TOTO S.P.A. COSTRUZIONI GENERALIIn April, foundations work on the Sparvo Viaduct were completed and by the end of theyear the various parts of both metal decks – both in the North Lane and in the South one– were completed and work was begun on putting the finishing touches to the viaduct.In 2011 the first stage of the Earth Movement work was completed for the transport andstorage of the prefabricated ashlars and the installation of the spoil conveyor to be usedby the TBM.In September the excavation materials from both tunnels were transferred to DepositArea 5. The transportation, which reached 65,000 mc, led to significant maintenance workhaving to be carried out on the work site and ordinary roads.A/24 - A/25 Motorway - Sundry maintenance workClient: Strada dei Parchi S.p.A.Description: Ordinary and extraordinary maintenance workProgressive contractual amount: €.75.837.448Contracting company: <strong>Toto</strong> S.p.A.Production in 2011 amounted to € 7.5 million.The ordinary and extraordinary maintenance work on the two A/24 and A/25 motorwaysections will continue over the next few years.A/24 - A/25 Motorway - Traffic barriers - lot 1Client: Strada dei Parchi S.p.A.Description: replacement of the traffic barriers on the A24 from Teramo to Aquila Ovestand the A25 from Avezzano to the junction with the A14 - Lot 1 .Contractual amount: €.40.573.050Contracting company: Joint venture <strong>Toto</strong> S.p.A. – IMC SrlPercentage of investment: 19,36%Percentage of work: 100%The tender involves the redevelopment of the traffic divider and the replacement of thesafety barriers.Production in 2011 amounted to approximately € 2 million. 99% of the work had beencompleted as of 31 December 2011.On 31 December 2011 the following were installed overall:- Approximately 118,850 metres of single-wire New Jersey H3 guardrails.- Approximately 41,750 metres of New Jersey H4 bridge guardrails..An act of submission to the main contract was signed with the Contracting Body for theperformance of further work to replace barriers for a total of about € 932,413.A/24 - A/25 Motorway - Traffic barriers - lot 2Client: Strada dei Parchi S.p.A.Description: replacement of the side barriers of the A24 from Teramo to Aquila Ovest andthe A25 from Avezzano to the A14 Section 1 connection.Contractual amount: €.35.729.865.Contracting company: <strong>Toto</strong> S.p.A.The work begun in 2007 relate to the replacement of the side safety barriers both onembankments and on structures.Production attained in 2011 amounted to € 0.2 million.The project involves the replacement of the metal barriers along the A24 / A25 sections.More specifically, the barriers fixed into the grounder were replaced with the new H2Directors’ Report to the financial statements as of 31/12/2011 Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!