13.07.2015 Views

I{ELLENIC REPTJBLIC MIMSTRY FOR TIIE ET\TVIRONMENT ...

I{ELLENIC REPTJBLIC MIMSTRY FOR TIIE ET\TVIRONMENT ...

I{ELLENIC REPTJBLIC MIMSTRY FOR TIIE ET\TVIRONMENT ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MP.EIA/1998/4Annexpage llTable 1<strong>FOR</strong>MAT <strong>FOR</strong>NOTIFICATION LTNDER ARTICLE 3 OFTHE ECE CONVENTION ON ENVIRONMENTAL IMPACTIN A TRANSBOUNDARY CONTEXTNOTIFICATION TO AN AFFECTED PARTY OF A PROPOSED ACTIVITYUNDER ARTICLE 3 OF THE CONVENTIONT. TNPONVATION ON THE PROPOSED ACTIVITY6 Infor-atio. on the nature of the nr9q911! :gtivityType of activity ProPosedConstruction and operation of the natural gasInterconnector Greece - Bulgaria (IGB) berweenKomotiniinGreecea!4!!3l9..2,3g91*9*B--glgaria'The present notification concerns the Greek part,i.e. ftre section between Komotini area and theGreek-Bulgarian borders.The relevant section comprises mainly thefollowing infr astructure :-a pipeline, with an approximate length of 30 km,-the gas Metering Station, at the starting point int

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!