13.07.2015 Views

Supplier Quality Manual - Otto

Supplier Quality Manual - Otto

Supplier Quality Manual - Otto

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.4.9 Should approval be granted it will be so noted with an amendment to the purchase order.4.5 Control of Nonconforming Product4.5.1 In the event that material has been shipped to OTTO and it is discovered later to be discrepant bythe supplier, the supplier shall inform OTTO Buyer immediately, identifying the discrepantmaterial.4.5.2 <strong>Otto</strong> reserves the right to sort, rework, or otherwise correct nonconforming material at thesupplier’s cost to minimize/eliminate downtime, or risk to OTTO quality standards, and tomaintain its production and customer requirements.4.5.3 In the event that an OTTO production line is halted due to lack of parts that are attributable tounacceptable parts, quality or missed delivery schedules, OTTO will issue a supplier debit torecover these costs.4.5.4 <strong>Supplier</strong> must maintain control of nonconforming parts including identification and dispositionof parts to be reworked or repaired. Repaired and reworked material shall be reinserted inaccordance with documented procedures. Any rework procedure shall have the approval ofOTTO.4.5.5 <strong>Supplier</strong> must control the segregation of nonconforming material and assure these materials arenot shipped to OTTO.4.6 Corrective Action4.6.1 <strong>Supplier</strong> must have a system for Corrective Action. Corrective Action refers to an internalproblem solving process initiated to prevent future delivery of defective product. Emphasisshould be on identifying potential problems and implementing a solution at the source.4.6.2 OTTO will notify the supplier of a part’s nonconformance using a DMR (Discrepant MaterialReport) which includes the Corrective Action Request (ref.5.2.1 DMR 4QA000029). A DMRcan be issued for a part as a result of incoming inspection rejection, defective parts in stock,defective parts found during assembly process, or return from customer.4.6.3 <strong>Supplier</strong> shall communicate with OTTO’s applicable Buyer to determine immediate containmentaction. Containment action may consist of issuing a return material authorization (RMA),replacement shipment, review of inventory, etc.4.6.4 OTTO requires that the Corrective Action be returned within 7 business days as specified on thereport. If at all possible, Corrective Action should be received and implemented prior to receiptof the next shipment.4.6.4.1 The Corrective Action response should include the Root Cause section to containresults of the investigation into what specifically caused the non-conformingcondition, as well as, the reasons why the quality system did not prevent the conditionfrom occurring and being detected.4.6.4.2 The Corrective Action section to include the immediate action steps that have beentaken as well as the short-term fixes that will be used until a permanent solution canbe implemented.4.6.4.3 The Preventive/Permanent Corrective Action section includes sufficient detail tocover the activities taken to prevent recurrence of the problem identified. Thereshould also be audit performed by the supplier that the preventive action is fullyimplemented and effective.4.6.5 If there is any question with Failure Analysis and Corrective Action the <strong>Supplier</strong> will becontacted.9 of 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!