13.07.2015 Views

Download report here - Norwegian Refugee Council

Download report here - Norwegian Refugee Council

Download report here - Norwegian Refugee Council

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

interviewing process was to be qualitative and participatory based upon a set of guidingquestions (see Annex 2) although also following the flow of discussions so that eachinterview has a similar structure but is responsive to the person interviewed. Wheneveruseful and possible, we reflected upon the overall system in which the SBT is operating; i.e.,by using a holistic approach and by using interview techniques such as open circularquestioning which helped us to better understand the context of the SBT and t<strong>here</strong>lationships of the main stakeholders. Some follow-up to the interviews occurred through e-mailing (limited) and having additional conversations. The two evaluation experts conductedinterviews and discussions with the MSU and UNDPA staff in New York and telephone orSkype interviews with past and current members of the SBT.Results: interviews providing qualitative data collection for the authoring of the <strong>report</strong>.Phase IV: Draft Report and Presentation [Duration: 15.10. 15.12.2010]In this phase, the evaluation experts conducted final interviews and writing of the final <strong>report</strong>.This phase required some telephone interviews to confirm findings and an additionalconsideration of written material, etc. Antje Herrberg and Oliver Wils met in Berlin to discussthe findings and the structure the <strong>report</strong> on 18-19 November. The <strong>report</strong> is to be submitted on26 November. The further timelines communicated to the evaluation team are:03 December: Feedback Steering Committee (MSU and NRC) on Draft 110 December: Submission of Draft Evaluation Report15 December: Presentation of Draft Evaluation Report to the NRC and MSUResults: Draft Report, PresentationFinal Report: Submitted on 20.01.20117

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!