13.07.2015 Views

NYSDEC presentation on GE Hudson Falls Remediation

NYSDEC presentation on GE Hudson Falls Remediation

NYSDEC presentation on GE Hudson Falls Remediation

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2004 ROD Remedial Acti<strong>on</strong> ObjectivesMitigate the impacts of the c<strong>on</strong>taminants at the site <strong>on</strong> theHuds<strong>on</strong> River:• Eliminate, to the extent practicable, the migrati<strong>on</strong> ofPCBs into the Huds<strong>on</strong> River via erosi<strong>on</strong> of PCBc<strong>on</strong>taminated soils, transport of suspended sedimentwith surface water, and transport of PCBs c<strong>on</strong>tained inNAPL, groundwater or surface water• Eliminate, to the extent practicable, migrati<strong>on</strong> of NAPL tothe Huds<strong>on</strong> River and other off-site areas throughremoval and hydraulic management• Eliminate, to the extent practicable, the migrati<strong>on</strong> ofPCBs from the site to biota in or near the Huds<strong>on</strong> River

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!