13.07.2015 Views

Fire Alarm System Installation Permit Application - City of Galesburg

Fire Alarm System Installation Permit Application - City of Galesburg

Fire Alarm System Installation Permit Application - City of Galesburg

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GALESBURG FIRE DEPARTMENTFIRE PREVENTION BUREAUFIRE ALARM SYSTEM INSTALLATION - PERMIT APPLICATIONThis form is to be completed and returned to:<strong>Galesburg</strong> <strong>Fire</strong> Department<strong>Fire</strong> Prevention Bureau150 South Broad St.<strong>Galesburg</strong>, IL 61401This form must be submitted with a check to cover the permit fee ($40) and two (2) sets <strong>of</strong> plans (to scale) <strong>of</strong> thework site a minimum <strong>of</strong> two (2) weeks prior to any scheduled work at the location. All work must conform to the2006 International <strong>Fire</strong> Code. Please call 309-345-3756 for more information.TYPE OF ACTION____ <strong>Installation</strong> ____ Modification ____ Removal ____Expansion____ Other – Describe: _________________________________________________TYPE OF SYSTEM (indicate all that apply)____ Heat Detection ____ Smoke Detection ____Manual Pull Stations____ Other – Describe: _________________________________________________FACILITY OWNERFACILITY INFORMATIONName: __________________________________ Name: __________________________________Street Address: ___________________________ Street Address: ____________________________<strong>City</strong>/St/Zip: _____________________________ <strong>City</strong>/St/Zip: <strong>Galesburg</strong>, Illinois 61401Contact Person: ___________________________ Contact Person: ____________________________Phone: _________________Phone: ______________________CONTRACTORName: __________________________________Please note, additional license(s) may beStreet Address: ___________________________required by the <strong>Galesburg</strong> <strong>City</strong> Clerk’s<strong>City</strong>/St/Zip: _____________________________<strong>of</strong>fice. Contact that <strong>of</strong>fice at <strong>City</strong> Hall,Contact Person: ___________________________ 309-345-3610.Phone: _________________TYPE OF MONITORING____ Direct line to PSB Communications Center____ Direct line to alarm company monitoring center, company: ________________________________________ Local (in-house) alarm onlyDATE WORK IS SCHEDULED TO BEGIN: ____________________APPROXIMATE COMPLETION DATE: ____________________********************************************************************************Date Received by <strong>Fire</strong> Prevention Bureau: ___________ Approved by: ________________________________<strong>Permit</strong> # ________________


FIRE ALARM SYSTEM INSTALLATION INFORMATION<strong>Galesburg</strong> <strong>Fire</strong> Department150 S. Broad St.<strong>Galesburg</strong>, IllinoisPhone: 309-345-3756Fax: 309-343-1340The <strong>City</strong> <strong>of</strong> <strong>Galesburg</strong> has adopted the 2006 International <strong>Fire</strong> Code by <strong>City</strong> Ordinance.Before an occupancy permit is granted the <strong>Fire</strong> Prevention Bureau must receive documentation <strong>of</strong>acceptance testing and statement <strong>of</strong> compliance.The following <strong>Fire</strong> Code Requirements apply:907.1.1 Construction DocumentsConstruction documents for fire alarm systems shall be submitted for review and approval prior to systeminstallation. Construction documents shall include, but not be limited to, all <strong>of</strong> the following:1. A floor plan2. Location <strong>of</strong> alarm-initiating and notification appliances3. <strong>Alarm</strong> control and trouble signaling equipment4. Annunciation5. Power connection6. Battery calculations7. Conductor type and sizes8. Voltage drop calculations9. Manufacturers, model numbers and listing information for equipment, devicesand materials.10. Details <strong>of</strong> ceiling height and construction11. The interface <strong>of</strong> fire safety control functions901.2.1 Statement <strong>of</strong> ComplianceBefore requesting final approval <strong>of</strong> the installation, where required by the code <strong>of</strong>ficial, the installingcontractor shall furnish a written statement to the code <strong>of</strong>ficial that the subject fire protection system hasbeen installed in accordance with approved plans and has been tested in accordance with themanufacturer’s specifications and the appropriate installation standard. Any deviation shall be attached tothe written statement.907.2.10.4 Acceptance TestingWhen the installation <strong>of</strong> the alarm devices is complete, each detector and interconnecting wiring formultiple-station alarm devices shall be tested in accordance with the household fire warning equipmentprovision.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!