10 Laying of cable 11 KV XLPE 3x70 sqmm in Kacha road by digging oftrench laying of cable with first class brick boxing and sand.11 Hoisting of 11 kV 3x70 Sq. mm XLPE cable at double pole. Cable willbe passed through GI 4"dia. pipe of required size duly clamped withpole at the bottom, middle and top of the pole. (All the material will bearranged by the contractor)12 Construction of brick masonry distribution pillar box by diggingfoundation concerting brick masonry wall RCC slap fabrication andfixing of 2 No. MS angle (40x40x51200mm) suitable for fixing 4 no. busbar for incoming & 3 No. fuse unit 300 amp.for outgoing & its plastering,queering as per RESSPO specification & direction of E/I13 Laying & Hoisting on pole of LT PVC Cable 3.5x400/240/120 sqmmCable along with crimping of lug as per RESSPO. Only cable shall besupplied by the department.14 Providing and fixing of fuse unit 500 amp. For outgoing and otheraccessories required.15 Replacement of Old/Damaged ACSR Weasel/Rabit/Dog conductor ofLT Line by new Dog conductor including rolling of old wire with cartageup to JE Dump Store & Cutting and chopping of tree branches forclearance of line16 Making outdoor type termination of 11 KV 3x70mm2 XLPE cable by3x70mm2 outdoor type jointing kit including all material, labour required.17 Digging of pit (3Mtr. wide X3Mtr. straight X1.5Mtr. deep) suitable forJointing with help of Labour and Supply & Fixing of heatsrinck type 11KV straight through Joint Kit for 3x70 sq.mm 11 KV XLPE Cable, afterjointing of kit covering cable & cable box by brick & sand and refilling &leveling the pit. All material shall be supplied by the contractor.18 Providing and fixing of copper bus bar of size 50x6 mm having length750 mm for incoming.19 Providing and fixing of 11 KV TPMO & D O Fuse Set along with clampsand nut bolts on existing of double pole.20 Safe Installation & energizing of 250 KVA T/F on plinth by providing &fixing of L-piece, lugs, making HT/LT connections and itscommissioning.21 Opening of consumer cable connection for replacement of old conductor& reconnection after replacement of conductor.Mtr. 210Nos. 2Nos. 1Mtr. 80Nos. 3KM 1Nos. 2Nos. 1Nos. 4Nos. 1Nos. 1Nos. 30Date:Place:Signature along with Sealof the Contractor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!