TXLandscape Architect – MKW;Rutherford, NJCivil Engineer – Pacheco KochConsulting Engineers; <strong>Dallas</strong> TXCONstruction teamTurner Construction CompanyValleyCrest Landscape Construction


<strong>EZ</strong> <strong>Roll</strong> <strong>Gravel</strong> <strong>Paver</strong>CASE STUDYProject InformationThe <strong>Dallas</strong> <strong>Arboretum</strong> is anationally acclaimed botanicalgarden situated on 66 acres onthe shores of White Rock Lakein <strong>Dallas</strong>, Texas. The venue is animportant, high-profile facility thatgenerates critical tourism andincome to the area. In 2011, morethan 500,000 visitors from over 50countries walked through its gatesto enjoy the scenery and activities.As part of an active expansion andimprovement program, the <strong>Dallas</strong><strong>Arboretum</strong> needed additionalparking to accommodate theforecasted rise in traffic volumeinto the park over the next decade.The new parking structure neededto blend into the surrounding areawhile mitigating stormwater runoffconcerns. In close collaborationwith the City of <strong>Dallas</strong>, the designteam decided to use a natural,permeable surface capable ofwithstanding heavy parkinglot traffic. After comparing thevarious products available, thedesign team chose tan-colored<strong>NDS</strong> <strong>EZ</strong> <strong>Roll</strong> <strong>Gravel</strong> <strong>Paver</strong>s fortheir strength, durability and easeof installation.<strong>EZ</strong> <strong>Roll</strong> is an ADA-compliantresin-based cellular reinforcementsystem that houses stone in-fill,supports heavy vehicular loads,maintains surface permeability,and prohibits rutting. The pavercomes in 4 X 150’ units (600sq ft) that are rolled out over acompacted, permeable engineeredbase layer, and filled with 3/8”angular clean stone. <strong>EZ</strong> <strong>Roll</strong><strong>Gravel</strong> <strong>Paver</strong> is available in black,tan, gray, and brick red to blend inwith any colored natural stone fill.Phase 1 of the project involvedinstalling <strong>EZ</strong> <strong>Roll</strong> in a parking areaspanning approximately 75,000sq. ft. The design team neededto delineate driving lanes fromparking stalls, so <strong>NDS</strong> designed,developed, and delivered the <strong>EZ</strong>Marker system—a high-impactplastic marking dome that securelyfastens into the paver’s cells andrises ¾” above the grid.<strong>NDS</strong> reps worked closely withthe design team and contractorsthroughout the project to ensureproper technical and designsupport, on-time delivery,and installation consultations.According to Christopher Lang,Senior Project Manager for GCTurner Construction Company,“The <strong>NDS</strong> product and customerservice were excellent. The <strong>EZ</strong><strong>Roll</strong> <strong>Gravel</strong> <strong>Paver</strong>s provided atough and permeable surfacethat blended with the beautifulscenery of the <strong>Dallas</strong> <strong>Arboretum</strong>.<strong>NDS</strong> provided the flexibility,engineering, and site visits neededto ensure quality installation andultimate performance.”Phase 2 of the parking project willbegin in mid-November and willinclude up to 110,000 sq. ft. ofpermeable paving. The scheduleallows for construction to becompleted by the first weekendof March 2013, just in time for theannual <strong>Dallas</strong> Blooms event that isexpected to attract nearly 200,000visitors to the <strong>Arboretum</strong>.For more information about thisproject, contact <strong>NDS</strong> Marketing atmarketing@ndspro.com. Forinformation regarding the <strong>NDS</strong>line of Grass and <strong>Gravel</strong> <strong>Paver</strong>s,or any other product inquiry, go towww.ndspro.com or call customerservice at (800) 726-1994.Above Photos: Installation of NDs <strong>EZ</strong> <strong>Roll</strong> <strong>Gravel</strong> <strong>Paver</strong> and <strong>EZ</strong> Marker Parking Delinators.851 North Harvard Avenue • Lindsay, CA 93427 • 800 726 1994 • ndspro.com • nds@ndspro.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!