13.07.2015 Views

Project Profile on Sattu Manufacturing

Project Profile on Sattu Manufacturing

Project Profile on Sattu Manufacturing

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PAGE ( 2 )8 Administrative Expenses : Rs.9 Overheads : Rs.10 Miscellaneous Expenses : Rs.11 Depreciati<strong>on</strong> : Rs.30,000.0075,000.0060,000.0039,000.0012 Insurance : Rs.4,900.0013Interest (As per the PLR)a. C.E.Loan :Rs.63,700.00b. W.C.Loan : Rs.48,750.00Total InterestRs.112,450.0014Working Capital Requirement :Fixed CostRs.278,600.00Variable CostRs.2,039,750.00Requirement of WC per CycleRs.386,392.0015 Cost AnalysisSr.No.ParticularsCapacity Utilizati<strong>on</strong>(Rs in '000)100% 60% 70% 80%1 Fixed Cost278.60 167.16 195.02 222.882 Variable Cost2040.00 1224.00 1428.00 1632.003 Cost of Producti<strong>on</strong>2318.60 1391.16 1623.02 1650.884 <str<strong>on</strong>g>Project</str<strong>on</strong>g>ed Sales2600.00 1560.00 1820.00 2080.005 Gross Surplus281.40 168.84 196.98 225.126 Expected Net Surplus242.00 130.00 158.00 186.00Note : 1. All figures menti<strong>on</strong>ed above are <strong>on</strong>ly indicative.2. If the investment <strong>on</strong> Building is replaced by Rental thena. Total Cost of <str<strong>on</strong>g>Project</str<strong>on</strong>g> will be reduced.b. Profitability will be increased.c. Interest <strong>on</strong> C.E.will be reduced.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!