13.07.2015 Views

Annual Report - Washington Suburban Sanitary Commission

Annual Report - Washington Suburban Sanitary Commission

Annual Report - Washington Suburban Sanitary Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Patuxent Reservoirs Watershed <strong>Annual</strong> <strong>Report</strong>November 2005TABLE 1. PRIORITY RESOURCES CHARTResource: Reservoir/Water SupplyIssue: The public need for a sufficient quantity of safe and high quality drinking water calls for adopting a proactive and multi-barrierapproach, which starts with utilizing raw water of the highest quality and sustainable quantity, now and in the future. To achieve thisfor the Patuxent water filtration plant we need to control reservoir eutrophication, reduce Disinfectant By-Products (DBPs) precursors,and limit reservoirs capacity loss.Measures Goals Implementation Items Time Line ResponsibleChlorophyll-aDissolved oxygenSuite of water qualityparameters in reservoirmonitoring protocolTotal organic carbon (TOC)Sediment• Chl-a not to exceed a 10 ug/l meanduring the growing season and not toexceed a 30 ug/l instantaneousconcentration• DO not to fall below 5 mg/l at anytime in the epilimnion, not to fallbelow 5 mg/l in the entire watercolumn during completely mixedperiods, and not to fall below 10%saturation at any time in thehypolimnion• Five year data trend analysis forother monitored water qualityparameters shows no netdeterioration• TOC – 20% annual reduction goal,with 40% reduction for peak quarterat the location where water iswithdrawn for treatment purposes• Sediment accumulation rate not toexceed previous years• Perform reservoir monitoring forChl-a, DO, and TOC during thegrowing season• Enhance and fine tune modelreliability for watershedmanagement.• Develop and begin implementationof a plan to reduce nutrients, basedon model/TMDL requirements.• Update trend analysis for reservoirwater quality parameters on a 5-year cycle• Perform bathymetric survey ofreservoirs at 10 year intervals orlessOngoingOngoing2006 - 200820092006PartnerWSSCWSSC/MDETACWSSCWSSC11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!