13.07.2015 Views

Transitional profiles ring segments - rectangular - ZVVZ a.s.

Transitional profiles ring segments - rectangular - ZVVZ a.s.

Transitional profiles ring segments - rectangular - ZVVZ a.s.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Attachment 1 to KM 12 0440a3.2 Shipment3.2.1 The transitions are shipped unwrapped and must be well secured for transport.3.2.2 The weight of the heaviest transition is approx. 380 kg.3.3 Hand over3.3.1 The scope and manner of hand over is dictated by the contract that has been agreedbetween the manufacturer and the customer.3.3.2 Du<strong>ring</strong> the transfer of the goods it is essential that the customer checks to see if thetransitions have been supplied according to the order respective of size and design (see clause 3.1.1) andinclusive of the technical documentation (see clause 3.1.2.) and whether any defects or damage isevident.3.4 Storage3.4.1 The transitions must be stored is such a way so that possible harm will be minimal. Theyare always stored with the largest flange down.3.4.2 Du<strong>ring</strong> storage, it is essential that the transitions be periodically checked for to insure theirservice condition.3.4.3 Before the transition is to be installed, the storage provider will provide a document statingthat the transition has been correctly stored and monitored for damage du<strong>ring</strong> the period of storage.4 INSTALLATION4.1 Before installation, it is essential that the transition is examined so that it conforms to thepurchase order (see clause 3.1.1.) and includes all technical documentation (see clause 3.1.2.), that thereis no visible damage from the manufacturer and all storage principles have been followed as per clauses3.4.1 to 3.4.3.4.2 The installation of the transitions is performed within the HVAC works and is governed bythe project documentation.4.3 Fastening the transition to the piping is by bolting the pipes together with a seal between theflange surfaces (see design. 1).5 MAINTENANCE AND REPAIRS5.1 Checking of sealing and leakage of the transitions should be performed periodically. Anydamage should be remedied as soon as possible.6 DISPOSAL6.1 After the service life of the transition its disposal must conform to Czech law no. 185/2001Sb. and according to the internal policies of the customer purchasing the transition.6.2 disposal of the transitions is resolved by scrapping- 3 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!