13.07.2015 Views

NYSDEC presentation on GE Hudson Falls Remediation

NYSDEC presentation on GE Hudson Falls Remediation

NYSDEC presentation on GE Hudson Falls Remediation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Basis for TDCS• Mobile PCB oil was in the bedrock bey<strong>on</strong>d thecapture z<strong>on</strong>e of the existing remedial systems• The steep hydraulic gradients in the vicinity of thedam and waterfall made it difficult to interceptthe flow of PCB oil to the river• The installati<strong>on</strong> of the TDCS beneath the primarybedrock horiz<strong>on</strong> through which the PCB oilmigrated to the river allowed establishment ofsufficient hydraulic gradients into the TDCS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!