- Page 1 and 2: Board of Public Utilities [Type a q
- Page 3 and 4: MEMBERS PRESENT: • Glenn Woodwell
- Page 5 and 6: DRAFT Page 3 of 12 DRAFT BOARD OF P
- Page 7 and 8: DRAFT Page 5 of 12 DRAFT BOARD OF P
- Page 9 and 10: DRAFT Page 7 of 12 DRAFT BOARD OF P
- Page 11 and 12: DRAFT BOARD OF PUBLIC UTILITIES MEE
- Page 13: DRAFT BOARD OF PUBLIC UTILITIES MEE
- Page 17 and 18: Revised January 24, 2007 July 18, 2
- Page 19 and 20: BUSINESS Cooperation on Achieving t
- Page 21 and 22: ESB presentation to UB July 18, 201
- Page 23 and 24: Sustainability Plan Draft Introduct
- Page 25 and 26: Table 1: Static vs. dynamic sustain
- Page 27 and 28: much and how often a building needs
- Page 29 and 30: 2006 the County recycling rate has
- Page 31 and 32: Performance In 2010, 5 miles of tra
- Page 33 and 34: = Figure 6: The top figure shows th
- Page 35 and 36: Figure 8: Greenhouse gas emissions
- Page 37 and 38: Electricity Natural Gas Gasoline Di
- Page 39 and 40: Environmental Sustainability Initia
- Page 41 and 42: TABLE OF CONTENTS INTRODUCTION 1 EN
- Page 43 and 44: Introduction Environmental Sustaina
- Page 45 and 46: Environmental Sustainability Initia
- Page 47 and 48: Environmental Sustainability Initia
- Page 49 and 50: Environmental Sustainability Initia
- Page 51 and 52: Proposed Approach Organizational St
- Page 53 and 54: Environmental Sustainability Initia
- Page 55 and 56: Environmental Sustainability Initia
- Page 57 and 58: Cool Counties Program Environmental
- Page 59 and 60: Environmental Sustainability Initia
- Page 61 and 62: Environmental Sustainability Initia
- Page 63 and 64: Environmental Sustainability Initia
- Page 65 and 66:
Environmental Sustainability Initia
- Page 67 and 68:
Environmental Sustainability Initia
- Page 69 and 70:
Environmental Sustainability Initia
- Page 71 and 72:
Environmental Sustainability Initia
- Page 73 and 74:
Environmental Sustainability Initia
- Page 75 and 76:
Environmental Sustainability Initia
- Page 77 and 78:
Recycling Energy Conservation Green
- Page 79 and 80:
Recycling Environmental Sustainabil
- Page 81 and 82:
Environmental Sustainability Initia
- Page 83 and 84:
This policy, adopted in 2010, ensur
- Page 85 and 86:
help grow the renewable energy move
- Page 87 and 88:
Watering with Effluent The necessar
- Page 89 and 90:
The County has donated books focuse
- Page 91 and 92:
2. With the Senior Management Team
- Page 93 and 94:
Appendix D: Methodology for determi
- Page 95 and 96:
BOARD OF PUBLIC UTILITIES Agenda Do
- Page 97 and 98:
2 96
- Page 99 and 100:
4 98
- Page 101 and 102:
6 100
- Page 103 and 104:
LACU Distribution System The LACU d
- Page 105 and 106:
Switching between the primary and s
- Page 107 and 108:
through the under/over frequency se
- Page 109 and 110:
The White Rock substation is fed fr
- Page 111 and 112:
extension would provide an addition
- Page 113 and 114:
Figure 8. Graph of LAC SAIDI for th
- Page 115 and 116:
mis-coordination in the underground
- Page 117 and 118:
Item (5) is ongoing. There have bee
- Page 119 and 120:
the County residents, Utilities Boa
- Page 121 and 122:
unobstructed access; and, feeds dea
- Page 123 and 124:
Distribution system SCADA expansion
- Page 125 and 126:
Road and the Pajarito Cliffs Site a
- Page 127 and 128:
BUSINESS Discussion of Sewer Projec
- Page 129 and 130:
NAME SUBJECT BACKGROUND BOARD OF PU
- Page 131 and 132:
EXISTING CIP PROGRAM ‐ INCLUDING
- Page 133 and 134:
SUMMARY OF RATE CHANGES BY SCENARIO
- Page 135 and 136:
Los Alamos County Utilities Departm
- Page 137 and 138:
Los Alamos County Utilities Departm
- Page 139 and 140:
Los Alamos County Utilities Departm
- Page 141 and 142:
BOARD OF PUBLIC UTILITIES Agenda Do
- Page 143 and 144:
BOARD OF PUBLIC UTILITIES Agenda Do
- Page 145 and 146:
Evaluation as Team Building Los Ala
- Page 147 and 148:
I. Organizational Management and Le
- Page 149 and 150:
III. Long Range Planning RESPONSIBI
- Page 151 and 152:
follows through, to see that the De
- Page 153 and 154:
Improve employee engagement: Incorp
- Page 155 and 156:
FY2013 Division Goals Summary - FIN
- Page 157 and 158:
FY2013 Division Goals Summary - GAS
- Page 159 and 160:
FY2013 Division Goals Summary ‐ E
- Page 161 and 162:
FY2013 Division Goals Summary - ELE
- Page 163 and 164:
BOARD OF PUBLIC UTILITIES Agenda Do
- Page 165 and 166:
INCORPORATED COUNTY OF LOS ALAMOS D
- Page 167 and 168:
BPU INPUT QUESTIONNAIRE APPENDIX OP
- Page 169 and 170:
BPU INPUT QUESTIONNAIRE APPENDIX OP
- Page 171 and 172:
INCORPORATED COUNTY OF LOS ALAMOS D
- Page 173 and 174:
INCORPORATED COUNTY OF LOS ALAMOS D
- Page 175 and 176:
BOARD OF PUBLIC UTILITIES Agenda Do
- Page 177 and 178:
INCORPORATED COUNTY OF LOS ALAMOS R
- Page 179 and 180:
2011982 KIMBERLY KEEN 667.28 201358
- Page 181 and 182:
BOARD OF PUBLIC UTILITIES Agenda Do
- Page 183 and 184:
INCORPORATED COUNTY OF LOS ALAMOS S
- Page 185 and 186:
B. For Task Order #1, as directed b
- Page 187 and 188:
softwareimprovements, databases, an
- Page 189 and 190:
SECTION S. NOTICE: Any notices requ
- Page 191 and 192:
BOARD OF PUBLIC UTILITIES Agenda Do
- Page 193 and 194:
Los Alamos Canyon Dam Modifications
- Page 195 and 196:
194 3 RFP2013-1838 Los Alamos Canyo
- Page 197 and 198:
INCORPORATED COUNTY OF LOS ALAMOS B
- Page 199 and 200:
1.3 Exhibit B CONTRACT PRICE RFP201
- Page 201 and 202:
STATUS REPORTS • Electric Distrib
- Page 203 and 204:
202
- Page 205 and 206:
204
- Page 207 and 208:
Los Alamos County Utilities Departm
- Page 209 and 210:
YEAR OUSTANDING 7/1 FY07 24,050.38
- Page 211 and 212:
NAME DOI REPTD EE# DESC DEPT EXP Co
- Page 213 and 214:
Los Alamos County Utilities Enginee
- Page 215 and 216:
Los Alamos County Utilities Enginee
- Page 217 and 218:
Los Alamos County Utilities Enginee