13.07.2015 Views

I{ELLENIC REPTJBLIC MIMSTRY FOR TIIE ET\TVIRONMENT ...

I{ELLENIC REPTJBLIC MIMSTRY FOR TIIE ET\TVIRONMENT ...

I{ELLENIC REPTJBLIC MIMSTRY FOR TIIE ET\TVIRONMENT ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Expected environmental impacts of proposedactivity(e.g. types, locations, magnitudes)During construction-installation works, the levelof noise is expected to be temporary increased,due to the activities of construction machineryand workers. The operation ofconstructionmachinery is expected to lead to increase of theconcentration of COz in the atmosphere. It is alsoexpected that limited discharge at specifiedsuitable points of used lubricating oils will takeplace.During the construction of the IGB, constructioncorridors will have an expected width of 22m.In the above mentioned are4 the vegetation shallbe temporarily cleared. Following the pipelineinStallation, the reinstatement of the area will takeplace. In azone 5m wide from each side of thepipeline axis, no deep root plants will be allowed.The impact of the construction to the flora isconsidered as not significant, local andpelmanent.Due to the significant volume of ground worksnecessary for the gas pipeline bedding, themechanical effect on soils is the most significantone compared to all the other effects. The impacton soils could be assessedsignificant, local (atconsffuction site), short-term during construction,possible to reclaim and without cumulative effect.Inputs (e.g. raw material, power sources, etc.)During implementation of construction, smallquantities of concrete shall be incorporated. Thenecessary electric energy for welding and otherworks will be provided by mobile dieselgenerators. In general, water will not be used forthe pipeline construction and installation works.Water will be necessary for the performance ofthe hydraulic testing of the pipeline, followingwhich, the water will be discharged in the nearestwater basin.Outputs(e.g. amounts and types of: emissions intothe atmosphere, discharges into the water system,solid waste)During construction of the IGB, the followingtypes of emissions are expected:-dust- during construction works (mainly fromearth digging and reinstating works along thepipeline route and the at the stations)- "nonorganizedsource"-emissions from the engines of constructionmachinery, construction processes andtransportation of raw and other materials,equipment and staff.During construction, transmission pipelines arestress tested (hydrotested) according to standardsEN 1594, EN 12186, EN 12327. Duringhvdrotestins. water does not chanse its volume.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!