SPECIAL PROVISIONS - City of Guelph

SPECIAL PROVISIONS - City of Guelph

SPECIAL PROVISIONS - City of Guelph

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Under no circumstances shall the Contractor claim additional payment from the Owner related tothe characterization <strong>of</strong> quality, designation <strong>of</strong> waste types, delineation <strong>of</strong> quality and extent <strong>of</strong>excess material, estimation <strong>of</strong> quantity, and costs (whether accurate and correct or not) associatedwith excavation, removal, segregation, temporary stockpiling, loading, transportation and re-useor disposal <strong>of</strong> excess materials, including excess earth and rock generated by the Contract work.Disposal SitesFor greater certainty, the Owner has not designated or identified specific haulers, receivers, and/ordisposal sites for excess materials generated under this Contract. The Contractor is solelyresponsible for identifying and selecting appropriate haulers, receivers, and/or disposal sitesrequired to complete the work <strong>of</strong> this Contract. This disposal site shall be in accordance withOPSS 180.OPSS 180.07.01 Conditions on Management <strong>of</strong> Excess material - GeneralOPSS 180.07.01, the third sentence is deleted and replaced with the following: “Where excessmaterial includes asbestos waste, the asbestos waste shall be managed in accordance with allapplicable legislation, including, but not limited to, Ontario Regulation 347/90 (as amended).”OPSS 180.07.05 Conditions on Management by Disposal as Non-HazardousSolid Industrial or Commercial WasteOPSS 180.07.05 b) is deleted in its entirety.OPSS 180.10 Basis <strong>of</strong> PaymentOPSS 180.10 is deleted in its entirety and replaced with the following: “Payment for themanagement <strong>of</strong> excess material shall be included in the tender item for Excavation <strong>of</strong> Materialsand under tender items requiring such management and shall include all costs associated withsampling, testing, analyses, characterization <strong>of</strong> quality, designation <strong>of</strong> waste types, delineation <strong>of</strong>quality and extent <strong>of</strong> excess material, identifying and selecting appropriate haulers, receivers,and/or disposal sites for excess material, acquiring approvals, releases and agreements, and allother costs associated with the work pursuant to this special provision and OPSS 180.Costs for CorrectionThe Contractor shall, at its own cost, promptly correct any breach <strong>of</strong> this special provision orOPSS 180.IndemnificationFor greater certainty, Supplemental General Conditions Clause 2 (SGC 2), Indemnification,applies to this special provision and OPSS 180.SP8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!