3.4.3.3 Red supplier: a supplier with a rating less than 80% is a “red” supplier. Redsuppliers are required to provide corrective action within 30 days that details a planto improve respective scores within 6 months and/or 5 lots to improve their rating toyellow or above. If not improved within the designated time frame, they may not bequalified for new business and existing business will be resourced. Any A, B, and Csupplier with a red classification will be notified by the Materials group.3.4.4 Yellow suppliers will be notified by “Yellow <strong>Supplier</strong> Notice” (ref.5.3.2 4PU000008 and Red<strong>Supplier</strong> will be notified by “Red <strong>Supplier</strong> Notice” (ref 5.3.3 4PU000009 and Green <strong>Supplier</strong>will be notified by “Green <strong>Supplier</strong> Notice” (ref.5.3.4 4PU000010)Section 4: <strong>Supplier</strong> <strong>Quality</strong> System Requirements4.1 Manufacturing Requirements4.1.1 In order to ensure manufacturing control, the supplier shall establish and document processspecifications for all aspects of the manufacturing operation based on requirements as stated inparagraph 1.3.1.4.1.2 The supplier shall have procedures for the positive identification and control of all components,including raw materials, used during manufacturing, processing, and delivery so that in the eventof a recall, traceability to raw materials and processing can be ascertained.4.1.3 The supplier shall establish procedures for the verification, storage, maintenance, and accountingof OTTO owned material, products, tools, and equipment provided to the supplier for use inproducing product for OTTO.4.1.4 Any items that are lost, damaged, or unusable, shall immediately be reported to the OTTOapplicable Buyer.4.2 <strong>Quality</strong> Requirements4.2.1 The supplier is responsible for ensuring that all items regardless if made by the supplier or asubcontractor, meet the OTTO requirements for form, fit, function and acceptance criteria.4.2.2 Inspection standards for evaluation of the manufactured product based on drawing andengineering specifications shall be established and documented.4.2.3 Acceptable <strong>Quality</strong> Levels (AQL’s) must be set by the supplier to ensure acceptable productquality levels are maintained.4.2.4 The supplier shall have established procedure for product appearance requirements. Producedproduct should be free of contamination, discoloration, peeling or blistered plating, colorvariation, nicks, scratches or scuff marks, uneven paint mask line, color contamination, coldshot, flash, weld or knit line, texture variation.4.2.5 Visual inspection shall be performed with normal or corrected to 20/20 vision. Magnificationwill not be employed. Unless otherwise specified, lighting for the determination of cosmeticflaws will be Cool White fluorescent with an intensity of approximately 4 seconds at a distanceof approximately 18 inches. <strong>Manual</strong> rotation of the parts, to change the reflection or viewingangle is allowed. If applicable, visual standards can be used with prior OTTO <strong>Quality</strong>department approval.4.2.5.1 By OTTO request “Golden Samples” will be created on those items which need aphysical example to further aide in future lot inspection.4.3 Production Part Approval Process4.3.1 When required OTTO will request level 3 PPAP as the default for all submissions in accordancewith AIAG, unless otherwise specified.4.3.2 Production Part Approval Process (PPAP) defines generic requirements for production partapproval. The purpose of PPAP is to determine if all OTTO engineering design record andspecification requirements are properly understood by the supplier and that the process has the4 of 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!