new research projects from the Fish Disease TWG Five-Year Work Plan(pp. 140-142).Natural Propagation: A total of 31 ongoing habitat <strong>and</strong> tributary passageprojects in Section 703(c)(l) of the Program will continue or be completedin FY 1991 (pp. 51-71). These projects, located throughout Oregon, Idaho,<strong>and</strong> Washington, emphasize enhancement of anadromous <strong>fish</strong> spawning <strong>and</strong>rearing habitat <strong>and</strong> improvement of passage conditions, with the goal ofincreasing production of naturally spawning stocks. Three new habitatenhancement-related projects (pp. 49-50) are described in the AIWP.Supplementation: Three ongoing supplementation research projects from theSupplementation TWG Five-Year Work Plan will continue in FY 1991(pp. 151-152). Three additional research projects may start in FY 1991(pp. 153-154). The goal of supplementation research is to improve<strong>program</strong>s for supplementing natural production areas with stocked <strong>fish</strong>,whether from hatchery or wild stocks, <strong>and</strong> to assess the potential ofsupplementation to increase natural production.Resident Fish: The resident <strong>fish</strong> projects begun in FY 1990 or before(pp. 171-206) will continue, as will the sturgeon studies being carriedout throughout the Basin (p. 193). Three new projects are planned foraddition to the resident <strong>fish</strong> <strong>program</strong> during FY 1991 (pp. 188 <strong>and</strong> 266).Wildlife: In FY 1991, the emphasis will shift from planning to actualmitigation projects. A "placeholder" project for <strong>wildlife</strong> mitigation inOregon, Washington, <strong>and</strong> Idaho has been included in the AIWP (p. 239).Upon development of priority mitigation objectives by the Council, theWildlife Scoping Group is expected to develop specific projects. BPA willcomplete <strong>wildlife</strong> loss assessments for Federal Columbia River Power System(FCRPS) facilities (pp. 213-214) <strong>and</strong> will continue funding mitigationplans (p. 222). Wildlife mitigation efforts for Libby <strong>and</strong> Hungry Horsedams in Montana will continue (pp. 224-233>, along with implementation ofa long-term mitigation agreement for these facilities (p. 244).Major Projects: This category includes major hatchery construction,passaqe improvement, <strong>and</strong> habitat enhancement projects implemented by BPA'sFish <strong>and</strong> Wildlife Project Management Branch. During FY 1991, constructionof the Galbraith Springs kokanee hatchery on Lake Roosevelt will becompleted (p. 176). Development of the Master Plan for the artificialproduction facility or facilities to be located in northeastern Oregon(p. 98) will continue. Construction of the Umatilla Hatchery (p. 102),preliminary design of the Nez Perce Low-Capital Propagation Facilities(p. 106>, <strong>and</strong> operation <strong>and</strong> maintenance of the Colville Hatchery (p. 172)will continue. New FY 1991 projects include the final design of theYakima Hatchery (p. 96>, six other tasks associated with theYakima/Klickitat production project (pp. 95-961, <strong>and</strong> a Umatilla Hatcherysatellite siting study (p. 103).Planning Activities: The IPP will continue to guide BPA's Programimplementation in FY 1991 (pp. 23-24), <strong>and</strong> BPA will continue toparticipate in the seven IPP Scoping Groups. BPA will also participate inii


the Council-managed System <strong>and</strong> Sub<strong>basin</strong> Planning <strong>and</strong> System Monitoring <strong>and</strong>Evaluation <strong>program</strong>s (pp. 25-26).iii


1987Proqram4.6.14.14.14.15.14.16.1-4.16.24.17.14.17.24.17.34.17.4Deleted4.17.5EVALUATE NON-STRUCTURAL WATER MEASURES IN UMAT :LLA . .BASIN(Develop Work plan; Report to Council in April 1989)TEMPORARY JOHN DAY ACCLIMATION FACILITY . . . . . . .(Upon Council Approval, Complete Constructionby Spring 1988)DESIGN AND CONSTRUCTION OF YAKIMA HATCHERY . . . . .(Upon Council Approval, Fund Beginning inFY 1988)NORTHEASTERN OREGON SPRING CHINOOKOUTPLANTING FACILITY . . . . . . . . . . . . . . . .(Fund Development of Master Plan in FY 1988 orEarlier>(Upon Council Approval, Fund Design <strong>and</strong>Construction)JUVENILE RELEASE/ADULT COLLECTION AND HOLDINGFACILITIES ON UMATILLA RESERVATION . . . . . . . . . .(Operate, Maintain)EXPANDED UMATILLA HATCHERY . . . . . . . . . . . . . .(Fund upon Council Approval)LOW-CAPITAL PRODUCTION FACILITY ON NEZ PERCERESERVATION(Design/Begin Construction'by May i989;)' ' ' ' ' ' - 'HABITAT SURVEY ASSOCIATED WITH ACTIONITEM 4.17.3 (Fund> . . . . . . . . . . . . . . . . . .IMPROVED HATCHERY EFFECTIVENESS . . . . . . . . . . . .WILLAMETTE BASIN STUDY PLAN . . . . . . . . . . . . . .(Fund; Coordinate with Supplementation WorkPlan>Page. . 85. . 87. . 89. . 97. . . 99. . . 101. . . 105. . . 107. . . 109. . . 1134.17.6PROPAGATION OF SALMON/STEELHEAD IN PELTON DAMFISH LADDER . . . . . .(Fund upon Council'Approvai of-Master Plan>. . . .. . . 1154.21HATCHERY RELEASES IN UPPER COLUMBIA . . . . .(Upon Council Review of Re<strong>program</strong>ming Plan,Fund Releases). . . .. . . 1175.1KNOWN STOCK FISHERIES FIVE-YEAR DEMONSTRATIONPROGRAM . . . . . . . . . . . . . . . . . .(Co-Fund to Test Electrophoresis: Begin 1985Ocean Fishing Season or Subsequent Seasons). . . .. . . 119vi


1987Program8.4 LIBBY DAM MITIGATION . . . . . . . . . . . . . . . .(Begin Advanced Design'for'White-Tailed DeerMule Deer, Columbia Sharp-Tailed Grouse, <strong>and</strong>Waterfowl Projects; Continue Implementation<strong>and</strong> Monitoring of Bighorn Sheep Project: 1987)Page2258.5LIBBY DAM MITIGATION . . wate;fowi,. . . . . f . . 225(Continue Advanced Design for Deer:Grouse Projects; Begin Implementation <strong>and</strong>Monitoring for Mule Deer Project; ContinueImplementation <strong>and</strong> Monitoring of BighornSheep Project: 1988)8.6LIBBY DAM MITIGATION . . . . . . . . . . . . . . . . .(Begin Implementation <strong>and</strong> Monitoring forWhite-Tailed Deer <strong>and</strong> Waterfowl Projects;Begin Acquisition of Easements for Grouse;Continue Implementation <strong>and</strong> Monitoring ofMule Deer <strong>and</strong> Bighorn Sheep Projects: 1989)2258.7LIBBY DAM MITIGATION . . . . . . . . . . . . . . . . . . . . 225(Continue Implementation <strong>and</strong> Monitoring forWhite-Tailed Deer, Mule Deer, Bighorn Sheep,<strong>and</strong> Waterfowl Projects; Continue Acquisitionof Easements for Grouse: 1990, 1991)8.88.98.10HUNGRY HORSE DAM MITIGATION .(Begin Advanced Design/Begin to implement . * ' ' * * ' * ' *Elk/Mule Deer Project; Begin Advanced Design,Interagency Coordination, Site Prioritization,<strong>and</strong> Appraisals for Black Bear/Grizzly Bear,Waterfowl, Terrestrial Furbearer Projects: 1987)HUNGRY HORSE DAM MITIGATION .(Continue Advanced Design Waterfowl,'Terrestrial' ' ' * * ' .Furbearer, Black Bear/Grizzly Bear Projects;Continue Implementation/Monitoring of Elk/MuleDeer Project: 1988)HUNGRY HORSE DAM MITIGATION .(Begin/Continue Implementation'of Waterfowi,' * ' * * * ' ' *Elk/Mule Deer, Black Bear/Grizzly BearProjects: 1989-1991)2312312318.118.12PUBLIC INVOLVEMENT ON MITIGATION PLANS . . . . . . . . . . . 235(Fund Public Involvement ActivitiesConcerning Mitigation Plans>FUND IMPLEMENTATION OF MITIGATION PRIORITIES . . . . . . . . 237(Fund Implementation of Mitigation Priorities<strong>and</strong> Plans Approved by the Council>ix


1987ProgramPage8.13 DEVELOP MONITORING AND EVALUATION PROGRAM . . . . . . . . . . 241(Develop in Consultation with the Council,the Fish <strong>and</strong> Wildlife Agencies <strong>and</strong> Tribes,<strong>and</strong> Others a Monitoring <strong>and</strong> Evaluation Program>------ INNOVATIVE FUNDING OF HUNGRY HORSE/LIBBYMITIGATION . . . . . . . . . . . . . . . . . . . . . . . . . 243(Fund the Montana Wildlife Trust)FUTURE HYDROELECTRIC DEVELOPMENT ACTION ITEMS AND TECHNICAL SUBJECTS9.1 APPLICATION OF PROGRAM SECTIONS 1204(a), (b),(c),AND (e> TO NEW PROJECTS . . . . . . . . . . . . . . . . 2479.3 ASSESSMENT OF CUMULATIVE EFFECTS(Complete Study; Develop Methods: June.1987 ' .. . . . . . . 2499.4 TURBINE INTAKE SCREENS . . . . . . . . . . . . . . . . . . . 251(Develop New Designs, Complete Tests, Reportto Council: January 1989)WORK AND EXPENDITURE PLAN ACTION ITEMSlO.l-10.3EXPENDITURE AND OBLIGATION PLANS(Submit to Council by September 15'0; Each'Year; Update <strong>and</strong> Submit InformationQuarterly; Submit Review of Previous Year;Report Expenditures by Measure)........ 255PROGRAM-RELATED, NON-MEASURE PROJECTS---- PROGRAM-RELATED PROJECTS . . . . . . . . . . ........ 259VII. NON-ACTION ITEM PROJECTS . . . . . . . . . . . . . . . . . . 265VIII. NON-PROGRAM, INTERNAL SUPPORT PROJECTS . . . . . . . . . . . 267IX.APPENDIXLetters of‘comment'on the Draft FY.1991 AIWP: ' * ' * ' ' *. A-l


General1, INTRODUCTIONThe Columbia River Basin Fish <strong>and</strong> Wildlife Program (Program) was developed bythe Northwest Power Planning Council (Council> in accordance with PublicLaw 96-501, the Pacific Northwest Electric Power Planning <strong>and</strong> Conservation Act(Act>. The purpose of the Program is to guide the Bonneville PowerAdministration (BPA> <strong>and</strong> other Federal agencies in carrying out theirresponsibilities to protect, mitigate, <strong>and</strong> enhance <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> of theColumbia River Basin. The Act explicitly gives BPA the authority <strong>and</strong>responsibility to use the BPA fund for these ends, to the extent that <strong>fish</strong> <strong>and</strong><strong>wildlife</strong> are affected by the development <strong>and</strong> operation of hydroelectricgeneration in the Columbia River Basin. The Columbia River Basin Fish <strong>and</strong>Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draftplans for implementing the Program during Fiscal Year (FY) 1991.The AIWP reflects the primary goals of the Council's Action Plan (Section 140(of the Program>: to provide a solid, timely, <strong>and</strong> focused basis for budgeting<strong>and</strong> planning. In addition, the AIWP provides a means to judge the progress<strong>and</strong> the success of Program implementation. The AIWP is based on the outlinedeveloped by the Policy Review Group (PRG) during Step 1 of the <strong>annual</strong> cycleof the Implementation Planning Process (IPP>, which is described in SectionIII.This AIWP has been organized <strong>and</strong> written to meet the specific needs of ProgramAction Items 10.1-10.3. The AIWP includes schedules with key milestones forFY 1991 <strong>and</strong> beyond, <strong>and</strong> addresses the Action Items assigned to BPA in Section1400 of the 1987 Program <strong>and</strong> in subsequent amendments.All Program projects discussed in the AIWP are listed in Tables 1 <strong>and</strong> 2according to their status as of September 1, 1990. Table 1 (pp. 3-14) listscompleted, ongoing, <strong>and</strong> deferred projects. Table 2 (pp. 15-17) lists FY 1991new-start projects. "Ongoing" status indicates that the project started in FY1990 or before <strong>and</strong> that it is expected to continue through part or all of FY1991. "Deferred" means that BPA implementation has been postponed to FY 1992or later. "Completed" indicates completion during FY 1990. "New" denotesprojects planned for BPA implementation in FY 1991. However, several of thesenew projects were still under review by the Policy Review Group as the FY 1991AIWP went to press. The new projects still under review have been noted inTable 2 <strong>and</strong> in the text of the AIWP.A number of projects are expected to begin in late FY 1990 <strong>and</strong> have beenlisted in Table 1 of the Draft AIWP as "Projected FY '90 Starts," based ontheir projected start dates. Several other projects are expected to end inlate FY 1990. These projects have been listed in Table 1 as "Projected FY '90Completions," based on their projected completion dates.Section VIII describes BPA's non-Program, internal support projects. Theseprojects were not subject to review by the PRG <strong>and</strong> have been included in theAIWP to help the PRG <strong>and</strong> the public to better underst<strong>and</strong> what BPA is doing.1


FY 1991 AIWPThe AIWP continues to focus on individual Program Action Items. Each ActionItem entry is accompanied by the relevant Program measure language (orabstract>, a statement of BPA's objectives in implementing the Action Item, adiscussion of background <strong>and</strong> progress to date, <strong>and</strong> a summary of implementationplans for FY 1991 to accomplish the Action Item.The AIWP also presents plans for individual project implementation. Projectlevel reporting has been condensed to tabular form wherever possible. Tablesare subdivided into:I. Completed ProjectsII.III.IV.FY 1990 Ongoing ProjectsDeferred Projects (if applicable>New ProjectsWithin each of these four categories, appropriate information is provided,e.g., Project Number, Project Title, Date Completed, Results/Conclusions,Project Status, Schedule <strong>and</strong> Milestones, Anticipated Start Date, Reason forDeferral, <strong>and</strong> Project Officer.Abbreviations UsedThe AIWP uses many abbreviations to identify various agencies, organizations,<strong>and</strong> technical terms. Table 3 (pp. 19-20) lists the full name of each group,or the technical term, <strong>and</strong> the corresponding abbreviation used in the AIWP.2


TABLE 1. ONGOING, DEFERRED, AND COMPLETED PROGRAM PROJECTSPROJECT STATUS DEFINITIONS:ONGOING qBPA is currently implementing project, i.e., there is a signed agreement, <strong>and</strong> project is expected to continue intoFY 91.PROJECTEDFY 90 START = Project was in FY 90 AIWP as a NEW FY 90 Project; there is no signed agreement yet, but BPA expects to startimplementing project in FY 90.DEFERRED = Project was in FY 90 AIWP; BPA implementation has been postponed to a future fiscal year beyond FY 91.COMPLETED qProject completed in FY 90. (Projects completed before FY 90 are not listed in the FY 91 AIWP.)PROJECTEDCOMPLETION = Project is expected to be completed in FY 90.


TABLE 1FY 1991 'rlORK PLAN PROJECTSONGOING. DEFERRED, AND COMPLETED PROJECTSACTIOFI TECHNICAL PROJECTITEM SUBJECT NUMBER STATUS TITLE1 WATER BUDGET 87-127 ONGOING SMOLT MONITORING AND WATER BUDGET PROGRAMMANAGEMENT 83-b ONGOING OPERATION/MAINTENANCE OF BPA FISH TAGGING TRAILER2 SMOLTMONITORING83-323 ONGOING SMOLT MONITORING/WATER BUDGET84-14 ONGOING SMOLT MONITORING/WATER BUDGET87-401 ONGOING SMOLT SURVIVAL AND TRAVEL TIME31 CONDUIT DESIGN NONEd1 ELLENSBURGSCREENS87-47 COMPLETED ELLENSBURG SCREENS CONSTRUCTION2 HABITAT ANDDASSAGE IMPROVEMENT PROJECTSal-108 ONGOING83-7 ONGOING83-359 ONGOING83-415 ONGOING83-436 ONGOING84-5 ONGOING84-6 ONGOING84-8 ONGOING84-9 ONGOING84-11 ONGOING84-21 ONGOING84-22 ONGOING84-23 ONGOING84-24 ONGOINGWARM SPRINGS HABITAT IMPROVEMENTIDAHO HABITAT EVALUATION/IMPROVEMENT PROJECTSSALMON RIVER HABITAT ENHANCEMENTALTURAS LAKETHREE MILE DAM PASSAGE IMPROVEMENTSCLEARWATER RIVER SUBBASINCLEARWATER HABITAT ENHANCEMENTJOHN DAY RIVER SUBBASINGRANDE RONDE RIVER SUBBASINWILLAMETTE/CLACKAMAS RIVER SUBBASINMAINSTEM, MIDDLE FORK, JOHN DAY RIVERMIDDLE FORK & TRIBUTARIES, JOHN DAY RIVERCAMAS CREEK, IDAHOMARSH, ELK, UPPER SALMON RIVER, IDAHO


TABLE 1 (cont.)FY 1991 WORK PLAN PROJECTSDNGOING. DEFERRED. AND COMPLETED PROJECTSACTIONITEMTECHNICALSUBJECTPROJECTNUMBER STATUS TITLE4.2 HABITAT AND 84-25PASSAGE IMPROVE- 84-62MENT 85-7 1(cont.)86-7586-7986-12487-T 0087-100-l87-l 00-Z87-10487-104-l87-l 04-287-11287-41687-416-l88-2288-11689-24-lONGOINGONGOINGONGOINGONGOINGONGOINGONGOINGONGOINGONGOINGONGOINGONGOINGONGOINGONGOINGDEFERREDONGOINGONGOINGONGOINGONGOINGONGOINGGRAND RONDE HABITAT IMPROVEMENT PROJECTTROUT CREEK HABITAT IMPROVEMENTSOUTH FORK JOHN DAY RIVER & IZEE FALLS FEASIBILITYSTUDYLITTLE NACHES RIVER PASSAGEFIFTEENMLLE CREEK BASIN HABITAT IMPROVEMENTLITTLE FALL CREEK PASSAGE FACILITIES MAINTENANCEUMATILLA HABITAT IMPROVEMENT - USFSUMATILLA HABITAT IMPROVEMENT - CTUIRUMATILLA HABITAT IMPROVEMENT - ODFWPASSAGE IMPROVEMENTS AT WESTLAND DIVERSIONPASSAGE IMPROVEMENTS AT STANFIELD DIVERSIONWESTLAND NON-FISH IMPROVEMENTSOROFINO CREEK PASSAGEMAXWELL DIVERSION IMPROVEMENTCOLD SPRINGS DIVERSION IMPROVEMENTUMATILLA BASIN TRAP AND HAULTROUT CREEK 0 & MUMATILLA BASIN PASSAGE FACILITY EVALUATION4.3 ROZA NONE4.4 PROSSER NONE4.5 YAKIMA PASSAGE 85-62 ONGOING86-112 COMPLETED89-90 ONGOINGPASSAGE IMPROVEMENT EVALUATIONTOPPENISH/WESTSIDE/ELLENSBURG SCREEN FABRICATIONYAKIMA PASSAGE PHASE 2 SCREENS PREDESIGN


TABLE 1 (cont.)FY 1991 WORK PLAN PROJECTSONGOING, DEFERRED. AND COMPLETED PROJECTSACTIONITEMTECHNICALSUBJECTPROJECTNUMBER STATUS TITLF4.6 UMATILLA RIVERWATER EXCHANGE89-27PROJECTED FY 90 STARTPROVIDE POWER FOR USBR COLUMBIA RIVER PUMPS4.6.1 UMATILLANONENON-STRUCTURALWATER MEASURES4.14.1 JOHN DAY83-313ONGOINGNET PEN REARING OF FALL CHINOOK SALMONACCLIMATION4.15.1 YAKIMA HATCHERY(Tasks)86-45 ONGOINGaa-115ONGOING88-120 ONGOING88-123 ONGOING88-149 COMPLETED88-167 COMPLETED89-42 COMPLETED89-43 COMPLETED89-82 ONGOING89-83 ONGOING89-89 ONGOING89-100 ONGOING89-105 ONGOING90-58 ONGOING90-65 ONGOINGYAKIMA HATCHERY - CLE ELUM PROJECTYAKIMA/KLICKITAT HATCHERY DESIGN AND CONSTRUCTIONYAKIMA AND KLICKITAT NATURAL/ARTIFICIAL PRODUCTION PROGRAMYAKIMA HATCHERY COORDINATION - ROZAYAKIMA HATCHERY WATER ANALYSISYAKIMA HATCHERY ECONOMIC STUDYKLICKITAT HATCHERY PRE-ENGINEERINGYAKIMA HATCHERY PRE-ENGINEERINGYAKIMA HATCHERY EXPERIMENTAL DESIGN-WDFYAKIMA HATCHERY EXPERIMENTAL DESIGN-WOWYAKIMA/KLICKITAT RADIOTELEMETRY STUDYTECHNICAL WRITERSPECIES INTERACTION STUDYPROJECT LEADER FUNCTIONJUVENILE MONITORING TRAP CALIBRATION


TABLE 1 (cont.)FY 1991 WORK PLAN PROJECTSQNGOING. DEFERRED. AND COMPLETFD PROJECTSACTION TECHNICAL PROJECTITEM SUBJECT NUMBER STATUS TITLE4.16.1- NORTHEAST OREGONaa-53ONGOINGNORTHEASTERN OREGON ARTIFICIAL PRODUCTION FACILITIES4.16.2 SPRING CHINOOK4.17.1 UMATILLA RELEASEAND COLLECTION83-435 ONGOINGMINTHORN AND BONIFER SPRINGS ACCLIMATION FACILITIES4.17.2UMATILLA84-33 ONGOINGUMATILLA HATCHERYHATCHERY84-33-3 PROJECTED COMPLETIONUMATILLA HATCHERY TRIBAL FISH CULTURE TRAINING87-415 COMPLETEDUMATILLA HATCHERY MASTER PLAN-J4.17.3NEZ PERCEHATCHERY83-350 ONGOING88-126 ONGOINGNEZ PERCE LOW-CAPITAL PRODUCTION FACILITIESNEZ PERCE TECHNICAL SUPPORT4.17.4CLEARWATER STUDY88-15 ONGOINGMAINSTEM CLEARWATER RIVER STUDYIMPROVED HATCHERY83-312 ONGOINGEPIDEMIOLOGY AND CONTROL OF INFECTIOUS DISEASESEFFECTIVENESS83-363 ONGOINGDEVELOPMENT OF DIETS FOR ENHANCED SURVIVAL OF SALMON(Action Item 34.23in 1984 Program)84-43 ONGOINGEVALUATION OF A SUBUNIT VACCINE AGAINST INFECTIOUSHEMATOPOIETIC NECROSIS87-403 COMPLETEDREGIONAL FISH DISEASE LABORATORY4.17.5 WILLAMETTE RIVERSPRING CHINOOKNONE


TABLE 1 (cont.)FY 1991 WORK PLAN PROJECTSQNGOING. DEFERRED. AND COMPLETED PROJECTSACTION TECHNICAL PROJECTITFM SUBJECT NUMBER STATUS TITLE4.17.6 PELTON DAM89-29ONGOINGPROPAGATION IN PELTON DAM LADDER4.21 UPPER COLUMBIANONEHATCHERY RELEASE5.1 KNOWN STOCKELECTROPHORESIS6.1 TECHNICAL WORKGROUPS87-307 ONGOING TECHNICAL WORK GROUP COORDINATION036.2 RESEARCH AREASOF EMPHASISRES MORT/WB82-382-1283-31987-413-T87-413-z86-11888-13488-14189-107ONGOINGONGOINGONGOINGONGOINGONGOINGONGOING90-77 ONGOING90-78 ONGOING(TASK ORDER 10)PROJECTED COMPLETIONONGOINGONGOINGMAGNITUDE/DYNAMICS OF PREDATOR-CAUSED MORTALITY ON JUVENILE SALMON OSPREDATION INDEX AND WAYS OF REDUCING SALMON10 LOSSES TO PREDATIONPIT TAG RESEARCHFISH SURVIVAL AND SMOLT PHYSIOLOGY/BEHAVIOR WORKSHOPSANALYSIS OF HISTORIC DATA FOR ADULT AND JUVENILE SALMONIDSFEASIBILITY OF SATISFYING MODEL ASSUMPTIONS OF THEERJRNHAM/ANDERSON FISH SURVIVAL ESTIMATION TECHNIQUEMCNARY COLLECTION EFFICIENCYUSE OF ADVANCED PHOTOPERIOD TO ACCELERATE SMOLTIFICATIONEPIDEMIOLOGICAL METHODS FOR QUANTIFYING SURVIVALRELATIONSHIPS FROM PIT TAG RELEASES OF SMOLTSDEVELOPMENT OF A SYSTEM-WIDE PREDATOR CONTROL PROGRAMSYSTEM-WIDE SIGNIFICANCE OF PREDATION ON JUVENILE SALMONIDS INCOLUMBIA AND SNAKE RIVER RESERVOIRS


TASLE 1 (cont.)FY 1991 WORK PLAN PROJECTSONGOING, DEFERRED. AN0 COMPLETED PROJECTSACTION TECHNICAL PROJECTITEM SUBJECT NUMBER STATUS TITLEFISH DISEASE 88-152 ONGOING INFECTIOUS HEMATOPOIETIC NECROSIS VIRUS RESEARCH89-31 ONGOING CONTROL OF BACTERIAL KIDNEY DISEASE89-32 ONGOING REGISTRATION OF ERYTHROMYCIN89-40 ONGOING ANALYTICAL METHODS FOR MALACHITE GREEN89-54 ONGOING RESEARCH ON ANTIFUNGAL COMPOUNDS89-81-z ONGOING ERYTHROCYTIC INCLUSION BODY SYNDROME ETIOLOGY90-61 PROJECTED FY 90 START FUNGAL INFECTIONS OF SPRING AND SUMMER CHINOOKHATCHERY EFF 86-118 COMPLETED WORKSHOP - HATCHERY EFFECTIVENESS TECHNICAL WORKING GROUP86-118(TASK ORDER 8)COMPLETED WORKSHOP - VOLITIONAL AND SERIAL RELEASES88-16088-160-z88-16389-3089-4589-4689-6589-6689-6989-81-389-81-4(TASK ORDER 9)ONGOINGPROJECTED COMPLETIONONGOINGONGOINGPROJECTED COMPLETIONONGOINGONGOING l-/ONGOING 1/ONGOING 1/ONGOINGONGOINGBID-ENGINEERING EVALUATION OF OXYGEN SUPPLEMENTATIONENGINEERING CONSULTATION/ASSISTANCE ON PROJECT 88-160EFFECTS OF CODED WIRE TAGGING ON SPRING CHINOOKEVALUATION OF PRE-RELEASE TEMPERATURE ACCLIMATIONASSESS ANADROMOUS PRODUCTION CAPACITY IN COLUMBIA BASINSPRING CHINOOK SMOLT QUALITY ASSESSMENTCWT EVALUATION OF MISSING HATCHERY GROUPS, OR/WA - USFWSCWT EVALUATION OF MISSING HATCHERY GROUPS, WA--WDFCWT EVALUATION OF MISSING HATCHERY GROUPS, OR-ODFWMODELING OPTIMIZED HATCHERY PRODUCTIONSURVEY OF RESEARCH AND RESEARCH IMPLEMENTATION11 Project will continue until current FY 90 contract expires in FY 91. FY 91 funds have been deleted from BPA's budgetas recommeded by the PRG at the August 30, 1990, PRG meeting.


TABLE 1 (cont.)FY 1991 WORK PLAN PROJECTSQN GOI G. N DEFERRED. AND COMPLETED PROJECTSACTION TECHNICAL PROJECTITEM SUBJECT NUMBER STATUS TITLESUPPLEMENTATION 88-100 PROJECTED COMPLETION89-96 ONGOING89-97 ONGOING89-98 ONGOINGANALYSIS OF PAST & PRESENT SALMON AND STEELHEAD SUPPLEMENTATIONGENETIC MONITORING AND EVALUATION PROGRAM FOR SUPPLEMENTEDPOPULATIONS OF SALMON AND STEELHEAD IN THE COLUMBIA BASINEFFECTIVENESS OF SUPPLEMENTING IMNAHA RIVER STEELHEAD WITH HATCHERYSMOLTS AND EFFECTS ON NATURAL PRODUCTION PERFORMANCE, GENETICCHARACTERISTICS, AND LIFE HISTORY CHANGESEFFECTIVENESS OF SUPPLEMENTATION STRATEGIES AND ASSESSMENT OFINTERACTIONS BETWEEN HATCHERY FISH AND NATURAL FISH IN SALMONAND CLEARWATER BASINSA 6.3 HATCHERY DATA NONE0 BASE6.4 NATURAL PRODUCTION NONEDATA BASE6.5 HIGH PRIORITYPROJECTSNONE6.10 SYSTEM MONITORING 88-108-l ONGOING COORDINATED INFORMATION SYSTEM (CIS)AND EVALUATION 88-108-2 ONGOING EPA/USGS MAPPING SYSTEM FOR CIS89-i 04 ONGOING HISTORICAL DATA BASE6.12 COORDINATION AND NONECONSULTATION7.1COLVILLE HATCHERY 85-38 ONGOING COLVILLE HATCHERY OPERATION AND MAINTENANCE7.2COEUR D’ALENE 90-44 ONGOING STREAM SURVEY, HATCHERY, HABITAT IMPROVEMENTS, AND MONITORING


TABLE 1 (cont.)FY 1991 WORK PLAN PROJECTSONGOING. DEFERRED. AND COMPLETED PROJECTSACTIONITFMTECHNICALSUBJECTPROJECTNUMBFR STATUS TIT1 E7.3KOKANEE SALMONHATCHERIES88-24-l COMPLETED88-62 ONGOINGARCHEOLOGICAL SURVEY - GALBRAITH SPRINGSKOKANEE HATCHERIES88-62-1 PROJECTED COMPLETIONHATCHERY CONSULTANT90-76 ONGOINGHATCHERY MANAGER TRAINING PROGRAM7.4 LAKE ROOSEVELT88-63 ONGOING90-18 ONGOINGLAKE ROOSEVELT MONITORING PROGRAMLAKE ROOSEVELT HABITAT IMPROVEMENT PROJECTS7.5 KOOTENAI INDIANRESERVATION88-64 ONGOINGDESIGN/CONSTRUCT/OPERATE STURGEON HATCHERYA 7.6AKOOTENAI RIVER88-65 ONGOINGASSESS IMPACTS OF WATER LEVEL FLUCTUATIONS7.7KALISPELRESERVATION88-66ASSESS FISHERY IMPROVEMENT OPTIONS IN THE PEND OREILLE RIVER7.10 FUND PROJECTS88-l 56 ONGOINGDUCK VALLEY RESIDENT FISH PROJECT7.11 MONTANA PROJECTS81-105 COMPLETEDKERR/HUNGRY HORSE EFFECTS ON FLATHEAD KOKANEE7.12 STURGEON86-50 ONGOING89-44 ONGOINGSTURGEON STATUS AND HABITAT REQUIREMENTSCOLUMBIA RIVER WHITE STURGEON STUDYPEND OREILLEHATCHERY85-339 ONGOINGKOKANEE STOCK STATUS AND EVALUATION OF CABINET GORGE HATCHERY


TABLE 1 (cont.)FY 1991 WORK PLAN PROJECTSONGOING. DEFERRED. AND COMPLETED PROJECTSACTION TECHNICAL PROJECTITEM SUBJECT NUMBER STATUS TITLE7.13KOOTENAI RIVERMATERIALS REMOVALNONE7.14DWORSHAK DAMIMPACTSASSESSMENT87-99 ONGOING DWORSHAK DAM IMPACTS ASSESSMENT/KOKANEE/LIMNOLOGY87-407 ONGOING DWORSHAK IMPACTS ASSESSMENT/RAINBOW/SMALLMOUTH BASS7.15DRAWDOWN 83-465 ONGOING HUNGRY HORSE RESERVOIR LEVELSRECOMMENDATIONS 83-467 ONGOING LIBBY RESERVOIR LEVELSMITIGATION STATUSREPORTS/CONSULTATIONSNONECONSULTATIONS AMONG AFFECTED PARTIES SHOULD BEGIN8.1LOSS STATEMENTS 88-12 COMPLETED LOWER COLUMBIA WILDLIFE MITIGATION PLANNING88-44 ONGOING WILDLIFE MITIGATION PLANNING FOR CHIEF JOSEPH DAM90-51 PROJECTED FY 90 START LOWER CLEARWATER OTTER STUDY8.2LOSS STATEMENTCONSULTATIONSNONE8.3MITIGATION PLANS88-154 COMPLETED WILDLIFE PROTECTION/ENHANCEMENT OF DWORSHAK DAM90-25 PROJECTED FY 90 START LOWER COLUMBIA WILDLIFE MITIGATION PLAN90-50 ONGOING MINIDOKA WILDLIFE MITIGATION PLAN8.4- LIBBY DAM8.7 1987-199184-38 COMPLETED URAL-TWEED BIGHORN SHEEP MITIGATION, HABITAT IMPROVEMENT84-39 COMPLETED URAL-TWEED BIGHORN SHEEP MITIGATION87-55 ONGOING NW MONTANA WILDLIFE HABITAT ENHANCEMENT88-43 ONGOING LIBBY WILDLIFE HABITAT ENHANCEMENT90-49 ONGOING LIBBY/HUNGRY HORSE WILDLIFE PROJECT


TABLE 1 (cont.)FY 1991 WORK PLAN PROJECTSONGOING. DEFERRED. AND COMPLETED PROJECTSACTION TECHNICAL PROJECTITEM SUBJECT NUMBER STATUS TITLE8.10HUNGRY HORSE 87-60 PROJECTED COMPLETION MONTANA EASEMENTS/LAND ACQUISITION1987-1991 88-l 13 ONGOING HUNGRY HORSE WILOLIFE ENHANCEMENT89-23 ONGOING MONTANA WILDLIFE HABITAT PROTECTION8.11PUBLIC INVOLVEMENT NONE8.12WILDLIFE 90-9 1 ONGOING IDAHO TIMBER RIGHTS ADVANCE DESIGN STUDYMITIGATION 90-92 ONGOING CONFORTH RANCH ADVANCE DESIGN STUDY0’8.13----MONITORING AND NONEEVALUATIONTRUST FUND 89-52 ONGOING MONTANA WILDLIFE TRUST AGREEMENT9.1CONTINUE TO APPLY PROGRAM SECTIONS 1204 (a), (b), (c), AND (e) TO ALL NEW PROJECTS.9.3CUMULATIVEEFFECTSNONE9.4DEMO - TURBINEINTAKE SCREENNONE8.8-lO.l-10.3EXPENDITURE AND OBLIGATION PLANS AND PROGRAM WORK PLANS. SCHEDULES WITH KEY MILESTONES FOR THE SU8SEQUENTFISCAL YEAR.


TABLE 1 (cont.)FY 1991 WORK PLAN PROJECTSQNGOTNG. DEFERRED. AND COMPLETED PROJECTSACTION TECHNICAL PROJECTITEM SUBJECT NUMBER STATUS TITLEPROGRAM-RELATED, 82-13NON-MEASURE 82-16PROJECTS 87-13086-1386-5487-11787-11887-11989-2090-80ONGOINGONGOINGCOMPLETEDONGOINGONGOINGONGOINGONGOINGONGOINGONGOINGONGOINGCODED-WIRE TAG RECOVERYYAKIMA RIVER SPRING CHINOOK ENHANCEMENT STUDYFREEZE-BRAND RECOVERY DATA (MCNARY DAM)FISH HEALTH MONITORING IN WASHINGTON - WDWFISH HEALTH MONITORING IN WASHINGTON - WDFFISH HEALTH MONITORING IN IDAHOFISH HEALTH MONITORING IN OREGONFISH HEALTH MONITORING - USFWSAIRLIFT FABRICATIONCOLUMBIA RIVER BASIN PIT TAG INFORMATION SYSTEM (PTAGIS)(VSb-PJSP-1518W)


TABLE 2, NEW Fy 1991 PROGRAM PROJECTS


TABLE 2FY 1991 WORK PLAN PROJECTSW PROJFCTS IN FY 1991ACTION ITEMTECHNICALPROJECTSUBJECT NUMBER TITLE2.2 SMOLT MONITORING 91-13 PIT TAG FACILITIES91-40 BONNEVILLE DAM JUVENILE FISH SAMPLING FACILITIES4.2 HABITAT AND PASSAGE 91-15 EVALUATION/DEVELOPMENT OF STREAM HABITAT IMPROVEMENTIMPROVEMENTSTRATEGIES/STANDARDS91-30 EAST FORK SALMON RIVER COMPLETION86-79-lFIFTEENMILE CREEK - PHASE IV AND V4.15.1 YAKIMA HATCHERY(Tasks)90-64 KLICKITAT RIVER MONITORING90-66 GENETIC GUIDELINE DEVELOPMENT90-67 LOWER YAKIMA RIVER SMOLT TRAP DEVELOPMENT90-68 ADULT TRAP PREDESIGN90-69 YAKIMA HATCHERY FINAL DESIGN90-71 SMOLT LOSS EVALUATION90-72 COMPUTER INFORMATION SYSTEM DEVELOPMENT4.17.2UMATILLA HATCHERY91-14 UMATILLA SATELLITE FACILITIES6.2RESEARCH AREASOF EMPHASISRES MORT/WB EFF91-17 INVESTIGATION OF FACTORS AFFECTING JUVENILE WILDSPRING CHINOOK MIGRATION ABOVE LOWER GRANITE DAM91-28 PIT-TAGGING OF WILD CHINOOK IN IDAHO AND OREGON91-29 11 EARLY LIFE HISTORY REQUIREMENTS OF SUBYEARLINGCHINOOK IN COLUMBIA BASINFISH DISEASE91-22 HATCHERY SORTING FOR 8KD91-23 ECTOPARASITE RESEARCH91-25 CERATOMYXA SHASTA CONTROL1/ As the FY 91 AIWP went to press, project was still under review by the PRG. Implementation in FY 91 is contingent uponresults of PRG review <strong>and</strong> BPA decision.


TABLE 2FY 1991 WORK PLAN PROJECTSNEW PROJECTS IN FY 1991ACTION ITEMTECHNICALPROJECTSUBJECT NUMBER TITLEFISH DISEASE 91-26 BACTERIAL COLDWATER DISEASEcont. 91-31 IHN VIRUS VACCINESUPPLEMENTATION 90-52 2/ PERFORMANCE/STOCK PRODUCTIVITY IMPACTS OF HATCHERYSUPPLEMENTATION90-53 2/ SOUTHEAST WASHINGTON SPECIES INTERACTION STUDIES90-55 2/ IMPACTS OF SUPPLEMENTATION ON STOCK PRODUCTIVITYAND PERFORMANCE IN SALMON RIVER7.10 FUND PROJECTS91-27 FEASIBILITY STUDY - HATCHERY PRODUCTION ABOVE HELLSCANYON8.12 WILDLIFE MITIGATION91-16 WILDLIFE MITIGATION (OREGON, WASHINGTON, IDAHO)z--PROGRAM-RELATED,NON-MEASUREPROJECTS90-60 BYPASS EVALUATIONSNON-ACTION ITEM PROJECTS:--- CLEARWATER RIVER 91-18 CLEARWATER RIVER TROUT STOCKING--- HUNGRY HORSE MITIGATION 91-19 HUNGRY HORSE FISHERIES LOSS MITIGATION2/ As the FY 91 AIWP went to press, project was still under review by the PRG.i 0395W)


TABLE 3. ABBREVIATIONS USED IN THE WORK PLANAbbreviationActAIWPBIABCWDBKDBLMBPABPNLCBFWAC-ECCTCISCouncilCRBCRITFCCRSPCSKTCTUIRCTWSIRcwuCYDOEEIBSELISAEPAEPRIFCRPSFDAFDTWGFONSIFYHEPHETWGICFWRUIDFGIFIMIHNIPNIPPIRBKCFSKITMAFMDFWPMEGMOAMOUComplete TitlePacific Northwest Electric Power Planning <strong>and</strong>Conservation ActAnnual Implementation Work PlanBureau of Indian AffairsBacterial Cold Water DiseaseBacterial Kidney DiseaseBureau of L<strong>and</strong> ManagementBonneville Power AdministrationBattelle Pacific Northwest LaboratoryColumbia Basin Fish <strong>and</strong> Wildlife AuthorityCost-effectivenessConfederated Colville TribesCoordinated Information SystemNorthwest Power Planning CouncilColumbia River BasinColumbia River Inter-Tribal Fish CommissionColumbia River Salmon PassageConfederated Salish-Kootenai TribesConfederated Tribes of the Umatilla IndianReservationConfederated Tribes of the Warm Springs IndianReservationCentral Washington UniversityCalendar YearDepartment of EnergyErythrocytic Inclusion Body SyndromeEnzyme-Linked Immunosorbent AssayEnvironmental Protection AgencyElectric Power Research InstituteFederal Columbia River Power SystemFood <strong>and</strong> Drug AdministrationFish Disease Technical Work GroupFinding of No Significant ImpactFiscal YearHabitat Evaluation ProcedureHatchery Effectiveness Technical Work GroupIdaho Cooperative Fish <strong>and</strong> Wildlife Research UnitIdaho Department of Fish <strong>and</strong> GameInstream Flow Incremental MethodologyInfectious Hematopoietic NecrosisInfectious Pancreatic NecrosisImplementation Planning ProcessInternal Review BudgetThous<strong>and</strong> cubic feet per secondKalispel Indian TribeMillion acre-feetMontana Department of Fish, Wildlife <strong>and</strong> ParksSystem Monitoring <strong>and</strong> Evaluation Work GroupMemor<strong>and</strong>um of AgreementMemor<strong>and</strong>um of Underst<strong>and</strong>ing1 9


IL FY 1991 BPA BUDGET ALLOCATIONThe FY 1991 AIWP reflects strengthened coordination <strong>and</strong> prioritization throughthe Implementation Planning Process (IPP). Anadromous <strong>fish</strong> will continue tobe the area of focus of the AIWP (Figure 11, with the following highlights:1) hydro system operations/downstream migration reflects increased emphasis on<strong>fish</strong> passage; 2) <strong>fish</strong> health, artificial production, <strong>and</strong> supplementationprojects will be scrutinized <strong>and</strong> implemented at a reduced level due toemphasis on production rather than research; 3) the Umatilla Hatchery shouldbe completed during the year, <strong>and</strong> activities will continue on the Yakima <strong>and</strong>Northeastern Oregon production facilities.Resident <strong>fish</strong> activities, including first year operation of the Lake Roosevelthatcheries, will continue. Most of the existing resident <strong>fish</strong> measures in theCouncil's Program will be completed by the end of FY 1991.The <strong>wildlife</strong> <strong>program</strong> will be obligated at a higher level than in the past, dueto anticipated full implementation of the FY 1990 <strong>wildlife</strong> Program amendment.Many new mitigation projects are expected to be implemented in Oregon,Washington, <strong>and</strong> Idaho following the establishment of priority mitigationobjectives by the Council. The Montana <strong>wildlife</strong> trust payment will be made,<strong>and</strong> specific projects will be implemented through the mitigation agreementwith Montana.Operation <strong>and</strong> maintenance (O&M> will continue to increase as the Fish <strong>and</strong>Wildlife Program matures, <strong>and</strong> more facilities that require O&M are constructed.21


FY 1991 FISH AND WILDLIFE PROGRAMAnnual Implementation Work PlanAnadrovFishO&Mildlife$45 mililonFishFigure 1,FY 1991 Fish <strong>and</strong> Wi Idl ife Program Budget Al location by Major Program Areas


III, IMPLEMENTATION PLANNING PROCESSBackqround: On October 19, 1988, Bonneville Power Administration (BPA) <strong>and</strong>the Columbia Basin Fish <strong>and</strong> Wildlife Authority (CBFWA) signed a letterendorsing the Implementation Planning Process (IPP). The IPP is an <strong>annual</strong>,sequential, nine-step process by which BPA, in collaboration with the CBFWA,plans its implementation of the Columbia River Basin Fish <strong>and</strong> Wildlife Program(Program). The nine steps of the IPP are:Step 1. Program Policy ReviewStep 2. Project ScopingStep 3. Draft AIWP DevelopmentStep 4. Public Review <strong>and</strong> Comment on Draft AIWPStep 5. Publication of AIWPStep 6. Project SpecificationsStep 7. Project Selection <strong>and</strong> NegotiationStep 8. Contract AwardsStep 9. Evaluation of Implementation ProgressThe IPP relies on three types of working groups to accomplish the nine steps:1) the Policy Review Group (PRG); 2) the Scientific Review Group (SRG); <strong>and</strong>3) Scoping Groups (SGs), formerly called Technical Working Groups (TWgGs>.Responsibilities: The primary role of the PRG is to provide BPA with the bestpossible guidance <strong>and</strong> recommendations, from a policy perspective, on thedirection, emphasis, <strong>and</strong> funding of Program implementation. Most of the PRG'sactivities occur during Step 1 of the IPP, Program Policy Review. The PRG iscomprised of senior-level representatives from the CBFWA, BPA, Northwest PowerPlanning Council, U.S. Army Corps of Engineers, utilities, <strong>and</strong> otherinterested parties.The SRG will provide the PRG <strong>and</strong> BPA with objective scientific/technicaladvice <strong>and</strong> recommendations related to implementation of the Program <strong>and</strong>evaluate implementation progress. Development of the <strong>annual</strong> evaluation reportduring Step 9 is the major task of the SRG. The SRG is comprised ofsenior-level scientists from the Northwest <strong>and</strong> other regions of the country.The SGs assist BPA with scoping of projects (Step 21, responding to publiccomments (Step 4), <strong>and</strong> development of project specifications (Step 6).Currently, there are seven IPP SGs: Wildlife, Resident Fish, Columbia <strong>and</strong>Snake River Flow <strong>and</strong> Passage, Artificial Propagation, Habitat, Supplementation<strong>and</strong> Genetics, <strong>and</strong> Tributary Passage. These SGs are comprised of the region'stechnical experts in specific areas of expertise. The IPP provides a processto create additional SGs if they are needed.23


BPA is responsible for developing the AIWP (Step 3), implementing the publicreview process (Step 4>, publishing the AIWP (Step 51, initiating procurementactivities (Step 6), selecting contractors (Step 7>, <strong>and</strong> awarding contracts(Step 8). BPA representatives also participate with the SGs in IPP Steps 2,4, <strong>and</strong> 6.Progress : The PRG was established in late 1988, held its initial meeting inJanuary 1989, <strong>and</strong> continues to meet as needed to accomplish IPP tasks. ThePRG prov ided BPA with funding-level recommendations on BPA's FY 1992-1993 Fish<strong>and</strong> Wildlife Program Internal Review Budget (IRB>. With the assistance of thePRG's ad hoc Work Group, the PRG developed the Outline of the Draft FY 1991AIWP. The Draft FY 1991 AIWP is based on this Outline, which represents thePRG's recommendations to BPA regarding FY 1991 Program implementation. SevenSGs were established in May 1990, <strong>and</strong> the SGs are expected to contribute tothe development of the final FY 1991 AIWP. The SRG continued to provide BPA<strong>and</strong> the PRG with objective advice on the scientific aspects of Programimplementation in FY 1991. The SRG will develop its first <strong>annual</strong> evaluationreport on Program implementation in July 1990. Because the IPP is a unique<strong>and</strong> relatively new <strong>program</strong>, BPA has conducted, <strong>and</strong> continues to conduct,educational efforts to familiarize IPP participants with their roles <strong>and</strong>responsibilities.Plans: In FY 1991, the IPP will continue to provide an opportunity for the<strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> agencies, Tribes, <strong>and</strong> other interested parties toparticipate with BPA in planning its implementation of the Program. Step 1 ofthe third <strong>annual</strong> IPP cycle, during which FY 1992 implementation will beplanned, is expected to begin in August 1990, <strong>and</strong> the prescribed 12-month IPPschedule will be followed for the first time since the inception of the IPP.The SRG's <strong>annual</strong> evaluation report is expected to provide valuable technicalrecommendations to the PRG for use in planning FY 1992 Programimplementation. The SRG <strong>and</strong> SGs will continue to meet as needed throughout FY199Copi es of the complete IPP document <strong>and</strong> the Terms of Reference for the PRG,SRG <strong>and</strong> SGs (formerly TWgGs> are available from:Publications ClerkBonneville Power AdministrationDivision of Fish <strong>and</strong> Wildlife - PJP.O. Box 3621Portl<strong>and</strong>, OR 9720824


IV, SYSTEM PLANNING ACTIVITIESBPA actively participates in two Council-managed system planning <strong>program</strong>s,System <strong>and</strong> Sub<strong>basin</strong> Planning <strong>and</strong> System Monitoring <strong>and</strong> Evaluation. These two<strong>program</strong>s will strongly influence future Program direction <strong>and</strong> will ultimatelyaffect BPA's implementation of the Program, its evaluation <strong>and</strong> monitoringefforts, <strong>and</strong> its future Fish <strong>and</strong> Wildlife Program budget levels. The currentstatus <strong>and</strong> plans of these two <strong>program</strong>s are presented below.System <strong>and</strong> Sub<strong>basin</strong> PlanningResponsibilities: The Council funds the activities of the <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong>agencies <strong>and</strong> tribes to develop an Integrated System Plan, including 31separate Sub<strong>basin</strong> Plans. The <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> agencies <strong>and</strong> tribes haveorganized committees at the system <strong>and</strong> sub<strong>basin</strong> levels for completing thistask. The system level committee, the System Planning Group (SPG>, has beenresponsible for developing the format for the plans, guiding the sub<strong>basin</strong>planners, <strong>and</strong> reviewing draft plans. The SPG will develop the IntegratedSystem Plan. The sub<strong>basin</strong> level committees have been responsible forcollecting information <strong>and</strong> developing drafts of specific Sub<strong>basin</strong> Plans. TheCouncil has organized another committee at the system level, the SystemPlanning Oversight Committee (SPOC), that has identified <strong>and</strong> is addressingmajor issues that have been <strong>and</strong> will be part of the system planning process.Progress: The Council contract with the <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> agencies <strong>and</strong> tribesthrough the Pacific States Marine Fisheries Commission calls for nine productsover the life of the planning process. Planning began in September 1987, <strong>and</strong>several products have been completed to date. These products include thepreliminary information report that contains information needed to evaluatethe production potential of the sub<strong>basin</strong>s <strong>and</strong> thereby identify realisticobjectives for production, draft Sub<strong>basin</strong> Plans above Bonneville Dam thatinclude proposed objectives for production, the preliminary system analys isreport above Bonneville Dam that analyzes the proposed objectives forconsistency, <strong>and</strong> final Sub<strong>basin</strong> Plans above Bonneville Dam that includerecommended <strong>and</strong> alternative strategies for meeting the proposed objectives.The same products have been completed for sub<strong>basin</strong>s below Bonneville Dam. Thedraft Integrated System Plan has been issued for public review, with a finalexpected in early 1991.Plans: The Integrated System Plan will recommend objectives for salmon <strong>and</strong>steelhead production in the 31 sub<strong>basin</strong>s of the Columbia River Basin. It alsowill include recommended strategies for meeting those objectives. This plan,including the 31 Sub<strong>basin</strong> Plans, will be considered for amendment into theProgram in a process that will extend into early 1992. The results of thatamendment process should provide guidance for funding activities in BPA'simplementation of the Fish <strong>and</strong> Wildlife Program in the 1990s. BPA isparticipating in the system planning process to assist in the definition ofstrategies for meeting salmon <strong>and</strong> steelhead production objectives <strong>and</strong> to helpmake the link between the planning process <strong>and</strong> implementation scheduling infiscal years beyond 1991. BPA participation in the SPG <strong>and</strong> the SPOC willcontinue on a regular monthly basis through the end of the planning process.25


System Monitoring <strong>and</strong> EvaluationResponsibilities: The Council's Monitoring <strong>and</strong> Evaluation Group (MEG> ischarged with: formulating a System Monitoring <strong>and</strong> Evaluation Program (SMEP),maintaining the System Planning Model (SPM>, integrating Sub<strong>basin</strong> Plans,recommending formats for System <strong>and</strong> Sub<strong>basin</strong> Plan reports (including habitatcapacity, genetic impacts, production, <strong>and</strong> cost of alternative strategies>,developing a Coordinated Information System (CIS), <strong>and</strong> evaluating <strong>and</strong>disseminating research results.Progress: MEG subcommittees have been formed to address: SPM maintenance,genetics, analytical methods, System Plan integration, <strong>and</strong> the CIS. Theseefforts are underway.Plans: The Council will prepare a work plan as the basis for direct BPAfunding. After the SMEP is adopted by the Council, BPA funding of MEGactivities will be formalized as a Program Action Item. MEG will focus ongaining public support for <strong>and</strong> eventual adoption of SMEP, CIS implementation,<strong>and</strong> System Plan integration.Long-Term Role: MEG functions will continue as a result of its role inmeasuring systemwide progress, monitoring compliance with Program policies,integrating system plans, maintaining the SPM, guiding development <strong>and</strong>maintenance of the CIS, <strong>and</strong> evaluating research results for application toProgram actions.26


V, FISH AND WILDLIFE DIVISION ORGANIZATION AND STAFFThe Division of Fish <strong>and</strong> Wildlife develops, coordinates, <strong>and</strong> manages BPA'sFish <strong>and</strong> Wildlife Program pursuant to the requirements of the PacificNorthwest Power Planning <strong>and</strong> Conservation Act (Act>. The Division wasreorganized under BPA's Most Efficient Organization concept in late 1987. Asa result, the functions of the Division's branches <strong>and</strong> sections wereredefined. Figure 1 contains a current organization chart for the Division.Branch <strong>and</strong> section titles <strong>and</strong> functions are as follows:Fisheries Integration BranchThis Branch reviews <strong>and</strong> analyzes proposed BPA policies <strong>program</strong>s, <strong>and</strong> plansfor their consistency with BPA's <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> obligations under the Act<strong>and</strong> recommends st<strong>and</strong>ards, criteria, policy, or procedures necessary to ensureequitable treatment of <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> in BPA's decision making process;evaluates hydroelectric operations for <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> impacts <strong>and</strong> needs <strong>and</strong>recommends balanced operations; reviews <strong>and</strong> analyzes policies, <strong>program</strong>s,plans, <strong>and</strong> legislation of external entities to determine their impact on BPA'sFish <strong>and</strong> Wildlife Program; represents <strong>and</strong> integrates the biological <strong>and</strong> Fish<strong>and</strong> Wildlife Program requirements into the development of agency policy,<strong>program</strong>s, <strong>and</strong> plans; <strong>and</strong> develops <strong>and</strong> administers research <strong>and</strong> monitoringcontracts directed at resolving <strong>fish</strong> passage problems at hydroelectricfacilities. The Branch represents BPA on the Reservoir Mortality <strong>and</strong> WaterBudget Effectiveness Technical Work Group <strong>and</strong> manages BPA's implementation ofmajor sections of the Program.Biological Planning BranchThis Branch provides biological/technical expertise to the Division forplanning for <strong>and</strong> implementing the Program. It prepares <strong>and</strong> monitors the Fish<strong>and</strong> Wildlife Program budget; develops <strong>and</strong> maintains the Division's ProgramManagement Information System (PMIS); develops <strong>annual</strong> implementation workplans; provides cost-effectiveness analysis <strong>and</strong> determination for fundingactions; develops <strong>and</strong> maintains the <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> mitigation accountingrecords; represents BPA on technical planning work groups established by theCouncil <strong>and</strong> the CBFWA; <strong>and</strong> manages BPA's implementation of major sections ofthe Program.Program Planning SectionThe Program Planning Section oversees <strong>and</strong> provides BPA's representativeto: Council TWGs addressing supplementation of wild <strong>fish</strong> with hatchery<strong>fish</strong>, System <strong>and</strong> Sub<strong>basin</strong> Planning, <strong>and</strong> System Monitoring <strong>and</strong> Evaluation.It oversees <strong>and</strong> coordinates the Implementation Planning Process <strong>and</strong>develops the Annual Implementation Work Plan. It oversees implementationof areas of the Program dealing with natural production of salmon <strong>and</strong>steelhead. It develops methods for <strong>and</strong> oversees the application ofcost-effectiveness criteria in the selection of activities to beimplemented by BPA <strong>and</strong> develops <strong>and</strong> maintains BPA's <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong>mitigation accounting records.27


FIGURE 2, ORGANIZATION CHART: DIVISION OF FISH AND WILDLIFEOFFICE OF THE DIRECTORJohn Palensky - DirectorMarcella Bateson - SecretaryBarbara Ballew - Administrative TechnicianFISHERIES INTEGRATIONBRANCH - PJIBIOLOGICAL PLANNINGBRANCH - PJSFISH AND WILDLIFE PROJECTMANAGEMENT BRANCH - PJWSteve Smith, ChiefGreg Drais, ChiefMarilyn McCoy, SecretaryChuck Roller, Program AnalystBob Beraud, ChiefDale Johnson, Fishery BiologistJeff Osborn, Fishery BiologistIu Bill Maslen, Fishery Biologist00 Pat Poe, Fishery BiologistTimothy Fisher, Fishery BiologistJim Geiselman, Environmental EngineerRobyn MacKay, Hydraulic EngineerBrett Sherer, Environmental EngineerJock Mills, Policy Development AnalystRoger Rice, Computer SpecialistChris Stoffels, Computer SpecialistTom Clune, Project Manager (YakimalJay Marcotte, Project ManagerSteve Levy, Project ManagerRick Stoots, Project ManagerJudy Woodward, Project ManagerIIProgram PlanningSection - PJSPMark Schneider, ChiefBiological ResearchSection - PJSRJerry Bouck, ChiefIIStan Detering, Industry Economist Martin Larson, Computer Specialist Robert Austin, Fishery Biologist Fred Holm, Fishery BiologistLarry Everson, Fishery Biologist Tom Vogel, Fishery Biologist Jerry Bauer, Fishery Biologist Ron Morinaka, Fishery BiologistJeff Gislason, Fish & Wildlife Robert Walker, Wildlife Biologist Donna Fuller, Procurement Assistant Alan Ruger, Fishery BiologistBiologist Joe DeHerrera, Wildlife Biologist


Bioloqical Research SectionThis Section provides biological technical expertise necessary to assistthe Division's development of the Program Annual Implementation Work Plan<strong>and</strong> <strong>annual</strong> budget planning documents <strong>and</strong> to assist in the implementationof complex major projects; serves as BPA's representative to the Council'sHatchery Effectiveness Technical Work Group (HETWG) <strong>and</strong> Fish DiseaseTechnical Work Group (FDTWG); develops scopes of work <strong>and</strong> oversees theprocurement of projects identified in the <strong>annual</strong> Work Plan; <strong>and</strong> serves asCOTR for subsequent contracts. It oversees areas of the Programaddressing artificial production (including <strong>fish</strong> health) of salmon <strong>and</strong>steelhead, resident <strong>fish</strong>, <strong>and</strong> <strong>wildlife</strong> <strong>and</strong> develops <strong>and</strong> maintains theDivision's official contract <strong>and</strong> project files.Project Management BranchThe Project Management Branch manages the implementation of <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong>development projects of the Program; provides comprehensive oversight <strong>and</strong>management of such projects appropriate to their cost, policy precedents,political sensitivity, biological complexity, <strong>and</strong> associated controversy;formulates <strong>and</strong> directs the coordination efforts both within BPA <strong>and</strong> externallywith Federal <strong>and</strong> State agencies, Tribes, utility groups, <strong>and</strong> the public todefine, develop, <strong>and</strong> implement proposals; manages the development of thecomprehensive long-term operations <strong>and</strong> maintenance agreements attendant onsuch projects; <strong>and</strong> manages <strong>and</strong> directs the allocation of financial <strong>and</strong>personnel resources necessary to implement, operate, <strong>and</strong> maintain capital <strong>and</strong>expense projects.This Work Plan refers to four different personnel titles. It is helpful forthe reader to underst<strong>and</strong> the responsibilities <strong>and</strong> authorities of thesepositions, should questions or comments arise about BPA procurement, projects,or implementation. The positions are:PROJECT MANAGERIndividual assigned working responsibility for the coordinated <strong>and</strong> timelyimplementation of one or more "major" projects within the Program. AllProject Managers are assigned to the Project Management Branch.PROJECT BIOLOGISTBiologist who serves as the lead for all biologica1 activities related to amajor project. During project implementation, the Project Biologist overseesall biological aspects of the project <strong>and</strong> provides biological i nformation tothe Project Manager.PROJECT OFFICERIndividual responsible for the management of "non-major" projects; oftenserves as the COTR for any contracts associated with the project.CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (COTR>Individual responsible to BPA's Contracting Officer for the development,29


negotiation, <strong>and</strong> management of contracts for specific goods <strong>and</strong> servicesassociated with fulfillment of Program measures.30


VI, PROGRAM PLANS BY ACTION ITEMSANADROMOUS FISH ACTION ITEMSAND TECHNICAL SUBJECTS


2.1WATER BUDGET MEASURES303(a)303(b)303(c)[Abstract] The Federal project operators <strong>and</strong> regulators shallprovide the <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> agencies <strong>and</strong> Tribes with a totalWater Budget of 78 kcfs-months (4.64 Maf). It is to be dividedinto 58 kcfs-months (3.45 Maf> at Priest Rapids Dam <strong>and</strong> 20 kcfsmonths(1.19 Maf) at Lower Granite Dam, <strong>and</strong> used during April 15through June 15.[Abstract] BPA shall fund the establishment <strong>and</strong> operation of aFish Passage Center, including funds for two Fish PassageManager positions <strong>and</strong> for technical <strong>and</strong> clerical support. Thissupport will assist the Fish Passage Managers in: 1) planning<strong>and</strong> implementing the <strong>annual</strong> smolt monitoring <strong>program</strong> called forin Section 304(d)(2); 2) developing <strong>and</strong> implementing flow <strong>and</strong>spill requests; <strong>and</strong> 3) monitoring <strong>and</strong> analyzing research resultsto assist in implementing the Water Budget <strong>and</strong> spill planning.The Fish Passage Center will function as the primary <strong>program</strong>center for housing data <strong>and</strong> information regarding juvenile <strong>fish</strong>passage.[Abstract] The Federal project operators, Fish PassageManagers, <strong>fish</strong> passage advisor, <strong>and</strong> power system operators willcoordinate system operations for the current year <strong>and</strong> developexperimental use <strong>and</strong> accounting procedures for both themid-Columbia <strong>and</strong> Snake River Water Budgets. Experimental WaterBudget procedures shall be implemented for at least water years1987 <strong>and</strong> 1988. This committee also shall evaluate alternativeWater Budget implementation procedures <strong>and</strong> report to theCouncil.ACTION ITEM ACTIVITY SUMMARY:Objectives:To provide adequate flows for <strong>fish</strong> migrations, <strong>and</strong> to insure clear<strong>and</strong> timely integration of <strong>fish</strong> requirements <strong>and</strong> hydrosystemoperational decisions.Background <strong>and</strong> Progress to Date:The Council recognized that the agencies <strong>and</strong> Tribes lacked theexpertise to work with the owners <strong>and</strong> operators of the hydrosystem.The agencies <strong>and</strong> Tribes needed such expertise to assure that theWater Budget would be considered in all phases of hydrosystemplanning <strong>and</strong> operation. The Council therefore specified that BPAfund two Fish Passage Managers, one for the Tribes <strong>and</strong> one for theagencies. BPA has funded the operation of the Fish Passage Center<strong>and</strong> the Fish Passage Data Information System since 1983.33


Plans:BPA plans to continue to fund the operation of the Fish PassageCenter, the Fish Passage Managers <strong>and</strong> support staff, <strong>and</strong> the FishPassage Data Information System to benefit the integration of <strong>fish</strong><strong>and</strong> hydrosystem operational requirements, <strong>and</strong> to provide increasedadult returns by using supplemental flows in a timely fashion.34


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES87-127 Smolt Monitoring <strong>and</strong> WaterBudget Programs - PSMFC <strong>and</strong>CRITFCDate initiated: February 1987Results/Conclusions: BPA funded theoperation of the Fish Passage CenterProiect Officer: D. Johnson <strong>and</strong> the Fish Passage Data InformationSystem in FY 1990.mectives: Fund the operationof the Fish Passage Center <strong>and</strong>provide Water Budget flows forshaping between April 15 <strong>and</strong>June 15 to reduce hydrosystemimpacts on juvenile outmigrations.(See also Action Item 2.1)1. Continuing: BPA will continue to fund theoperation of the Fish Passage Center <strong>and</strong> theFish Passage Data Information System <strong>and</strong> toprovide Water Budget flows for shaping <strong>annual</strong>ly.2. Continuing: Contractors will guide the smeltmonitoring <strong>program</strong>; they will provide an <strong>annual</strong>report by November 1 of each year <strong>and</strong> a smoltmonitoring <strong>program</strong> by Oecember 1 of each year.Smolt monitoring, as provided under the <strong>fish</strong> Spill MOA, is also conducted under Project 87-127:Smolt Monitoring/Spill Date Initiated: 1989 1. FY 1991: Continue gatewell sampling <strong>program</strong>as per terms of the MOA, or as agreed by theProiect Officer: W. Maslen Results/Conclusions: Gatewell monitor- parties.ing was conducted at Lower Monumentalgbiectives: Provide monitoring Dam for 12 hours/day (a 4 hour/day 2. Continuing: Continue gatewell samplingof juvenile salmonid out- extension over the ongoing Smolt Moni- <strong>program</strong> for the purpose of spill management,migrations at Lower Monumental toring Program). By mutual agreement of pending installation of bypass.<strong>and</strong> Ice Harbor Dams, as pro- the parties, monitoring ws not conductedvided in the Fish Spill at Ice Harbor Dam in 1990.Memor<strong>and</strong>um of Agreement (MOA),to determine smolt numbers,migration timing, <strong>and</strong> speciescomposition. This informationwill be used by the <strong>fish</strong>eryagencies <strong>and</strong> Tribes to managespill for <strong>fish</strong> passage underthe terms of the MOA.


PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES83-6 Operation <strong>and</strong> Maintenance of 1Date initiated: 9 8 3EPA Fish Marking Trailer - USFWSProiect Officer: W. MaslenQbiPctivel: Using mobile <strong>fish</strong>marking trailers, conductmarking (coded-wire tags, freezebr<strong>and</strong>, <strong>and</strong> PIT tags) of juvenilesalmonids throughout the regionfor BPA-funded projects, includingthe Columbia River BasinSmolt Monitoring Program <strong>and</strong>Yakima Basin Monitoring <strong>and</strong>Evaluation.Results/Conclusions: A total of ap-proximately 1 million <strong>fish</strong> were markedin 1990.Continuing: BPA will continue to fund markingof various <strong>fish</strong> groups for BPA-funded projects.III. NEW PROJECTSNone.


2.22.2SMOLT MONITORING PROGRAM303(d)[Abstract1 BPA shall fund an <strong>annual</strong> smolt monitoring <strong>program</strong> tobe conducted by the agencies <strong>and</strong> Tribes. The monitoring <strong>program</strong>will provide information on the migrating characteristics of thevarious salmon <strong>and</strong> steelhead stocks <strong>and</strong> will include:1. Field monitoring of smolt movement to determine thebest timing of storage releases;2. Coordination of runoff forecasts with water budgetusage <strong>and</strong> shaping;3. Continuous monitoring of runoff conditions <strong>and</strong> <strong>fish</strong>movement at Lower Granite <strong>and</strong> Priest Rapids dams toprovide information to allow changes in water budgetusage if actual runoff conditions are inconsistentwith runoff forecasts; <strong>and</strong>4. Coordination of hatchery releases with water budgetusage.ACTION ITEM ACTIVITY SUMMARY:Objectives:To determine where all major groups of migrating, juvenile hatchery<strong>and</strong> wild <strong>fish</strong> are in the hydrosystem. This information is used toimplement the Water Budget <strong>and</strong> communicate spill requests.Background <strong>and</strong> Progress to Date:Plans:Starting in the 197Os, spring flows in the Columbia River changeddramatically with the completion of major headwater storageprojects. This change helped flood control <strong>and</strong> power generation, butslowed the travel time of the outmigration. This resulted inincreased exposure to predation <strong>and</strong> increased mortality of thejuvenile salmon <strong>and</strong> steelhead. The Council sought to reduce themortality associated with the downstream migrations by increasing thespring flows. A Water Budget volume was derived from agencies' <strong>and</strong>Tribes' recommendations <strong>and</strong> was specified for the mid-Columbia <strong>and</strong>lower Snake <strong>river</strong>s. To be able to implement the Water Budgeteffectively, the smolt monitoring <strong>program</strong> has evolved to sample thedownstream juvenile migrations at numerous key locations throughoutthe hydrosystem.BPA plans to continue funding the smolt monitoring <strong>program</strong> to improvethe timely integration of the juvenile salmon <strong>and</strong> steelheadoutmigration with the operation of the hydrosystem.37


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES84-14 Monitoring of Downstream Salmon<strong>and</strong> Steelhead at FederalHydroelectric Facilities - NMFSProiect Officer: P. PoeObiectiva: To monitor theseaward migration of juvenilesalmon <strong>and</strong> steelhead atJohn Day, <strong>and</strong> Bonneville Damsas part of the Columbia RiverSmolt Monitoring Program: toprovide daily <strong>fish</strong> capture <strong>and</strong>condition data, as well as damoperations <strong>and</strong> <strong>river</strong> flow data,to the Fish Passage Center toassist in Water Budget management.Date initiated: March 1984 1. FY 1991: 1990 Annual Report availableMay 1991.Results/Conclusions: Project providedinformation that has been used by the 2. Continuing: Project will continue to beFish Passage Center as a basis for Water funded as part of the Smolt Monitoring Program.Budget requests <strong>and</strong> for Water Budget Contractor will provide <strong>annual</strong> operational reportsmanagement directed toward improving <strong>and</strong> recommend changes as needed to the smoltthe survival of juvenile salmon <strong>and</strong> monitoring schedule <strong>and</strong> facilities.steelhead migrants. Project hasprovided information on the migratingcharacteristics of the various stocksof salmon <strong>and</strong> steelhead produced in theColumbia River system. Project continuesto provide information for investigatingrelationships among flows, spill, traveltime, smolt condition, <strong>and</strong> adult production.The 1984-1989 Annual Reports are available;1990 Annual Report will be availableMay 1991.Smolt monitoring, as provided under the Fish Spill MOA, is also conducted under Project 84-14:Smolt Monitoring/Spill - NMFSProiect Officer: W. MaslenQbiectiveq: Provide monitoringof juvenile salmonid outmigrationsat John Day <strong>and</strong>The Dalles Dams, as providedin the Fish Spill Memor<strong>and</strong>umof Agreement (MOA),Date Initiated: 1989 1. FY 1991: Continue gatewell sampling<strong>program</strong> as per terms of the MOA, or as agreedResults/Conclusions: Gatewell monitoring by the parties.was conducted at the Dalles Dam for 24hours/day during the spring <strong>and</strong> summer 2. Continuing: Continue gatewell samplingoutmigrations. Hydroacoustic sampling <strong>program</strong> for the purpose of spill management,proposed by the <strong>fish</strong>ery agencies <strong>and</strong> pending installation of bypass.Tribes was not conducted, as a result ofinsufficient lead time prior to the 1990juvenile <strong>fish</strong> outmigration. Gatewell


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES84-14 to determine smelt numbers,cont. migration timing, <strong>and</strong> speciescomposition. This informationwill be used by the <strong>fish</strong>eryagencies <strong>and</strong> Tribes to managespill for <strong>fish</strong> passage underthe terms of the MOA.monitoring at John Day Dam was conductedduring the summer outmigration (no additionalmonitoring over the ongoingSmelt Monitoring Program).wCD83-323 Smolt Monitoring at the Head Date initiated: January 1983 1. FY 1991: BPA will continue to fund Projectof Lower Granite Reservoir <strong>and</strong>Lower Granite Dam - IDFG Results/Conclusions: The information83-323 activities as part of the Smolt MonitoringProgram.collected on the migrational timing <strong>and</strong>Proiect Offica: P. Poe condition of juvenile hatchery-produced 2. Continuing: Contractor will provide <strong>annual</strong><strong>and</strong> wild salmon <strong>and</strong> steelhead trout Snake reports <strong>and</strong> recommend changes as needed to theQbiectives:River stocks from 1983 through 1990 smolt monitoring schedule <strong>and</strong> facilities.1. Operate the Lewiston <strong>and</strong> has been used for in-season operationalClearwater traps from March 15to mid-July as part of theSmolt Monitoring Program forWater Budget, <strong>fish</strong> collection,<strong>and</strong> transportation managementpurposes.2. Monitor arrival time, relativepassage index, <strong>and</strong> conditionof juvenile salmon <strong>and</strong>decisions relative to Water Budget,facility power operations, <strong>and</strong> <strong>fish</strong>collection <strong>and</strong> transportation <strong>program</strong>s.The collected information is also beingused to investigate the relationshipsamong <strong>river</strong> flows, travel time, smoltsurvival <strong>and</strong> condition, <strong>and</strong> adultproduction of salmon <strong>and</strong> steelhead troutstocks produced in the Snake Riversteelhead into the head of Lower system. The 1983-1989 Annual Reports areGranite reservoir from Snake available; 1990 Annual Report will beRiver tributaries. available May 1991.3. Determine travel time forhatchery chinook, hatcherysteelhead, <strong>and</strong> wild steelheadmigrants from the head ofLower Granite Reservoir toLower Granite Dam using PITtaggedsmolts marked at thetraps as well as freeze-br<strong>and</strong>ed<strong>and</strong> PIT-tagged smolts passingthe traps from up<strong>river</strong> sites.


PROJECTNUMBER TITLE PROJECT STATUS TONFS87-401 Assessment of Smolt Condition Date initiatd: May 1987 FY 1990: BPA will continue to fundfor Travel Time Analysis - USFWSProject 87401 activities as part of theResultsKonclusiou: Results show that Smolt Monitoring Program.Praiect Officer: P. Poe level of stress, smoltification, <strong>and</strong><strong>fish</strong> health can introduce bias/errorson,Objectives: Collect information into estimates of smolt survival, <strong>and</strong> 2. Continuing: Contractor will provide <strong>annual</strong>smoltification, <strong>and</strong> pre-travel time. Measurements of parameters reports <strong>and</strong> recommend changes based on evaluationvalence of disease for markedgroups of juvenile salmon <strong>and</strong>steelhead used by the FishPassage Center in their traveltime studies as part of theSmolt Monitoring Program.Continue the development ofa smolt condition index tomonitor <strong>fish</strong> quality duringthe seaward migration for usein real-time management <strong>and</strong>evaluation.used to quantify the extent of smoltdevelopment, level of stress, <strong>and</strong> prevalenceof disease are needed to evaluatehow these biological factors are influencingexperimental design assumptionsin Columbia River mainstem passage juvenile<strong>fish</strong> migration studies. The 1987<strong>and</strong> 1988 Annual Reports are available;1989 Annual Report will be availableSeptember 1990.of results.III. NEW PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES91-40 Bonneville Dam JuvenileFish Sampling FacilitiesNew projectTo be developed by SG.Proiect Officer: TBA


PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES91-40cont.Qbiectives: To develop multipurposejuvenile <strong>fish</strong> samplingfacilities capable of providinginformation on <strong>fish</strong> condition<strong>and</strong> species composition of thegeneral population bypassing thepowerhouses, <strong>and</strong> on the timing,physiology, condition, <strong>and</strong>growth of PIT-tagged <strong>fish</strong>.91-13 PIT Tag Facilities New ProjectFY 1991: Start project.Project Officer: 12. JohnsonObiectivez: To complete finaldesign for Bonneville Dam I <strong>and</strong>II PIT tag facilities <strong>and</strong>construct the facilities. Thiswork was formerly part of Project83-319, PIT Tag Research. Aseparate contract (Project 91-13)was required for administrativereasons.


3.13.1 ALTERNATIVE CONDUIT SYSTEM FOR JUVENILE FISH(Test <strong>and</strong> Evaluate: November 15, 1987; Report January 1988)403(d)(2)Test <strong>and</strong> evaluate an alternative conduit system for efficientlyconveying juvenile <strong>fish</strong> from hydroelectric powerhouse intakes tothe tailwater. This study shall test a design with potentialfor broad application at dams where turbine intake deflectorsare in use or under consideration.ACTION ITEM ACTIVITY SUMMARY:Objectives:To test <strong>and</strong> evaluate alternative conduit systems for bypassingjuvenile salmon <strong>and</strong> steelhead around dams.Background <strong>and</strong> Progress to Date:Plans:Projects:As juvenile salmon <strong>and</strong> steelhead migrate downstream past dams, theymay be injured by pressurized conduit bypass systems used at mostdams. A past study performed by the U.S. Army Corps of Engineers(USACE) <strong>and</strong> Idaho Cooperative Fish <strong>and</strong> Wildlife Research Unit(ICFWRU) demonstrated that an open flume has potential for minimizinginjury to <strong>fish</strong>. BPA contracted with these two agencies to design <strong>and</strong>test different types of flumes to help pass <strong>fish</strong> safely around dams.The project was completed in March 1988. Results were used in thedesign of the new smolt bypass system at Little Goose Dam.Action Item 3.1 has been completed.None.43


4.14.1 ELLENSBURG TOWN DIVERSION DAM FISHWAY AND BYPASS(Design: October 1987)(Construction Completed: October 1989)803(b)(6)Bonneville shall fund the design <strong>and</strong> construction of a low flowvertical slot <strong>fish</strong>way <strong>and</strong> replacement of obsolete, inefficientjuvenile <strong>fish</strong> screening/bypass facilities at the Ellensburg TownDiversion Dam.ACTION ITEM ACTIVITY SUMMARY:Objectives:To fund construction of the Ellensburg Town Diversion Dam <strong>fish</strong>screens.Backqround <strong>and</strong> Progress to Date:Plans:BPA funded the construction of the Ellensburg Town <strong>fish</strong> screens toimprove the outmigration of juvenile salmon <strong>and</strong> steelhead from theYakima River system. BPA did not fund the proposed <strong>fish</strong>way becauseno <strong>fish</strong>way presently exists, <strong>and</strong> the Ellensburg Water Company had apre-Northwest Power Act obligation to fund <strong>fish</strong>way construction.Construction of the <strong>fish</strong> screens was completed in October 1989.Action Item has been completed.45


01% 2% “3 21‘? .r +J .r 2!I7 BzJ46


4.24.2 HABITAT AND PASSAGE IMPROVEMENT PROJECTS(Consult with Project Sponsors on Need; Complete by 1991)703(c)(l)[Abstract] BPA shall fund habitat <strong>and</strong> tributary passageprojects as provided in Action Item 4.2. Upon Council approvalof system plans provided for in Section 205, System Planning,BPA shall fund habitat <strong>and</strong> passage restoration or improvementmeasures in those plans, including those measures identified inthe plans that are listed in Appendix A Table: PlanningInventory of Enhancement Projects.ACTION ITEM ACTIVITY SUMMARY:Objectives:To consult with project sponsors to determine whether projects listedin Action Item 4.2 are needed in the immediate future; to completethem by 1991 if they are needed.Background <strong>and</strong> Progress to Date:On May 7, 1987, BPA sent a letter to all habitat <strong>and</strong> tributarypassage project sponsors to determine whether the listed projectswere needed in the immediate future. All project sponsors, exceptWashington Department of Fisheries (WDF), stated that their listedprojects were needed in the immediate future. WDF (June 2, 1987)recommended the following actions:Sub<strong>basin</strong> Project RecommendationYakima ---- Thorpe Mill Screen Hold(USBR Project)87-57 Old Reservation DelayCanal Screen86-65 Snipes/Allen Screen DelayA total of 35 habitat <strong>and</strong> tributary passage improvement projects arelisted in the AIWP, including 31 ongoing projects, one deferredproject, <strong>and</strong> three new projects. Due to the large number of projectsinvolved in the implementation of Program Measure 703(c)(l), thediversity of activities included, <strong>and</strong> BPA's continuous implementationsupport of habitat <strong>and</strong> passage projects, a table format was developed<strong>and</strong> used to review BPA implementation in the FY 1987 Work Plan. Thesame table format (Table 4) has been used'in the current AIWP forprojects started before FY 1991. New projects that start in FY 1991<strong>and</strong> future FYs will be described using the same format as is used inthe rest of the AIWP, with completed, ongoing, deferred, <strong>and</strong> newprojects described in separate tables.47


Table 4 covers research projects, evaluation projects, <strong>and</strong> habitat<strong>and</strong> passage enhancement projects. The last group is listed bysub<strong>basin</strong>, beginning with the Willamette/Clackamas River sub<strong>basin</strong> <strong>and</strong>proceeding up<strong>river</strong> to the Salmon River sub<strong>basin</strong>. Informationpresented in the Table includes: the project description, currentproject status, <strong>and</strong> contract-effective period.In FY 1987, BPA developed an Implementation Plan outline for habitat<strong>and</strong> passage enhancement projects <strong>and</strong> asked Project Leaders tocomplete Implementation Plans in FY 1988. BPA funding in FY 1988 wascontingent upon completion of plans for all ongoing <strong>and</strong> newprojects. Plans were completed for ongoing projects funded inFY 1988.These habitat <strong>and</strong> passage enhancement project Implementation Planswill improve planning <strong>and</strong> scheduling of implementation efforts <strong>and</strong>will clearly define the projects. The plans will also enable BPA toaccurately determine the funding required for completion of aproject. Each completed Implementation Plan contains:1) background information, such as specific project location,existing conditions, <strong>fish</strong>ery resources, l<strong>and</strong> use activities, <strong>and</strong>limiting factors; 2) enhancement techniques <strong>and</strong> an implementationschedule; 3) expected increase in <strong>fish</strong> production due to the project;4) methods for monitoring physical habitat changes resulting from theproject; <strong>and</strong> 5) cost of the project, including total cost <strong>and</strong> cost byfiscal year. BPA expects projects to be implemented as planned <strong>and</strong>scheduled in the Implementation Plans.Plans:BPA will continue to implement the projects listed in Action Item 4.2(If they are needed in the immediate future> <strong>and</strong> plans to completemost of them by 1991.48


I. COMPLETED PROJECTSSee Table 4.II. FY 1990 ONGOING PROJECTSSee Table 4.III. NEW PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES91-15 Evaluation/Development ofStream Habitat ImprovementStrategies/St<strong>and</strong>ardsProiect Officer: R. AustinNew ProjectFY 1991: BPA determines method of procurementfor developed SOW <strong>and</strong> initiates project;estimated completion of project is within12 to 18 months from start date.gm:1. Establish st<strong>and</strong>ardizedmethods for determining limitingfactors <strong>and</strong> for evaluating all<strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> benefitsresulting from stream-habitatimprovements.2. Determine current "stateof-the-art"in habitatimprovement <strong>and</strong> protection.3. Report critical researchneeded to improve/evaluatefuture habitat work.4. Review <strong>and</strong> evaluateselected projects to validate<strong>fish</strong> production estimates.5. Determine cost-effectivenessof stream protectionversus restoration/enhancement.


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES91-30 East Fork Salmon RiverCompletionNew ProjectFY 1991: Start project.Proiect Officer: S. LevyDbiectives: Improvehabitat for spring chinook.86-79-l Fifteenmile Creek -Phase IV - VProiect Officer:TBANew ProjectFY 1991: Begin implementationFY 1992: Complete implementation.cn0Dbiectives: Overall objectiveis to increase the productionof wild winter steelhead withinthe <strong>basin</strong>:1. Reduce lethal summer watertemperatures.2. Increase summer water flow.3. Enhance <strong>fish</strong> habitat diversitywithin the stream.4. Improve stream channelstability.5. Reduce sediment loadingthrough enhanced riparianvegetation.


Table 4:Habitat Improvement <strong>and</strong> Passage EnhancementMeasure 703(c)(l)Status ReportPROJECT11 ElNUMBER PO - PMCONTRACT TERMSTART RENEWALTITLE/OBJECT IVE PROJECT STATUS DATE DATFI. RESEARCH PROJECTSNone.II.EVALUATION AND MONITORING PROJECTS83-7 RJAEvaluation of Idaho Habitat Improvement Projects - IDFGObiective: Evaluate the juvenile chinook <strong>and</strong>steelhead production benefits of habitat <strong>and</strong> passageimprovement projects in the Clear-water <strong>and</strong> Salmon River<strong>basin</strong>s in order to produce the offsite mitigation recordfor Idaho.Field sampling in progress.Annual report completed.Project continuing.a/15/837/l/9084-11 RDSClackamas/Hood River Habitat Enhancement Program -USFS/Mt. Hood NF4/l/844/l/91Fish Creek Evaluation SubprojectObiective: To evaluate <strong>and</strong> quantify drainage-widechanges in habitat <strong>and</strong> smolt production as a result ofhabitat improvement.Monitoring <strong>and</strong> Evaluation is ongoingin FY 91.L/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM q Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECT11 uNUMBER PO - PM TITLE/OBJECTIVECONTRACT TERMSTART RENEWALPROJECT STATUS DATE DATEIII.PASSAGE AND HABITAT IMPROVEMENTWillamette RiverKlackamas River Sub<strong>basin</strong>84-11 RDS Clackamas/Hood River Habitat Enhancement - Mt. Hood NFCollawash River Falls Passage SubprojectUbiective: Construct a <strong>fish</strong>way to correct CollawashFalls passage problems. The falls prevent accessto potential spawning <strong>and</strong> rearing habitat.Jmorovement: Structure <strong>and</strong> passage10 Habitat: milesSpring Species: chinook,<strong>and</strong> cohowinter <strong>and</strong> summer steelhead,Benefit: Increase of 55,532 smolts <strong>and</strong> 2,957 adults.FY 88 activities included excavation 4/l/84of the <strong>fish</strong>way channel in the bedrockat the falls. Final implementationof improved passage was provided inFY 90 by blasting rocks to reducethe falls gradient. O&M in FY 91.4/l/91Collawash River Drainage Habitat Improvement: HotSprings Fork Subdrainages SubprojectObjective: Install instream structures to improvespawning habitat <strong>and</strong> effective cover.Imorovement: Instream structureHabitat: 10.6 milesSoecies: Winter <strong>and</strong> summer steelhead, spring chinook<strong>and</strong> coho salmonBenefit: 7,249 coho smelts; 2,616 chinook smolts; <strong>and</strong>4,229 steelhead smelts.Instream structure construction willcontinue in FY 91 along with O&M ofpast projects.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. JohnsonZ/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECT11 2/NUMBER PO - PMCONTRACT TERMSTART RENEWALTITLE/OBJECTIVE PROJECT STATUS DATE DATF84-11cont.Lake Branch/West Fork Hood River Improvement SubprojectFY 91 activities include instreamstructure <strong>and</strong> passage construction: Improve adult/juvenile <strong>fish</strong> passage <strong>and</strong> the projects <strong>and</strong> O&M of previous projects.quality of spawning <strong>and</strong> low-flow rearing habitat.Imorovement: Instream structure <strong>and</strong> passageHabitat: 10.0 milesSpecies: Summer <strong>and</strong> winter steelhead, chinookBenefit: 1,309 chinook smolts; 1,748 steelhead smolts.Fish/Wash Creek Habitat Improvement SubprojectDbiective: Improve spawning <strong>and</strong> rearing habitat forsalmon <strong>and</strong> steelhead through habitat improvementmeasures.Imorovement: Instream structure4 Habitat: milesSpecies: Spring chinook, coho, winter <strong>and</strong> summersteelhead.Benefit:1,857 steelhead smelts; 1,317 coho smolts.FY 91 activities include O&M ofpast projects.Lower Oak Grove Fork Habitat Improvement SubprojectObjective: Improve <strong>fish</strong> rearing <strong>and</strong> spawning habitatin the lower 3.8 miles of stream.Imorovement: Instream structureHabitat: 3.8 milesSpecies: Winter <strong>and</strong> summer steelhead,chinook <strong>and</strong> coho salmonBenefit: 680 steelhead smolts; 2,536 coho smolts.FY 91 activities include instreamstructure construction projects <strong>and</strong>0 & M of past projects.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECT 1,21NUMBER PO - PMCONTRACT TERMSTART RENEWALTITLE/OBJECTIVE PROJECT STATUS DATE DATE84-11cont.Fifteenmile Creek Basin Habitat Improvement SubprojectObiective: Improve adult <strong>and</strong> juvenile <strong>fish</strong> passage,spawning <strong>and</strong> rearing habitat, <strong>and</strong> water qualityconditions.Improvement: Passage <strong>and</strong> instream structureHabitat: 120 miles (30 mi USFS l<strong>and</strong>s)Species: Wild winter steelheadFY 91 activities include instreamstructure construction projects <strong>and</strong>0 & M of past projects.86-124 RDS Little Fall Creek Fish Passage - Facilities MaintenanceObjective: Provide 0 & M funding for FishPassage facilities.Improvement: Structure <strong>and</strong> passage14 Habitat: miles$a: Salmon <strong>and</strong> steelheadBenefit: Potential of adults:Steelhead adults: 543Spring chinook adults: 256A multi-year O&M agreement has been 7/22/86 g/16/92negotiated through 9115192, withFY 89 funding.Fifteenmile Creek Sub<strong>basin</strong>86-79 RDS Fifteenmile Creek Habitat Improvement - ODFWQbiective: Increase wild winter steelhead production tolevels which approximate historic maximum run sizes.Improvement: Passage <strong>and</strong> instream StructureHabitat: 120 milesSpecies: Wild winter steelheadBenefit: 11,715 smelts/yearFY 91 activities include 0 & M of 9/87past projects.10/l/90l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECTNUMBER11 21PO - PMTITLE/OBJECTIVECONTRACT TERMSTART RENEWALPROJECT STATUS DATE DATEDeschutes River Sub<strong>basin</strong>81-108 ROS Habitat Quality <strong>and</strong> Anadromous Fish Production Potentialon the Warm Springs Indian Reservation - CTWSIRQbiective: The project consists of three phases:I. Survey existing <strong>and</strong> potential <strong>fish</strong>ery resources onthe Reservation; II. Identify factors limitinganadromous <strong>fish</strong> production <strong>and</strong> design appropriateinstream or riparian enhancement measures to correctlimiting factors; <strong>and</strong> III. Implement measures <strong>and</strong>evaluate effectiveness.S&&-es: Summer steelhead <strong>and</strong> spring chinook.Phase I: completed in FY 82. g/30/81 5/l/91Phase II: completed in FY 87.Phase III: Implementation of habitatenhancement measures was completedin FY 89. Monitoring of projecteffectiveness will be completed inFY 90 with the final evaluationreport completed in FY 91. O&M ofpast projects in FY 91.Beaver Creek Habitat Improvement SubprojectDbiective: Construct instream structures to providejuvenile salmon <strong>and</strong> steelhead rearing habitat inchannelized sections of Beaver Creek. Fence riparianzone <strong>and</strong> rip-rap banks with juniper.Imorovement: Instream <strong>and</strong> riparian2 Habitat: milesSoecies: Wild spring chinook.Benefit: 6,750 spring chinook smolts.Instream structures completed in FY 86.Fencing <strong>and</strong> juniper rip-rap completedin FY 89.Mill Creek Habitat Improvement SubprojectQbiective: Construct instream structures to providejuvenile salmon <strong>and</strong> steelhead rearing habitat in thePotter's Pond section of Mill Creek. Fence riparian zone.Improvement: Instream <strong>and</strong> riparianHabitat: 1 mileSpecies: Wild spring chinook <strong>and</strong> summer steelheadBenefit: 1,020 spring chinook <strong>and</strong> 540 summer steelheadsmolts.Instream structures completed inFY 87. Fencing completed in FY 89.l/PO qZ/PM qProject Officer: RJA/R. Austin, JAB/J. Bauer, OEJ/D. JohnsonProject Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


CONTRACT TERMPROJECT11 21 START RENEWALNUMBER PO - PM TITLE/OBJECTIVE PROJECT STATUS DATE DATE81-108cont.Shitike Creek Habitat Improvement Subproject Instream structures completed inFY 89.. .rtlve: Stabilize stream channel, create a low-flowpassage channel, develop pool habitat, <strong>and</strong> provide shading.Imorovement: Instream <strong>and</strong> riparian.Habitat: 3 milesSpecies: Wild spring chinook <strong>and</strong> summer steelhead.Benefit: 3,139 spring chinook smolts <strong>and</strong> 2,642summer steelhead smolts.84-62 DEJ Trout Creek Riparian Enhancement - ODFW Construction is ongoing <strong>and</strong>expected to be completed in FY 91.objective: Construct instream <strong>and</strong> riparian structuresto provide juvenile salmon <strong>and</strong> steelhead rearing habitat<strong>and</strong> adult spawning habitat.Imorovement: Instream <strong>and</strong> riparian.Habitat: 90 milesm: Steelhead <strong>and</strong> spring chinook.Benefit: 3000 - 4000 adult steelhead.9/l/84g/30/8988-l 16 DEJ Trout Creek O&M BPA will continue funding mainte- 9/88nance of Trout Creek habitat improve-Obiective: To maintain fences <strong>and</strong> instream structures ment structures in FY 91.constructed under Project 84-62.9/90I/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECT11 21NUMBER PO - PMTITLE/OBJECTIVECONTRACT TERMSTART RENEWALPROJECT STATUS DATE DATEJohn Dav River Sub<strong>basin</strong>84-8 RDS N. Fork John Day River Habitat Enhancement -USFS/Umatilla NF4/l/844/l/91Desolation Creek SubprojectObiective: Increase the production potential of summersteelhead <strong>and</strong> spring chinook by improving pool:riffleratio, constructing adult salmon resting pools, increasingquality <strong>and</strong> quantity of spawning habitat, <strong>and</strong>controlling bank erosion.Improvement: Instream structureHabitat: 42 milesSDecies: Spring chinook, summer steelheadBenefit: Spring chinook - 4950 smoltsSummer steelhead - 2475 smoltsFY 91 activities include O&M ofprevious projects.North Fork John Day River Habitat Improvement SubprojectObjective: Increase production of spring chinookthrough side-channel modification, improve juvenilerearing area, improve bank stabilization, increaseadult resting areas, <strong>and</strong> increase amount of riparianvegetation.Imorovement: Instream structureSpecies: Spring chinookBenefit: 5,000 smolts/yrFY 91 activities include O&M ofprevious projects.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. JohnsonZ/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


CONTRACT TERMPROJECT START RENEWAL11 21NUMBER PO - PM TITLE/OBJECTIVE PROJECT STATUS DATE DATE84-8(cont.)Wall Creek System SubprojectFY 91 activities include installationof weirs, adult resting pools,Qbiective: Improve quality <strong>and</strong> quantity of juvenile streambank stabilization structures,salmonid rearing area <strong>and</strong> adult spawning area; control <strong>and</strong> riparian vegetation planting.bank erosion; increase amount of riparian vegetation. O&M is included for FY 91.Imorovement:Instream structures.7 Habitat: milesSpecies: Summer steelhead.Benefit: 2,274 summer steelhead smelts.cncoFivemile Creek SubprojectQbiective: Increase production of summer steelheadImorovement: Instream structureHabitat:Species: Summer SteelheadBenefit: 375 steelhead smeltsCamas Creek System SubprojectQbiective: Improve quality of juvenilesalmonid rearing area <strong>and</strong> adult spawining area;control bank erosion; increase amount of riparianvegetation.FY 91 activities include constructionof pool-creating structures <strong>and</strong>placement of instream boulders <strong>and</strong>woody material. O&M is includedfor FY 91.FY 91 activities include installationof weirs, adult resting pools,streambank stabilization structures,<strong>and</strong> riparian vegetation planting.O&M is included for FY 91.Imorovement: Instream structures.Habitat:16.5 milesSummer Species: steelheadBenefit: 5,362 summer steelhead smelts.l/PO q Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECT11 21NUMBER PO - PM TITLE/OBJECTIVECONTRACT TERMSTART RENEWALPROJECT STATUS DATE DATE84-8(cont.)Clear/Granite Creeks SubprojectDbiective: Increase the potential of spawning salmonthrough habitat improvement measures.Improvement: Decrease mine waste water pollution.12 Habitat: milesSoecie: Spring chinookFY 91 activities include O&M ofprevious projects.cnCD84-21 RDS Mainstem, Middle <strong>and</strong> North Fork/John Day River - ODFWMainstem John Day River SubprojectQbiective: Provide additional rearing habitat forjuvenile salmon <strong>and</strong> steelhead.Imorovement: Fencing <strong>and</strong> instream structureHabitat: 23 milesSoecies: Spring chinook <strong>and</strong>Summer steelheadBenefit: Steelhead smolt increase - 344,000;chinook smolt increase - 371,000 to 996,000FY 91 activities include construction 6/30/85of instream structures, riparianvegetation planting, <strong>and</strong> fencingfor riparian leased areas negotiatedduring FY 90. FY 91 funding of l<strong>and</strong>ownercontacts/riparian leasenegotiations for FY 92 implementationis dependent on sub<strong>basin</strong> plans <strong>and</strong>budget negotiations for FY 92. O&Mis included for FY 91.5/l/90Middle Fork John Day River SubprojectObjective: Provide additional holding areas for adultchinook <strong>and</strong> steelhead; improve rearing area forjuveniles of both species.Improvement: Fencing <strong>and</strong> instream structureHabitat: 30 milesSoecies: Spring chinook, summer steelheadBenefit: Included in benefits for the Mainstem JohnDay River.FY 91 activities include constructionof instream structures, riparianvegetation planting, <strong>and</strong> fencingfor riparian leased areas negotiatedduring FY 90. FY 91 funding of l<strong>and</strong>ownercontacts/riparian leasenegotiations for FY 92 implementationis dependent on sub<strong>basin</strong> plans <strong>and</strong>budget negotiations for FY 92. O&Mis included for FY 91.l/PO q Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. JohnsonZ/PM q Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


CONTRACT TERMPROJECT11 21 START RENEWALNUMBER PO - PM TITLE/OBJECTIVE PROJECT STATUS DATE DATE84-21 North Fork John Day River Subproject, including Fox(cont.)CreekFY 91 activities include O&M ofprevious projects.Qbj-@&e: Fox Creek - improve steelhead spawning<strong>and</strong> rearing conditions through increasing riparianvegetation, reducing erosion <strong>and</strong> sedimentation, <strong>and</strong>increasing pool areas.4mprovement: Fencing <strong>and</strong> instream structureHabitat: 42 milesSpecies: Spring chinook <strong>and</strong> steelheadBenefit: Included in benefits for the Mainstem JohnDay River.Q)0North Fork John Day River Subproject, including CamasCreekQbiectives:Provide additional rearing habitat forjuvenile steelhead.Imorovement: Fencing <strong>and</strong> instream strucure5 Habitat: milesSpecies: Summer steelheadBenefit: Included in benefitsfor the Mainstem John Day River.FY 91 activities include constructionof instream structures, riparianvegetation planting <strong>and</strong> fencing forriparian leased areas negotiatedduring FY 90. FY 91 funding of l<strong>and</strong>ownercontacts/riparian leasenegotiations for FY 92 implementationis dependent on sub<strong>basin</strong> plans <strong>and</strong>budget negotiations for FY 92.84-22 RDS Middle Fork <strong>and</strong> Tributaries, John Day River-USFS/Malheur NFmctive: Increase the quantity, quality, <strong>and</strong> diversityof pool habitat for juvenile steelhead <strong>and</strong> chinooksalmon.Imorovement: Instream structureSpecie: Chinook <strong>and</strong> Steelhead6 Habit&: milesFY 91 activities include instreamstructure construction projects <strong>and</strong>O&M of previous projects.4/l/91l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM q Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECTI.1 21NUMBER -IT-~~JLE/OBJECTIVE~TSTATUSCONTRACT TERMSTART RENEWALDATF DATE85-71 RDS South Fork John Day River Habitat Enhancement/Izee FallsFish Passage - BLM9/l/85 3/31/91Izee Falls SubprojectImplementation deferred on <strong>fish</strong>passage at Izee Falls until comple-tion of sub<strong>basin</strong> plans. O&Mof past habitat enhancement projectscontinue in FY 91.Obiective: Provide <strong>fish</strong> access to 81 miles of spawning<strong>and</strong> rearing habitat by providing passage over 56-footfalls.Improvement: PassageSoecies: Wild Summer SteelheadBenefit: Benefit:Cost ratio is 5.4:1Habitat: 81 milesUmatilla River Sub<strong>basin</strong>83-436 JGM Three Mile Dam Passage Improvements - USBR Construction of right bank ladder 5/l/84 ---Obiective: Design <strong>and</strong> construct facilities, includingladders <strong>and</strong> canal screens, to enhance <strong>fish</strong> passage atThree Mile Dam <strong>and</strong> WEID canal screens. Design <strong>and</strong>build trapping <strong>and</strong> counting facilities.Imorovement: PassageSpecies: Summer steelhead, spring <strong>and</strong> fall chinook<strong>and</strong> trap completed winter-fall 1988.Operational shake-out period continues.Construction of left bankfacilities completed July 1988.Operational shake-out period for leftbank continues.Project-specificmonitoring <strong>and</strong> evaluations beganFY 1990.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. JohnsonZ/PM q Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


CONTRACT TERMPROJECT11 21 START RENEWALNUMBER PO - PM TITLE/OBJECTIVE PROJECT STATUS DATF DATF87-104 & JGM Westl<strong>and</strong> (87-104) <strong>and</strong> Stanfield (87-104-l) Diversion87-104-lImprovements - ODFWDbiective: Improve passage up <strong>and</strong> downstream at Westl<strong>and</strong>,<strong>and</strong> Stanfield irrigation diversion dams by ladder <strong>and</strong>screen improvements.Imorovement: PassageSpecies: Summer steelhead, spring <strong>and</strong> fall chinookPredesign completed. Westl<strong>and</strong> l/87 Westl<strong>and</strong>hydraulic review completed. Final 10/90Design completed for Westl<strong>and</strong>.Construction, screen/trap -Stan-fieldcompleted in June 1990. 6/90Zllddik:Westl<strong>and</strong>:Start construction, ladder - June1990. All construction to becomplete by October 1990.Stanfield:Final design started March 1989.complete Oct. 1992. Start construction:ladder - June 1992,screens - Oct. 1991. All constructioncomplete, Stanfield - June 1992.87-100 JAB Umatilla River Basin Fish Habitat Enhancement - FY 1990: Treat 6-mile section ofUSFS/lJmatilla NFMeacham Creek.4/87 3/91Qbiective: Instream <strong>and</strong> riparian habitat improvementfor portions of the Umatilla River <strong>and</strong> tributaries onthe Umatilla National Forest.Imorovement: Instream structures18 Habitat: milesSpecies: Summer steelhead <strong>and</strong> spring chinook.Benefit: (Entire <strong>basin</strong>) 21,700 summer steelhead <strong>and</strong>21,100 spring chinook smolts.FY 1991: Complete North Fork MeachamCreek <strong>and</strong> Pearson Creek.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. JohnsonZ/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECT11 21NUMBER PO - PMCONTRACT TERMSTART RENEWALTITLE/OBJECTIVE PROJECT STATUS DATF DATE87-100-l JABUmatilla River Basin Fish Habitat Enhancement - CTUIRQbiective: Instream <strong>and</strong> riparian habitat improvementfor portions of the Umatilla River <strong>and</strong> tributaries onthe Umatilla Reservation.Imorovement: Fencing, riparian revegation, instreamstructures18 Habitat: milesSoecies: Summer steelhead <strong>and</strong> spring chinook.Benefit: See Project 87-100.FY 1990: Complete 2 miles atUmatilla River <strong>and</strong> Meacham CreekFY 1991: Begin construction atSquaw Creek.FY 1992: Complete construction atSquaw Creek.7187 4/9287-100-2 JAB Umatilla River Basin Fish Habitat Enhancement - ODFWQbiectivel: Instream <strong>and</strong> riparian habitat improvementfor portions of the Umatilla River <strong>and</strong> tributaries onprivately-owned l<strong>and</strong>.Imorovement: Fencing, riparian revegation, instreamstructures18 Habitat: milesSpecies: Summer steelhead.Benefit: See Project 87-100FY 1990: Complete work at East Birch 7/87 3/91Creek, continue at Meacham Creek, <strong>and</strong>begin work at West Birch Creek.FY 1991: Complete work at MeachamCreek, continue at West Birch Creek,<strong>and</strong> start at North Fork Meacham Creek.88-22 JGM Umatilla River Basin Trap <strong>and</strong> Haul - ODFWuective: To provide for passage of adults <strong>and</strong> smeltsunder low-flow <strong>river</strong> conditionsImorovement: PassageSpecies: Summer steelhead, spring <strong>and</strong> fall chinookDesign <strong>and</strong> acquisition of equipment(trucks, trailers, etc.)completed February 1989. Trap atThree Mile Dam right bank ladderoperational - November 1987. Westl<strong>and</strong>smolt trap operational -June 1990. Trap <strong>and</strong> haul <strong>program</strong>operational - May 1989. Continue toconduct <strong>program</strong>, conduct shake-outat facilities <strong>and</strong> refine operationalcriteria. ODFW <strong>and</strong> Tribes are fundedby BPA to operate trap <strong>and</strong> haul <strong>program</strong>.lo/875/91l/PO q Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM q Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoats


PROJECT11 21NUMBER PO - PMCONTRACT TERMSTART RENEWALTITLE/OBJECTIVE PROJECT STATUS DATE DATE89-24-1 JAB Passage Facility Evaluation <strong>and</strong> URB Adult Fish MonitoringQbiectives: Evaluate loss of juvenile <strong>fish</strong> due topassage through or over WEID Canal screens. Monitorpassage of adult salmon <strong>and</strong> steelhead at Three MileDam.Species: Summer steelhead, spring <strong>and</strong> fall chinookFY 1990: Evaluate WEID Canal screen 9/89<strong>and</strong> adult passage at Three Mile Dam---87-416 & JGM87-416-1Cold Springs (87-416-l) <strong>and</strong> Maxwell (87-416) Divers ionImprovement - USBRQbiectives: Improve passage up <strong>and</strong> downstreamat Cold Springs <strong>and</strong> Maxwell diversions. Improvemen tsinclude <strong>fish</strong>ways <strong>and</strong> canal screens.Imorovement: PassageSoecies: Summer steelhead, spring <strong>and</strong> fall chinook.All construction complete. USBR 7/87turned projects over from constructionto O&M in April 1990. EPA isfunding O&M under an O&M contractwith USBR. The contract term isindefinite.O&M isongoing87-104-Z JGMWestl<strong>and</strong> Non-Fish ImprovementsObiectives: To install improvements on Westl<strong>and</strong>irrigation system that will allow <strong>fish</strong> passagefacilities to operate as intended.Jmorovement: PassageSpecies: Steelhead <strong>and</strong> chinook.Contract in place with Westl<strong>and</strong> 3/90Irrigation District. Predesign tobe completed by June 1990. Finaldesign to be completed by end ofsummer 1990, <strong>and</strong> construction to becompleted by end of fall 1990.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECT11 21NUMBER PO - PM TITLE/OBJECTIVEGr<strong>and</strong>e Ronde River Subbasi nPROJECT STATUSCONTRACT TERMSTART RENEWALDATF DATE84-9 RDS Gr<strong>and</strong>e Ronde Habitat Improvement Project -USFS/Wallowa-Whitman NF7/l/844/l/91Upper Gr<strong>and</strong>e Ronde Basin SubprojectDbiective: Improve spawning <strong>and</strong> rearing habitat inthe Upper Gr<strong>and</strong>e Ronde River.Imorovement: Instream structuresHabitat: 53 milesFY 91 activities include theconstruction of instream structures,riparian fencing, vegetation planting<strong>and</strong> 0 & M of previous projects.Upper North Fork John Day Basin SubprojectObiective: Improve spawning <strong>and</strong> rearing habitatin the North Fork John Day RiverHabitat: 49 milesSoecies: Wild spring chinook <strong>and</strong> steelheadFY 91 activities include theconstruction of instream structures,riparian fencing, vegetation planting,<strong>and</strong> 0 & M of previous projects.Lower Gr<strong>and</strong>e Ronde Basin SubprojectQbiective: Improve spawning <strong>and</strong> rearing habitatin the Lower Gr<strong>and</strong>e Ronde River.Habitat: 30 miles&.ecies: Spring chinook <strong>and</strong> summer steelheadFY 91 activities include riparianfencing, construction of instreamstructures, riparian vegetationplanting, <strong>and</strong> O&M of previousprojects.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. JohnsonZ/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


PROJECT11 21NUMBER PO - PMCONTRACT TERMSTART RENEWALTITLE/OBJECTIVE PROJECT STATUS DATE DATE84-25 RDS Gr<strong>and</strong>e Ronde Habitat Improvement Project - ODFW 7/l/84 5/l/91Upper Gr<strong>and</strong>e Ronde Sub<strong>basin</strong> SubprojectFY 91 activities include instreamstructure/streambank stabilization,Qbiective: Improve the quality <strong>and</strong> quantity of spawning riparian fencing <strong>and</strong> planting for<strong>and</strong> rearing habitat for salmon <strong>and</strong> steelhead through riparian leased areas negotiatedhabitat improvement activities.during FY 90. FY 91 funding ofl<strong>and</strong>owner contact/riparian leasenegotiations for FY 92 implementationis dependent on sub<strong>basin</strong> plans <strong>and</strong>budget negotiations for FY 92.Joseph Creek Sub<strong>basin</strong> SubprojectFY 91 activities include instreamstructure/streambank stabilization,Qbiective: Improve the quality <strong>and</strong> quantity of spawning riparian fencing, <strong>and</strong> planting for<strong>and</strong> rearing habitat for steelhead through habitat riparian leased areas negotiatedimprovement activities.during FY 90. FY 91 funding ofl<strong>and</strong>owner contact/riparian leasenegotiations for FY 92 implementationis dependant on sub<strong>basin</strong> plans <strong>and</strong>budget negotiations for FY 92.Yakima River Sub<strong>basin</strong>86-75 SML Little Naches River Passage - USFS/Wenatchee NF Construction of <strong>fish</strong>way <strong>and</strong> channelrehabilitation completed fall 1987.Qbiective: Construct <strong>fish</strong> passage facility to correct 8PA will continue to fund operationpassage problems resulting from Salmon Falls. <strong>and</strong> maintenance activities.Rehabilitate flood-damaged reach below falls to providean adequate passage corridor to the <strong>fish</strong> passagefacility.Imorovement: Passage, instream channel modification,<strong>and</strong> riparian revegetation10/30/85 12/31/90l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, ROS/R. Stoots


PROJECTNUMBER11 21PO - PMTITLE/OBJECTIVECONTRACT TERMSTART RENEWALPROJECT STATUS DATE DATE86-75cont.Habitat: 18 to 24 miles, depending on speciesSpecies: Spring chinook, coho, <strong>and</strong> steelheadBenefit: $oecies # SmolbSpring chinook 30,300Coho 39,600Steelhead 6,500Clear-water River Sub<strong>basin</strong>84-5 SML South Fork Cleat-water River - USFSl/1/84 1991Red River SubprojectDbiective: Increase the quantity <strong>and</strong> improve thequality of spawning <strong>and</strong> rearing habitat foranadromous <strong>fish</strong>.Imorovement: Instream structureHabitat: Approximately 20 milesSoecies: Spring chinookBenefik: Benefit:Cost ratio is 15:lUSFS has completed construction onFederal l<strong>and</strong>. Construction of fencesis in progress on four private ranches.Completion scheduled for 1990. O&Magreement will be required beyond 1990to protect investments. USFS hasrequested additional funding tocomplete project. Final report willsummarize project completion.Project completion delayed untilFY 91.Crooked River SubprojectDbiective: TO increase natural smolt productionpotential of salmon <strong>and</strong> steelhead.Imorovement: StructuresHabitat: 17 milesSpecies: Chinook <strong>and</strong> steelheadBenefit: Benefit:Cost ratio is 6.22:1Completion scheduled for 1991.Project has been funded to completionwith FY 1987 funds. Evaluation<strong>and</strong> O&M scheduled for 1988-1991.L/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM q Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


CONTRACT TERMPROJECTSTART11 21RENEWALNUMBER PO - PM TITLE/OBJECTIVE PROJECT STATUS DATE DATE84-6 SML Clearwater River Habitat Enhancement Improvements - 4/l/84 ---USFS/Clearwater NFLo10 Creek SubprojectObjective: Increase the quantity <strong>and</strong> improve thequality of spawning <strong>and</strong> rearing habitat foranadromous <strong>fish</strong>.Imorovement: Instream structureHabitat: 12 milesa: Spring chinook <strong>and</strong> steelheadBenefit: 8enefit:Cost ratio is 4O:lEldorado Creek SubprojectEvaluation <strong>and</strong> monitoring of physicalstructures is ongoing. O&M willcontinue to 1991. Final report onall Clear-water NF projects will becompleted in 1991. Project hasbeen funded to completion withFY 1987 funds. Completion expectedin FY 1991.Project completed.Qbiective: Remove rock barriers to correct passageproblems resulting from basalt falls <strong>and</strong> associated highvelocitychutes which prevent access to spawning <strong>and</strong>rearing habitat above the site.Imorovement: Instream structure <strong>and</strong> blastingHabitat: 10 milesSpecies: Steelhead <strong>and</strong> chinookBenefit: 24,000 chinook <strong>and</strong> 12,500 steelhead smoltsCrooked Fork SubprojectProject completed.Qbiective: Remove rock barriers to correct passageproblems resulting from rock chutes <strong>and</strong> waterfalls whichprevent access to spawning <strong>and</strong> rearing habitat abovethe site.Imorovement: Instream structureHabitat: 5.65 milesSpecies: Spring chinook <strong>and</strong> summer steelheadBenefit: 36,000 chinook <strong>and</strong> 21,000 steelhead smeltsl/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoats


CONTRACT TERMPROJECT11 21 START RENEWALNUMBER PO - PM TITLE/OBJECTIVE PROJECT STATUS DATF DATE87-112 SML Orofino Creek Passage - Consultant A biological/engineering feasibility 6/24/87 --.-. .lectlve: Construct <strong>fish</strong> passage facility to correctpassage problems resulting from Orofino Falls.Imorovement: PassageHabitat: 62 milesSpecies: Summer steelheadBenefit: 12,718 steelhead smoltsstudy was completed in FY 1989.The Project TWG requested a review ofthe cost estimates for the alterna-tives in the engineering feasibil-ity report <strong>and</strong> additional conceptualdesign of lower-cost trap-<strong>and</strong>-haulfacilities. BPA's engineering consultantcompleted this task inOctober 1989. Further implementationhas been deferred to a future FYbeyond FY 91.CDCDSalmon River Sub<strong>basin</strong>84-23 SML Camas Creek. Idaho - USFS/Salmon NFUbiective: Improve riparian conditions to increasesalmon <strong>and</strong> steelhead spawning <strong>and</strong> rearing potential.Imorovement: Fencing <strong>and</strong> riparian revegetation3 Habitat: milesSpecies: Spring chinook <strong>and</strong> steelheadBenefit: Smolt AdulSteelhead 4,586 76Chinook 24,570 128Fencing <strong>and</strong> revegetation completed 6/29/84 9/01/91in FY 1989. Monitoring willcontinue in FY 1990.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


CONTRACT TERMPROJECT11 2/START RENEWALNUMBER PO - PM TITLE/OBJECTIVE PROJECT STATUS DATE DATE83-359 SML Salmon River Habitat Enhancement - Shoshone/Bannack Tribe10/l/83 l/90Bear Valley Creek Habitat Improvement SubprojectQbiective: Enhance habitat degraded by historic mining<strong>and</strong> dredging operations.Imorovement: Instream structure <strong>and</strong> riparian enhancementSpecies: Wild chinook salmon <strong>and</strong> summer steelheadProject construction was completedin FY 1988. Monitoring will continuein FY 1990.East Fork construction to begin inFY 90. Funding is insufficient toaccomplish all project measures asplanned.Yankee Fork/East Fork Salmon River SubprojectObjective: Enhance habitat degraded by historic mining<strong>and</strong> dredging operations.Imorovement: Instream structureHabitat: 152 milesSalmon Species: <strong>and</strong> steelheadPlan/design <strong>and</strong> NEPA compliance inprogress. Construction began in1987 <strong>and</strong> was completed for YankeeFork in FY 1988. East Fork NEPAcompliance to be completed in 1990.Monitoring will continue in 1990.l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer. DEJ/D. Johnsonz/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


CONTRACT TERMPROJECT1/ 21 START RENEWALNUMBER PO - PM TITLE/OBJECTIVE PROJECT STATUS DATE DATE83-415 SML Alturus Lake Creek <strong>and</strong> Upper Salmon River Flow Water rights will be acquired by the g/30/89 g/30/90Augmentation - USFS/Sawtooth NFUSFS with full flow available for. .iective: Enhance natural production of chinook salmon<strong>and</strong> reestablish sockeye salmon production throughincreased streamflow.Imorovement: Instream structureSoeciez: Chinook <strong>and</strong> sockeyeBenefit: Flow augmentation alternative = benefit:costratio of 15.5:1 to 23.4:1; Water right acquisitionalternative = 18.5:l.<strong>fish</strong> passage in Alturas Lake Creekduring Spring 1991. Increased flowswill open up not only passage toAlturas Lake, but spawning gravelsas well.84-24 SML Marsh/Elk/Valley/Upper Salmon River, Idaho -USFS/Region 4Qbiective: Identify specific reaches of the Upper SalmonRiver, Marsh <strong>and</strong> Elk creeks where habitat improvementscould lead to increased salmon <strong>and</strong> steelhead habitat;recommend, for future implementation, measures to improvehabitat (e.g., fencing, streambank stabilization <strong>and</strong>instream structures).(BPA/USFS) for implementation.Improvement: Instream structureHabitat: 150 milesDevelop a cost-sharing agreementSpecies: Steelhead, spring <strong>and</strong> summer chinookPlan/inventory phase has beencompleted. Construction beganin 1987. Elk <strong>and</strong> Lower Bear Valleycreeks were given high priority forcompletion. USFS completed animplementation plan early in FY 1988for completion of all projects.Construction proceeding on LowerBear Valley Creek, Elk Creek <strong>and</strong>Upper Salmon River projects.6/29/84 4/30/92l/PO = Project Officer: RJA/R. Austin, JAB/J. Bauer, DEJ/D. JohnsonL/PM = Project Manager: SML/S. Levy, JGM/J. Marcotte, RDS/R. Stoots


4.34.3 ROZA DAM FISH PASSAGE FACILITIES(Juvenile Facilities Completion: March 1, 1987)(Adult Facilities Completion: March 1, 1988)803(b)(2)[Abstract] BPA shall fund the U.S. Bureau of Reclamation (USBR>to renovate <strong>and</strong> repair adult <strong>and</strong> juvenile <strong>fish</strong> passagefacilities at Roza Dam.ACTION ITEM ACTIVITY SUMMARY:Objectives:To fund the USBR to renovate <strong>and</strong> repair adult <strong>and</strong> juvenile <strong>fish</strong>passage facilities at Roza Dam.Background <strong>and</strong> Progress to Date:Plans:Projects:The USBR owns Roza Dam; <strong>fish</strong> passage facilities have been constructedthrough Congressional appropriations. The project is one of 20 suchpassage improvement projects in the Yakima River Basin. Fish screen<strong>and</strong> ladder improvements were required to protect juvenile <strong>fish</strong> frombeing lost in irrigation canals <strong>and</strong> to enable adult salmon <strong>and</strong>steelhead to migrate upstream to spawn. The project now providesadequate upstream <strong>and</strong> downstream <strong>fish</strong> passage, including adequatepassage during periods of reservoir drawdown.USBR began screen construction in December 1985; facilities <strong>and</strong>ladder modification construction bids were opened in August 1986.Construction of the facilities was completed in FY 1989.Action Item has been completed.No BPA-funded projects.73


4.44.4PROSSER DAM FISH PASSAGE FACILITIES(Juvenile Facilities Completion: March 1, 1987)(Adult Facilities Completion: December 1, 1987)803(b)(3)[Abstract] BPA shall provide funds to the USBR for constructionof improve- ments <strong>and</strong> additions to Prosser Dam necessary toprovide safe, efficient, <strong>and</strong> timely passage of adult <strong>and</strong>juvenile <strong>fish</strong>.ACTION ITEM ACTIVITY SUMMARY:Objectives:Provide funds to the USBR for construction of Prosser Dam improvements<strong>and</strong> additions necessary to provide safe, efficient, <strong>and</strong> timelypassage of adult <strong>and</strong> juvenile <strong>fish</strong>.Background <strong>and</strong> Progress to Date:Plans:Projects:The USBR owns Prosser Dam; <strong>fish</strong> passage facilities have beenconstructed through Congressional appropriations. The project is oneof 20 such passage improvement projects in the Yakima River Basin.Fish screen <strong>and</strong> ladder improvements were required to protect juvenile<strong>fish</strong> adequately from being lost in irrigation canals <strong>and</strong> to enableadult <strong>fish</strong> to migrate upstream to spawn.USBR began screen construction in May 1986. Right bank ladder wascompleted in May 1986. Left <strong>and</strong> center ladders were completed inSeptember 1989.Action Item has been completed.No BPA-funded projects.75


4.54.5 YAKIMA RIVER FISH PASSAGE IMPROVEMENTS(Completion of Elements in Table 3 of 803(b)(5): December 1, 1988)(Post-Construction Evaluations)803(b)(5)Upon approval by the Council, BPA shall fund the design <strong>and</strong>construction of the improvements listed in Table 2. All <strong>fish</strong>screening facilities shall meet current screening designst<strong>and</strong>ards.ACTION ITEM ACTIVITY SUMMARY:Objectives:To construct Yakima River <strong>fish</strong> passage improvements.Background <strong>and</strong> Progress to Date:Plans:A network of irrigation canals diverts water from the Yakima <strong>and</strong>Naches <strong>river</strong>s for use by various agricultural interests in the YakimaRiver Basin of Central Washington. Juvenile salmon <strong>and</strong> steelheadoften stray into these canals during their outmigration to the sea.The BPA, USBR, Bureau of Indian Affairs (BIA>, <strong>and</strong> Washington Stateare constructing <strong>fish</strong> screens to direct the young salmon <strong>and</strong>steelhead back to the Yakima <strong>and</strong> Naches <strong>river</strong>s.The Yakima Project entities will fund the construction of <strong>fish</strong>ladders at various projects to facilitate the normal upstreammigration of adult salmon <strong>and</strong> steelhead.BPA plans to fund construction through to completion <strong>and</strong> to evaluateprojects as they are completed.See project summaries on following table.77


]. COMPIETED PROJECTSPROJECTNUMBERTITLEPROJECT STATUS86-112 Toppenish/Westside/EllensburgScreen Fabrication - WDFProiect Manager: T. CluneDate December comoletti: 1989ResultsKonclusim: Screen fabricationcompleted.QbiectiveA: Fabricate screensfor the three projects listedin the title.ZI.ECTPROJECTNUMBERTITLEPROJFCT STATUSSCHEDULE AND MILESTONES85-62 Passage ImprovementEvaluations - BPNLProject Manaaer: T. Clunem: Evaluateeffectiveness of passageimprovement projects.Date initiated: March 1985Results/Conclusions: Evaluation isongoing; results published in BPA<strong>annual</strong> reports.Continuing: Evaluation will continue as projectsare completed <strong>and</strong> go on line.89-90 Phase II Screen Predesign -USBRProiect Manaaer: T. CluneDate Initiated: July 1989Results/Conclusions: None at this time.FY 1990: Begin predesign <strong>and</strong> NEPA.wectives: Predesign/NEPAof 63 <strong>fish</strong> screen facilitiesthroughout the Yakima Basin.project 88-111, Stevens/Naches/Selah Screens, <strong>and</strong> Project86-65, Snipes/Allen Screens,have been combined with Project89-90.


jI1. NEW PROJECTSNone.


4.64.6 WATER EXCHANGE FOR UMATILLA RIVER(Support Beginning Spring 1987)(Report Evaluations: Annually)703(a>(17)[Abstract] BPA shall provide power or reimbursement for powercosts to USBR pumping plants designed to exchange Columbia Riverwater for Umatilla River water. The USBR must obtain consentfrom all affected water users <strong>and</strong> regulators <strong>and</strong> provideassurance to the Council that water exchanged to augmentstreamflows will be used to meet <strong>annual</strong> flow objectivesestablished by the ODFW <strong>and</strong> the CTUIR. The Oregon WaterResources Department (OWRD> will certify <strong>annual</strong>ly to the Councilthat the exchanged water will improve instream flows <strong>and</strong> willbenefit <strong>fish</strong>. The USBR shall fund state <strong>and</strong> tribal <strong>fish</strong> <strong>and</strong><strong>wildlife</strong> agency monitoring <strong>and</strong> evaluation studies to determinethe biological effectiveness of this measure.ACTION ITEM ACTIVITY SUMMARY:Objectives:To support instream flow enhancement efforts, which will increaseUmatilla anadromous <strong>fish</strong> production by improving passage <strong>and</strong> rearingconditions.Background <strong>and</strong> Progress to Date:Federal authorizing legislation prepared by project sponsors wasapproved in fall 1988. The Council amended the Program to providefor BPA funding of power costs associated with interim pumping. USBRwill h<strong>and</strong>le operation <strong>and</strong> maintenance, capital <strong>and</strong> evaluationactivities.Because the original Program language did not include interim pumping<strong>and</strong> because USBR pumping plants are still in the planning/designstage, no water exchanges under this Action Item took place untilSpring 1989. Through passage-assistance projects (Projects 87-409<strong>and</strong> 88-50) under Action Item 4.2, BPA had provided for pumping powerto operate existing West Extension Irrigation District (WEID) pumpsto increase flows below Three Mile Dam during spring <strong>and</strong> fall 1987<strong>and</strong> during spring <strong>and</strong> fall 1988.In June 1989, the USBR, with assistance from BPA, OWRD, ODFW, Tribes,<strong>and</strong> the Basin Steering Committee, finalized a <strong>basin</strong> work plan thatincluded the schedule for interim pumping <strong>and</strong> project completion <strong>and</strong>defined the scope of monitoring <strong>and</strong> evaluation activities. BPA <strong>and</strong>USBR entered into an Interim Pumping Agreement in 1990 to provide forthe transfer of funds for power costs associated with interimpumping.The first interim pumping under this Program measure tookplace in spring 1989. In spring 1990, USBR <strong>and</strong> BPA began planningfor power needs for the CRB.81


I. COMPLETED PROJECTSII. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHFl&jJ& AND MILESIQNES89-27 Provide Power for USBRColumbia River PumpsProiect Officer: J. MarcotteExoected start date: FY 19901. FY 1991: Provide power or reimburse for powercosts for interim pumping to Phase I-West Extensionpumps. Continue planning for power arrangementsfor Phase I.Qbiectives: Enhance instreamflows in the Umatilla River byexchanging Columbia River waterfor Umatilla River water.2. FY 1992: Provide power to Phase I - WEID pumps.3. FY 1994 or 1995: Provide power to completedColumbia River pumps.III. NEW PROJECTSNone.


4.6.14.6.1 EVALUATE NON-STRUCTURAL WATER MEASURES IN UMATILLA BASIN(Develop Workplan, Report to Council in April 1989)703(a)(17>[Abstract] BPA, USBR, Council, Oregon Water ResourcesDepartment, <strong>and</strong> other interested parties shall jointly prepare aworkplan for an evaluation of non-structural alternatives thatmay benefit <strong>fish</strong> <strong>and</strong> hydropower generation, <strong>and</strong> whether thecombined benefits of such measures can be quantified.ACTION ITEM ACTIVITY SUMMARY:Objectives:Identify <strong>and</strong> evaluate alternative means of providing enhanced plans,other than pumping/exchange projects.Background <strong>and</strong> Progress to Date:Plans:ProjectsThis action item has been subsumed by the USBR "Section 213" study,m<strong>and</strong>ated by Public Law 100-557. Section 213 instructs USBR to reviewUmatilla Project Operations to identify ways to further mitigate<strong>fish</strong>ery losses. This study encompasses so-called "non-structural"measures in the Program, such as contracts, conservation, reservoirstorage allocation, water deliveries, water rights, <strong>and</strong> water lease<strong>and</strong> purchase. USBR completed review of the report, finalized it <strong>and</strong>submitted it to Congress in late 1989.USBR to be prepared to follow up on any recommendations Congress maydirect.None.85


4.14.14.14.1 TEMPORARY JOHN DAY ACCLIMATION FACILITY(Upon Council Approval, Complete Construction by Spring 1988)703(f)(Z)(B) Upon the Council's approval of the plan, Bonneville shall funddesign, construction, <strong>and</strong> evaluation of the temporary facilities.ACTION ITEM ACTIVITY SUMMARY:Objectives:To build <strong>and</strong> test the effectiveness of acclimation ponds for up<strong>river</strong>bright fall chinook salmon from John Day Mitigation Facilities.Background <strong>and</strong> Progress to Date:Plans:Acclimation facilities reduce the transportation stress of up<strong>river</strong>bright fall chinook transported from John Day Mitigation facilitiesfor release above John Day Dam.During the first 2 years of the Fish <strong>and</strong> Wildlife Program,disagreements among affected parties over the location of theacclimation ponds made it difficult for BPA to implement thisMeasure. When the Council amended the Program in 1984, it providedfor: (1) an agency <strong>and</strong> Tribal plan to be approved before anyconstruction; <strong>and</strong> (2) an evaluation of temporary acclimation ponds.In FY 1986, BPA initiated a site survey of 10 c<strong>and</strong>idate acclimationfacility sites (Project 86-82) to assist the agencies <strong>and</strong> Tribes indeveloping their plan. The joint agency-Tribal work group <strong>and</strong> theCouncil have been provided the completion report for the site studycompleted under Project 86-82. They will select the final site(s) tobe used for acclimation.BPA plans to fund the design, construction, <strong>and</strong> evaluation of theJohn Day Temporary Acclimation ponds, once the Fish <strong>and</strong> Wildlifeagencies <strong>and</strong> Tribes have developed the acclimation pond plan <strong>and</strong> theplan has been approved by the Council. BPA removed Project 89-16,Temporary John Day Acclimation Facility, from the FY 1990 AIWP <strong>and</strong>has not included it in the FY 1991 AIWP. BPA will continue to fundProject 83-313 through completion.87


I. COMPLETED PROJECTSNone.JI. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES83-313 Pen Rearing of Up<strong>river</strong> FallChinook Salmon - USFWSProject Officer: A. RugerGbiectives: To evaluate theeffectiveness of rearingUp<strong>river</strong> Bright Fall Chinook(URBFC) salmon in net pens.Date initiated: FY 1983 1. Continuing: Contractor will collect <strong>and</strong> analyzeadult return data; BPA will publish preliminaryresults in the Annual Report.ResultsKonclusiou: URBFC salmon caneffectively be reared in Columbia River 2. 1991: Contractor will collect <strong>and</strong> analyzebackwaters with net pens, but the actual adult return data, <strong>and</strong> prepare Final Report.evaluation of ocean <strong>and</strong> freshwater BPA will publish Final Report.contribution <strong>and</strong> escapement has yet tobe completed.JII. NEW PROJECTSNone.


4.1514.15.1 DESIGN AND CONSTRUCTION OF YAKIMA HATCHERY(Upon Council Approval, Fund Beginning in FY 1988)803(d)[Abstract] BPA shall fund the design <strong>and</strong> construction of a hatcheryfor salmon <strong>and</strong> steelhead enhancement in the Yakima River Basin <strong>and</strong>elsewhere as described in Section 503l(C)(2), 703(f'>(3>, <strong>and</strong>803(g)(3).ACTION ITEM ACTIVITY SUMMARY:Objectives:To construct a hatchery to protect wild stocks <strong>and</strong> to enhancedepressed stocks by using hatchery-reared <strong>fish</strong> to reseedunderutilized habitat. -Background <strong>and</strong> Progress to Date:Plans:BPA will fund the design, construction, operation,the Yakima outplanting facility. The facility will<strong>fish</strong>ery for the Yakima Indian Nation <strong>and</strong> for othersupplementing natural runs. In November 1987, thethe hatchery master plan, <strong>and</strong> BPA began predesign iPredesign was completed in April 1990.<strong>and</strong> maintenance ofenhance theharvesters byCouncil completedn November 1987.BPA will also fund several other related studies, including a studyto determine the feasibility of establishing anadromous <strong>fish</strong> runsabove Cle Elum Dam (Project 86-45). The results of this project willdirectly influence the size <strong>and</strong> production profile of the Yakimaoutplanting facility. Another study (Project 87-136) will determinethe applicability of acclimating fall chinook salmon in irrigationcanals prior to release. Additional studies will be initiated whendefined by the Hatchery experimental design task team. Theexperimental design team, a component of the Yakima HatcheryTechnical Work Group (TWG), will develop objectives for thesupplementation <strong>program</strong>. Projects will be identified by the TWG <strong>and</strong>implemented to answer questions resulting from the experimentaldesign. All projects are integral to the overallexperimental/supplementation <strong>program</strong> <strong>and</strong> should not be regarded asseparate or distinct studies.1. National Environmental Policy Act (NEPA> compliance for hatcheryconstruction was completed in April 1990.2. BPA will fund design, construction, operation, <strong>and</strong> maintenanceof the hatchery:Predesign: 11187 - 3/90Final design: 8/90 - 12/91Construction: 12/91 - 6/950 & M: Begin 3792 <strong>and</strong> continue3. Facility expected to be partially operational in FY 1992.89


t0cnc,rP2.rY-k:.r07Tal-a5ka. .:l/la..r2a. ..r.-0Jal77. .tir c.r1. .c+wLILCLn1w2;I’42"Im.r *215s".rEoE:~aJc35+. .LrIin4 .:2%; 2u’:‘$ zZ?WaI -JZC” 0. . c, .r22>.c ‘c 2i“$z-0.r cc, rdclL 5k,’2:2z2 IIF4 .r2k22 s” .r.r m5:P1CL22 35+. .Lcxi L n.rk2% Lc,P .-4% ” .r45z*UO. . &.r.Eh.r -0 L-2L ”lo 2%4 .r I*if n n?. .2%2s:: Ir”Y, .rI8 VIE -.r rY m:s2 3ce. .Lcri L nLs4-z am c VI‘i .; ;a, al-c4 nual “$-0%ConI-” k..c)h’C..F ” c‘; g.2.? ‘2 2 .- s-! rdr =k w$ILo5ww2xEz427co co?z90


PROJECTNUMBER TITLE PROJECT STATUS89-43 Yakima Hatchery Pre-engineering- Date Compleu: March 1990Consultantmeet Mana=: T. CluneResults/C&clusi~: Pre-engineeringcompleted.Qbiectives: Conduct preengineeringon Yakima HatcheryProject.II. F-Y 1990 ONGOING PROJECTSPROJECTOR TASKNUMBER TITLE PROJECT STATUS SCHEDULE AN0 MILESTONES86-45 Vakima Hatchery: Cle ElumStudy - NMFSProiect Manaser: T. CluneObiectives: Determine thefeasibility of establishingsockeye salmon aboveCle Elum Dam.Date initiated: October 1986 1. 1991: Release 1989 brood year withCWT <strong>and</strong> PIT tags.Results/Conclusions: Eggs werecollected in July 1987190. Fingerlings 2. Continuing: Evaluate survival of taggedbeing reared. Tests indicate all <strong>fish</strong>. Continue through 1994.<strong>fish</strong> are IHN-negative. Test groupswere released in <strong>and</strong> below Lake CleElum in May 1990. Preliminary databeing collected at Prosser <strong>and</strong> JohnDay Dams. PIT tag detector installedat Prosser juvenile trap.


PROJECTOR TASKNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES88-115 Yakima/Klickitat Hatchery Date Initiated: FY 1988 FY 1991: Final design to begin August 1990.Design <strong>and</strong> ConstructionPt-oiect Manaaer: T. CluneQ&ctives: Complete predesignfor Yakima/Klickitat Hatchery.Results/Conclusions: Completed predesignreport April 1990. Presented report toCouncil.88-120 Yakima <strong>and</strong> Klickitat Basin Date Initiated: October 1987 1. Continuing: Collect data for chinook salmonArtificial <strong>and</strong> Natural<strong>and</strong> steelhead natural production in Yakima <strong>basin</strong>.Production Enhancement Results/CQnrlusiorlf: AgreementProgram - YIN executed; participation in hatchery 2. Continue through hatchery construction.TWG <strong>and</strong> public involvement. ProjectProiect Manaoer: T. Clune 87-136, Yakima Hatchery: Wapato Canal,has been consolidated with ProjectProject Bioloaist: T. Vogel 88-120.g iect' es : Provide forp:rticiiation of YIN, WDF,<strong>and</strong> WDW in development of anatural <strong>and</strong> artificial production<strong>program</strong>.88-123 Yakima Hatchery Coordination- Date initiated: February 1988 FY 1991: Participate in publicRoza Irrigation District.involvement, TWG, <strong>and</strong> water analysis.Proiect Manaaer: T. CluneUbiectives: Provide fortechnical assistance fromRoza Irrigation Districton hatchery project.Results/Conclusions: Goodparticipation <strong>and</strong> input fromirrigation entities.


PROJECTOR TASKNUMBER TITLE PROJECT STATUSSCHEDULF AND MILESTONES89-82 Experimental Design - WDFDate Initiated: June 1989FY 1991: Refine experimental design.Project Manaw: T. Clunectives: Develop experimental features of YakimaHatchery Project.Concu: Initialexperimental design has been completed.89-83 Experimental Design - WDWDate Initiated: June 1989FY 1991: Refine experimental design.CD089-89Proiect Manaaer: T. Clune Results/Conclusions: Initialexperimental design has been completed.Qbiectiva: Oevelap experimental design features ofYakima Hatchery Project.Radiotelemetry Study - NMFS Pate Initiatd: June 1989 FY 1991: Continue radio tagging <strong>and</strong> monitoring.Proiect Manager: T. CluneResults/Conclusions: None at this time.Proiect Bioloaist: T. VogelQbiectivez: Determine the distributionof distinct stocks ofYakima Basin steelhead <strong>and</strong>spring chinook.89-100 Technical Writer - BPNL Date Initiated: July 1989 FY 1991: Complete by October 1990,Proiect Manager: T. CluneDbiectives: Technical assistancefor experimental design<strong>and</strong> NEPA compliance for hatcherypredesign report.Results/Conclusions: Predesign reportcomplete; technical writer working withexperimental design team.


PROJECTOR TASKNUMBER TITLE STATUS SCHEDULE AND MILESTONES89-105 Species Interaction Study - WDW Date Initiat&: September 1989 FY 1991: Continue study.Proiect Manager: T. CluneProiect Biologist: T. VogelResults/Conclusions: Data collectionongoing.Qbiectivel: Determine the effectof anadromous <strong>fish</strong> productionon resident <strong>fish</strong>.90-58 Project Leader Function Date Initia: FY 1990 FY 1991: Continue project.Proiect Manaaer: T. CluneQbiectives: Project was requestedby Council to coordinateidentification <strong>and</strong> resolutionof <strong>fish</strong>ery management issuesassociated with the Yakima/Klickitat Production Project.The Project Leader was appointedby the YIN, WDF, <strong>and</strong>WOW.Results/Conclusions: Project progressingsatisfactorily.90-65 Juvenile Monitoring Trap Date Initiated: FY 1990 FY 1991: Continue calibration studies.Calibration - NMFSResults/Conclusions: None at this time.Proiect Manaaer: T. CluneProiect Bioloaist: T. VogelQbiectives: Calibrate Prossersmolt trap for in<strong>river</strong> vs. Canaldistribution of outmigratingsalmon <strong>and</strong> steelhead.


III. NEW PROJECTSPROJECTOR TASKNUMBER TITLE PROJECT STATUS90-64 Klickitat River Monitoring New projectFY 1990: Develop <strong>program</strong> <strong>and</strong> initiate monitoring.Project Maw: T. CluneProiect Bioloaist: T. VogelDbiectives: Monitor springchinook <strong>and</strong> steelhead smolts inthe hatchery supplementation<strong>program</strong>. Coordinate with MEG,<strong>and</strong> supplementation TWG's.90-66 Genetic Guideline Development New projectFY 1991: Develop guidelines.Proiect Manaaer: T. CluneProiect Biolooist: T. VogelDbiectives: Develop geneticguidelines for stocks of salmon<strong>and</strong> steelhead for Yakima Basinsupplementation <strong>program</strong>.90-67 Lower Yakima River SmoltTrap Development - WDFNew projectFY 1991: Develop trap <strong>and</strong> begin monitoring.Proiect Manaaer: T. CluneProiect Biologist: T. Vogelgbiectives: To develop a smelttrap for the Lower Yakima Riverto determine distribution of fallchinook juveniles.


PROJECTOR TASKNUMBER TITIE PROJFCT STATUSULE AND WFS90-68 Adult Trap Predesign - USBR New projectFY 1991: Begin preliminary design.Project Manaaer: T. CluneFY 1992: Begin final design.-es: Predesign of adulttrap facilities for the YakimaHatchery project.90-69 Yakima Hatchery Final Design New projectFY 1991: Begin final design.Project Manaaer: T. CluneFY 1992: Complete final design. Begin construction.Qbiectives: Final design ofYakima Basin Facilities.90-71 Smolt Loss Evaluation New projectFY 1991: Begin smolt loss evaluation.Project Manager: T. CluneProiect Biologist: T. VogelQbiectivel: To determine smoltlosses below Prosser Dam dueto various factors includingpredation, temperature, <strong>and</strong>passage conditions.90-72 Computer Information SystemDevelopmentNew projectFY 1991: Refine <strong>program</strong>, coordinate with BasinCIS <strong>program</strong>.uect Manaaer: T. CluneProject Bioloaist: T. VogelQbiectives: Develop CIS forYakima/Klickitat supplementation<strong>program</strong>.


4.16.1 - 4.16.24.16.1- NORTHEASTERN OREGON SPRING CHINOOK OUTPLANTING FACILITY4.16.2 (Fund Development of Master Plan in FY 1988 or Earlier; Upon CouncilApproval, Fund Design <strong>and</strong> Construction>703(f)(5)BPA shall fund planning, design, construction, operation <strong>and</strong>maintenance, <strong>and</strong> evaluation of artificial production facilitiesto raise salmon <strong>and</strong> steelhead for enhancement in the Hood,Umatilla, Walla Walla, Gr<strong>and</strong>e Ronde, <strong>and</strong> Imnaha <strong>river</strong>s inOregon. The artificial production facilities shall be used tosupplement natural production in these <strong>river</strong>s.ACTION ITEM ACTIVITY SUMMARY:Objectives:To fund Master Plan, design, <strong>and</strong> construction of the NortheasternOregon salmon <strong>and</strong> steelhead facilities.Background <strong>and</strong> Progress to Date:Plans:The measure provides for outplanting of about 2.3 million to 3.0million juveniles in the five Oregon <strong>river</strong>s identified in themeasure. The TWG has been organized <strong>and</strong> is assisting in thedevelopment of the hatchery Master Plan. The Master Plan mayidentify broader production needs in the <strong>basin</strong>, not all of whichwould be addressed by this project. BPA has budgeted forimplementation through 1994. Phase I of the Master Plan is complete<strong>and</strong> Phase II underway as of May 1990. 1990 field season will be usedto collect data for siting, conceptual design <strong>and</strong> genetic riskassessment.The Master Plan is scheduled to be completed in 1991. When theCouncil approves the master plan, BPA will proceed with environmentalwork, design, construction, operation, <strong>and</strong> monitoring of thefacilities.97


I. COMPLETED PROJECTSNone.II, FY 1990 ONGOING PROJECTSPROJECTNUMBERTITLEPROJECT STATUS88-53 Northeastern Oregon ArtificialProduction Facil ties - CTUIR/CTWSIR/NPT/ODFWProiect Officer: J. BauerObiectiva: Fund planning,Date Initiated: Planning beganin FY 1988.Results/Conclusions: Contract in placeto produce a Master Plan <strong>and</strong> to site1. FY 1990: Complete facilities master plan Phase Iwith production objectives, <strong>and</strong> facility siting.Begin Phase II to complete production objectivesconceptually site facilities.<strong>and</strong> conceptually design needed facil- 2. FY 1991: Complete master plan.ities.design,construction, operation,maintenance, <strong>and</strong> evaluation of Phase I complete April 1990artificial production facilities began May 1990.to raise chinook <strong>and</strong> steelheadfor enhancement in the Hood,Umatilla, Walla Walla, Gr<strong>and</strong>eRonde, <strong>and</strong> Imnaha <strong>river</strong>s <strong>and</strong>elsewhere. The artificialproduction facilities will beused to supplement naturalproduction in these <strong>river</strong>s.The <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> agencies<strong>and</strong> Tribes expect these facilitiesto provide for outplanting2.3 to 3.0 million juveniles inthe five <strong>river</strong>s identified.Phase II3. FY 1992: Obtain Council approval for finaldesign, <strong>and</strong> construction.4 . . FY 1993: Begin construction.5. FY 1994: Complete construction.III. NEW PROJECTSNone.


4.17.14.17.1 JUVENILE RELEASE/ADULT COLLECTION AND HOLDING FACILITIES ON UMATILLARESERVATION(Operate, Maintain)703(f)(l)[Abstract] BPA shall fund the Confederated Tribes of theUmatilla Reservation (CTUIR) to operate <strong>and</strong> maintain the Bonifer<strong>and</strong> Minthorn juvenile release <strong>and</strong> adult collection <strong>and</strong> holdingfacilities on the reservation.ACTION ITEM ACTIVITY SUMMARYObjectives:To fund operation, maintenance, <strong>and</strong> evaluation of the Bonifer <strong>and</strong>Minthorn facilities.Background <strong>and</strong> Progress to Date:Plans:The facilities are to acclimate <strong>and</strong> imprint juvenile salmon <strong>and</strong>steelhead before release into the Umatilla River, thereby increasingsurvival of juveniles <strong>and</strong> the homing ability of adults. Thefacilities are also used to hold adults before artificial spawning.When constructed, the Umatilla Hatchery (Project 84-33; ActionItem 4.17.2) will rear juveniles for acclimation at the Minthorn <strong>and</strong>Bonifer facilities. Currently, juveniles from other hatcheries areacclimated at the facilities.BPA has funded the operation <strong>and</strong> maintenance of the Bonifer <strong>and</strong>Minthorn facilities since construction in 1983 <strong>and</strong> 1985, respectively.During this time, about 979,000 fall chinook, 660,000 springchinook, 307,000 coho salmon, <strong>and</strong> 192,000 steelhead juveniles havebeen acclimated <strong>and</strong> released. A study to evaluate the <strong>fish</strong>erybenefits <strong>and</strong> operation of the acclimation facilities was begun inFY 1987.BPA will continue fundthe facilities throughas long as there is aning operation, maintenance, <strong>and</strong> evaluation ofan Intergovernmental Agreement with the CTUIRAction Item calling for BPA funding. BPAexpects that results of the evaluation study will be used by theCTUIR to determine the actual <strong>fish</strong>ery benefits of acclimation, toselect effective juvenile release strategies, <strong>and</strong> to improveoperational efficiency.99


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJFCT STATUS03-435 Minthorn <strong>and</strong> Bonifer SpringsSummer Steelhead JuvenileRelease <strong>and</strong> Adult CollectionFacilities - CTUIRProject Officer: J. BauerDbiectives: To operate,maintain, <strong>and</strong> evaluate theMinthorn <strong>and</strong> Bonifer facilitiesfor the acclimation <strong>and</strong> imprintingof juvenile anadromoussalmonids <strong>and</strong> the collection<strong>and</strong> holding of adults.. . .Pate lnitiabd : FY 1983ResultsKonclusionf: Approximately79,000 fall chinook, 161,000 springchinook, 157,000 coho, <strong>and</strong> 52,000steelhead juveniles were acclimated <strong>and</strong>released during FY 1989. No resultsof the facility evaluation study areavailable yet.1. Continuing: BPA will fund operation,maintenance, <strong>and</strong> evaluation of the facilities.2. Continuing: Contractor will provide an <strong>annual</strong>operational report <strong>and</strong> preliminary results ofthe evaluation study in the Project's<strong>annual</strong> report.3. FY 1993: BPA will publish the final resultsof the evaluation study in a final report.III. NEW PROJECTSNone.


4.17.24.17.2 EXPANDED UMATILLA HATCHERY(Fund, upon Council Approval>'03(f)(l)(A) [Abstract] BPA shall fund the construction of a facility totest the efficacy of oxygen supplementation hatchery techniquesto produce up to 290,000 pounds of summer steelhead <strong>and</strong> chinooksalmon smolts. These smolts shall be for release in theUmatilla juvenile release <strong>and</strong> adult collection holdingfacilities <strong>and</strong> for outplanting in the upper Umatilla River toenhance natural <strong>and</strong> hatchery production. Prior to constructionof this facility, the ODFW <strong>and</strong> the CTUIR will develop a facilitymaster plan for Council approval.ACTION ITEM ACTIVITY SUMMARY:Objectives:To provide an improved contribution of anadromous <strong>fish</strong> productionfrom the Umatilla River to the Columbia River Basin.Background <strong>and</strong> Progress to Date:Plans:The facilities are to produce 290,000 pounds of salmon <strong>and</strong> steelheadjuveniles for release in the Umatilla Sub<strong>basin</strong> to enhance natural <strong>and</strong>hatchery production. Hatchery production may also be used in othersub<strong>basin</strong>s. A secondary purpose of the hatchery is to demonstrateoxygen supplementation technology. BPA began funding hatchery designin FY 1986 <strong>and</strong> hatchery master planning in FY 1987. The CTUIR <strong>and</strong>ODFW have been conducting a release <strong>program</strong> using <strong>fish</strong> from otherhatcheries since 1982, <strong>and</strong> intend to continue until this hatchery isoperational. The final design was completed during 1988, <strong>and</strong> theMaster Plan was approved in October 1989. Agreement was reached in1988 that the hatchery will be operated by ODFW as a joint facilitywith Irrigon hatchery <strong>and</strong> that the Umatilla Tribes will beresponsible for preparing the <strong>annual</strong> operating plan.The final design estimates revealed that the hatchery will cost morethan originally expected. The cost increases are due to designevolution, delays in project implementation, changing site conditionsat the well, <strong>and</strong> water production shortfalls. Costs have risen about$4.0 million to total $12.0 million. Construction began inMarch 1990.When the hatchery is completed in 1991, BPA will fund its operation<strong>and</strong> maintenance. After completion, BPA also expects to evaluatehatchery effectiveness. Planning for satellite facilities will beginin FY 1990, with the need to have one or two additional chinook adultholding facilities on line before the mid-1990s.101


I. COMPLETED PROJECTSPROJECTNUMBER TITLE PROJECT STATUS RESULTS/CONCLUSIONS87-415 Umatilla Hatchery Master Comoleted: FY 1990Plan - ODFWproiect Officer: J. MarcotteQbiectives: Develop a MasterPlan to guide hatchery production,management policies,<strong>and</strong> monitoring <strong>and</strong> evaluation.This process was coordinated with regional <strong>fish</strong>eryinterests <strong>and</strong> appropriate Council TechnicalWork Groups. Final plan was submitted to Councilfor issue paper development in February 1989.Council approved the Master Plan in October 1989.Follow-on items to be completed in FY 90.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES84-33 Umatilla Hatchery - USACE Date initiated: FY 1986 1. Winter 1990: Continue construction.Proiect Officer: J. Marcotte Results/Conclusions: Council approved 2. Summer 1991: Hatchery operational; fund O&M.hatchery predesign in October 1986.Qbiectives: Design <strong>and</strong> Hatchery site next to existing Irrigonconstruct the Umatilla Hatchery was selected in cooperationHatchery.with Morrow County. Umatilla HatcheryEnvironmental Assessment was issuedFebruary 1987. FONSI issued April 1987.Council amended Program to exp<strong>and</strong>hatchery production to 160,000 pounds <strong>and</strong>added salmon to production. Councilamended <strong>program</strong> to exp<strong>and</strong> productionto 290,000 pounds <strong>and</strong> test efficiency of02 supplementation. Final designscompleted. Master Plan completeFebruary 1989. Council approvedMaster Plan in October 1989.O&M agreement finalized in spring 1990.Feasibility studies for new chinookholding facilities will be conductedas part of Project 91-14.


s.CF-0cI= .--?>rZECl; .:E .z” c,05,kEJ,”CL:gl ‘f--c7.rmv)2ck cc** a22 .?-4L”L-5ZFm .r449 .rv)SW7.- c4 0.^&.Cz-05 c.rY--062ka5c,0CAm3GI-. ..r24t-”w‘)Ec,:.r)2aL1 3Ect’Y)”.rLL. Icsm LL;FhakFL: .-u ccl .r2:2,7 L.r 3$252al=:f3klr‘). .I.rz1k2sm z2.- ha)+ I::0-u-r‘- 0 m4111F s-‘; 20 zz.r c 4 ,z z 2L al-QJ .” 5 ‘5cccg ‘I .t7;r-. VI Q).rLt-ClCLCx-r iz:,,-I- E Erdza80hrnLn.- 407CI 0071 CrIL malaE LYI-r32m-.rE.Cccr”E 2gsI 842-z.rmr- ”5 .F2:m 07 ^z42 .rF2 .z3maJ,’::2r?. .b.r:1k‘:9$Loz::z=n-z4u-7m103


4.17.34.17.3 LOW-CAPITAL PROPAGATION FACILITY ON NEZ PERCE RESERVATION(Design/Begin Construction by May 1989)703(g)(2)Upon approval by the Council of design <strong>and</strong> construction plansfor low-capital propagation facilities on the Nez PerceReservation, Bonneville shall fund the construction, operation,<strong>and</strong> maintenance of those facilities. The Nez Perce Tribe willdevelop the facility plan <strong>and</strong> will incorporate the informationprovided under Section 703(g)(l).ACTION ITEM ACTIVITY SUMMARY:Objectives:To design <strong>and</strong> construct a low-capital production facility to enhance<strong>fish</strong>eries on Nez Perce Reservation.Background <strong>and</strong> Progress to Date:Plans:Through construction of facilities for spawning, incubation, <strong>and</strong>rearing of chinook salmon <strong>and</strong> steelhead trout, the Nez Perce Tribe(NPT) seeks to re-establish its salmon <strong>and</strong> steelhead <strong>fish</strong>ery. This<strong>fish</strong>ery has nearly been destroyed through construction <strong>and</strong> operationof dams <strong>and</strong> poor l<strong>and</strong> use practices, including agriculture, logging,road construction, <strong>and</strong> mining.Work began on this measure in September 1983. The initial phase ofthe project, which developed an artificial propagation facilityfeasibility study, was completed in January 1985. Site investigationswere conducted in FY 1988, FY 1989, <strong>and</strong> FY 1990.Preliminary design scheduled to begin in FY 1990, followed byenvironmental evaluation <strong>and</strong> final design in FY 1991. Projectcompletion scheduled for FY 1995, when construction funds becomeavailable.1 0 5


I. COMPLETED PROJECTSNone.JI. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS83-350 Nez Perce Low-Capital Date initiated: FY 1983Production Facility - NPTResults/Conclusions: None at this time.Proiect Officer: 5. Levygbiectives: Design <strong>and</strong> constructa low-cost salmon propagationfacility on the Nez PerceReservation.1. FY 1991: Amend measure to exp<strong>and</strong> scope offacility, <strong>and</strong> allow construction off reservation.Continue preliminary design.2. FY 1992: Complete NEPA assessment. Initiatefinal design.3. FY 1992: Complete final design.4. FY 1995: Begin construction, completeproject, <strong>and</strong> begin operation <strong>and</strong> maintenance.(Funding for construction will be unavailableuntil FY 1995.88-126 Nez Perce Technical Date Initiated: January 1988Support - IDFGResults/Conclusions: None.Proiect Officer: S. LevyOn-going technical supportwill continue through FY 1992.Ubiectivel: To providetechnical support onplanning for Nez PerceHatchery project.III. NEW PROJECTSNone.


4.17.44.17.4 HABITAT SURVEY ASSOCIATED WITH ACTION ITEM 4.17.3(Fund>703(c)(3)[Abstract] Bonneville shall fund an evaluation of the lowermainstem Clearwater River to study existing habitat <strong>and</strong>temperature regimes for spawning, incubation, <strong>and</strong> rearing forsalmon <strong>and</strong> steelhead. Proposals for outplanting from the NezPerce low-capital propagation facilities C703(g>(2>1 will bebased on the evaluation.ACTION ITEM ACTIVITY SUMMARY:Objectives:To evaluate the habitat <strong>and</strong> temperature regimes in the lower mainstemClearwater River; the evaluation will determine the feasibility ofestablishing a run of anadromous <strong>fish</strong>.Background <strong>and</strong> Progress to Date:Plans:When constructed, a low-capital salmon <strong>and</strong> steelhead propagationfacility (Action Item 4.17.3) on the Nez Perce Reservation willproduce <strong>fish</strong> for outplanting in reservation streams. The mainstemClearwater River habitat study will try to determine what species cansuccessfully be outplanted in the mainstem Clearwater River <strong>and</strong> toidentify opportunities to enhance existing steelhead rearing. BPAexpects that the NPT will use study information to plan production<strong>and</strong> outplanting strategies for the low-capital facility.BPA began funding a mainstem Clearwater River habitat study(Project 88-15) in October 1987. The study is progressingsatisfactorily.BPA will continue with implementation of Project 88-15 (see followingtable). Upon completion of Project 88-15, the Action Item <strong>and</strong>measure will be completed; no additional projects are planned.1 0 7


PROJECTSI. COMPLETEDNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE OBJECTIVESSCHEDULE AND MILESTONES88-15 Mainstem Cleat-water RiverStudy: Assessment for SalmonidSpawning, Incubation, <strong>and</strong>Rearing - NPTProject Officer: J. GislasonQbiectives: Evaluate theexisting anadromous <strong>fish</strong>habitat <strong>and</strong> the temperatureregime in the lower ClearwaterRiver to determine 1) thefeasibility of establishinga run of anadromous speciesin the lower <strong>river</strong>, <strong>and</strong>2) opportunities for enhancingsteelhead rearing.Date Initiated: October 1987 1. FY 1991: Complete chinook salmon incubation,rearing, <strong>and</strong> outmigration timing studies; completeResults/Conclusions: NPT completed all data collection, data analysis, <strong>and</strong> finalPhase I of the project, a literature report.review <strong>and</strong> temperature/flow dataanalysis, <strong>and</strong> began implementing 2. FY 1991: Project scheduled for completion.Phase II field studies in FY 1989.The Phase I analysis of historicaltemperature data indicated that LowerCleat-water River temperatures aregenerally suitable for fall <strong>and</strong> summerchinook salmon reproduction. Instreamflow field measurements <strong>and</strong> preliminaryvelocity, depth, substrate, <strong>and</strong> coverpreference histograms for anadromous<strong>fish</strong> were completed in FY 1990. Resultsare available in <strong>annual</strong> report (DOE/BP-37474-l).JII. NEW PROJECTSNone.


HATCHERY EFFECTIVENESS----- IMPROVED HATCHERY EFFECTIVENESS(Former Action Item 34.23)703(e) [Abstract] Measure 703(e) concerns 'I Improved Propagation at ExistingFacilities" <strong>and</strong> gives priority to improving <strong>and</strong> re<strong>program</strong>mingpropagation at existing facilities, over construction of newfacilities. The measure includes: (1) research, development, <strong>and</strong>demonstration of improved husb<strong>and</strong>ry practices; (2) strategies for <strong>and</strong>rearing operations aimed at improved operating efficiencies ofhatcheries <strong>and</strong> increased adult returns; (3) genetic stock assessment;(4) improved <strong>fish</strong> health protection; <strong>and</strong> (5) developing sensitive <strong>and</strong>reliable indices of smolt quality <strong>and</strong> readiness to migrate.TECHNICAL SUBJECT ACTIVITY SUMMARY:Objectives:To identify <strong>and</strong> fund research, demonstration, or other projectsnecessary to accomplish improvements in the effectiveness of existinghatcheries.Background <strong>and</strong> Progress to Date:Plans:This section of the AIWP contains four improved hatcheryeffectiveness <strong>and</strong> <strong>fish</strong> health projects begun under former ProgramAction Item 34.23. In 1987, the Council amended the Program todelete Action Item 34.23 <strong>and</strong> form a Hatchery Effectiveness TechnicalWork Group (HETWG) <strong>and</strong> a Fish Disease Technical Work Group (FDTWG).These groups, composed of experts in hatchery effectiveness <strong>and</strong> fis 1health, developed Five-Year Research Work Plans to address thetechnical needs of the Hatchery Effectiveness_.<strong>and</strong> Fish DiseaseResearch Areas of Emphasis, Section 206(b)(l)(c), <strong>and</strong> Program Measure703(e). These plans are discussed under Action Item 6.1 in the AIWP.BPA continues to fund to completion those projects begun under formerAction Item 34.23. One of the currently funded projects isconducting research on infectious hematopoietic necrosis (IHN)virus. This disease was rated as one of the most important diseaseproblems by the FDTWG in its Work Plan. Other projects are pursuing<strong>fish</strong> nutrition research <strong>and</strong> identification of the Ceratomyxa Shastalife cycle. Construction of the Regional Fish Disease Laboratory wascompleted in June 1990.BPA plans to continue funding ongoing multiple-year projects begununder former Action Item 34.23, after reviewing their progress. Nonew projects will be initiated under Action Item 34.23, as it wasdeleted from the 1987 Program. (New <strong>and</strong> ongoing projects from theHETWG <strong>and</strong> FDTWG Five-Year Work Plans can be found under Action Item6.2 in the AIWP.)1 0 9


I. COMPLETED PROJECTSPROJECTNUMBER TITLE PROJECT STATUS87-403 Regional Fish Disease Lab at Date Comoleted: June 30, 1990Oregon State University - OSUResults/Conclusions: The 9,300 squarefootfacility is complete <strong>and</strong> operatingProject Officer: A. Ruger at capacity with up to 500 researchaquariums. Included are outdoor holdingponds, laboratories <strong>and</strong> offices.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE -PROJECT STATUSSCHEDULE AND MILESTONES83-363 Development of Diets forEnhanced Survival of Salmon -ODFWProiect Officer: R. AustinQbiectives: Develop a highquality,cold-processedanimal protein <strong>fish</strong> diet <strong>and</strong>evaluate the effect of the dieton survival <strong>and</strong> return of coho<strong>and</strong> chinook salmon.Date initiated: 1983Results/Conclusions: Preliminary adultrecovery data suggest an improvedsurvival for coho salmon fed the testdiets. However, recovery data foradult fall chinook salmon showed inconsistentsurvival, both by brood year<strong>and</strong> stock (tule <strong>and</strong> up<strong>river</strong> bright).Final Analysis of data from returningadults will be completed in 1991.1. Continuing: Contractor will evaluate theeffect of diet on survival <strong>and</strong> return rate ofcoded wire-tagged coho <strong>and</strong> chinook salmon.2. Continuing: Collection of coded wire taggedadults will continue through 1990.3. June 1991: Recommendations for dietcomponents for enhanced survival will be available.BPA will publish final report.


PROJECTNUMBER TITLE PROJECT STATUSSCHEDULE AND MILESTONES83-312 Epidemiology <strong>and</strong> Control ofInfectious Diseases ofSalmonids in the ColumbiaRiver Basin - OSUProiect Officer: A. RugerQbiectives:1. Confirm role of clam as aconcentrator of C. Shasta2. Determine if C. Shastaspores undergo any developmentalchanges when injested by clams.3. Develop a diagnostic testkit for R. Salmoninarum, causitiveagent of BKD.Date Initiated: May 1983Results/Conclusions:1. Geographic range of C. Shastaexp<strong>and</strong>ed.2. Indication that a fresh water clamis involved in life history of &. Shasta.3. Immunological methods developed todetect life stages.1. Project is funded to completion with FY 1987funds.2. March 31, 1991: Final report <strong>and</strong> projectcompletion.84-43 Evaluation of a Subunit Date initiated: July 1984 1991: Evaluate vaccine in production lotsVaccine Against IHN Virus - OSU<strong>and</strong> write completion reports.Results/Conclusions: A recombinant DNAProiect Officer: R. Morinaka vaccine for IHN virus has been prepared<strong>and</strong> laboratory tested <strong>and</strong> found to beQbiectives: Develop <strong>and</strong> test effective. Large quantities of vaccinea subunit vaccine against IHN have been prepared. The Idaho Departmentvirus.of Fish is continuing to field test thevaccine in 1990-91.III. NEW PROJECTSHatchery Effectiveness research projects in the Five-Year Work Plan of the HETWG are listed under Action Item 6.2.


4.17.54.17.5 WILLAMETTE BASIN STUDY PLAN(Fund; Coordinate with Supplementation Work Plan)703(h)(2)[Abstract] BPA shall provide funds to study the best method ofsupplementing natural stocks of spring chinook with hatcherystocks in the Willamette River.ACTION ITEM ACTIVITY SUMMARY:Objectives:To fund a study to supplement the Willamette spring chinook runswithout adversely affecting natural runs of resident <strong>fish</strong>ery or thegenetic integrity of the Columbia Basin <strong>fish</strong> populations.Background <strong>and</strong> Progress to Date:Supplementation, or outplanting, has been identified by the agencies,Tribes, <strong>and</strong> the Council as one of the main ways to increase ColumbiaRiver salmon <strong>and</strong> steelhead runs. This project aims to develop thebest methods for supplementing spring chinook in the WillametteBasin, in order to develop <strong>and</strong> maintain maximum sustained yield <strong>and</strong>to maintain genetic diversity.Phase I, completed during September 1985, surveyed the literature ofoutplanting efforts <strong>and</strong> developed a detailed study design forevaluating possible Willamette Basin strategies. Phase II proposedplanting fry, presmolts, <strong>and</strong> adults in areas with differentproduction potential. The g-year evaluation would determine whichlife stage of spring chinook to outplant for maximum survival.A major review included the study design <strong>and</strong> the relationship toSection 703(h)(l), the overall work plan for supplementation.Section 703(h)(2) concerns only Willamette Basin spring chinook. Thereview, completed in FY 1986, concluded that the initial study designviewed outplanting as a potential continuing effort to supplementhatchery production by using hatchery surpluses. However, bothMeasures 703(h)(l) <strong>and</strong> 703(h)(2) view outplanting as a temporarymeans of enhancing natural production or re-establishing naturalruns. Rebuilding natural runs was not addressed in the study plan,though it is one of the highest priorities of the Program.The impacts of outplanting on resident <strong>fish</strong> will not be answered bythis study design. BPA believes, however, that these impacts shouldbe addressed in supplementation research.1 1 3


Plans:Projects:BPA submitted the study plan to the STWG for review, realizing therelationship with 703(h)(l) that this study should address. Measure703(h)(2) was not a high priority in the STWG Five-Year Work Plan.However, BPA will develop a work plan <strong>and</strong> initiate research when <strong>and</strong>if the STWG determines it is a high priority for achieving theobjectives of the Supplementation Research Work Plan.No BPA-funded projects are planned for FY 1991.1 1 4


4.17.64.17.6 PROPAGATION OF SALMON/STEELHEAD IN PELTON DAM FISH LADDER(Fund, upon Council approval of Master Plan)703(g)(3)BPA shall fund propagation of salmon <strong>and</strong>/or steelhead smolts inthe Z.&mile-long <strong>fish</strong> ladder located at Pelton Dam on theDeschutes River in Oregon. This production shall be in additionto the <strong>fish</strong> propagated in the ladder by Portl<strong>and</strong> GeneralElectric to mitigate the effects of Pelton <strong>and</strong> Round Butte dams<strong>and</strong> will not affect the mitigation responsibilities of thatcompany. The Oregon Department of Fish <strong>and</strong> Wildlife <strong>and</strong> theConfederated Tribes of Warm Springs will develop a master planfor Council approval prior to BPA funding of design <strong>and</strong>construction. The master plan should contain the same type ofinformation as in other hatchery master plans for Yakima,Umatilla, <strong>and</strong> northeastern Oregon facilities.ACTION ITEM ACTIVITY SUMMARY:Objectives:Fund the design <strong>and</strong> construction of propagation facilities at thePelton Dam ladder; fund the propagation of salmon <strong>and</strong>/or steelhead.Background <strong>and</strong> Progress to Date:Plans:BPA is awaiting development of the master plan by the <strong>fish</strong>eriesagencies <strong>and</strong> Tribes. The Master Plan will be complete June 1990.When the Council approves the agency <strong>and</strong> Tribal joint master plan forthe Pelton Dam ladder rearing: BPA will form a work group to assistin the completion of this Action Item. The design <strong>and</strong> constructionwill follow the recommendation of this work group. When the facilityis constructed, an operation <strong>and</strong> maintenance agreement with theoperator will be established.1 1 5


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBERTITLEPROJECT STATUSSCHEDULF AND MIIFSTS89-29 Propagation in PeltonDam Ladder - ODFWProiect Officer: J. BauerQt&ctives:1. To experimentally rearspring chinook smolts in PeltonLadder.2. To determine the capacityfor additional rearing of smolts.3. To produce spring chinooksmolts for Deschutes River <strong>and</strong>other acceptable <strong>basin</strong>s to meetProgram production goals.Date Initiated: September 1989 1. FY 1990: After Council approval ofthe ODFW-CTWSIR master plan, BPA willResults/Conclusions: None at this time. fund rearing of <strong>fish</strong> in the PeltonDam <strong>fish</strong> ladder.2. FY 1991: Begin rearing spring chinooksmolts.3. FY 1993: First smolt releases.4. FY 1997: final report on experiment todetermine ladder rearing capacity.III. NEW PROJECTSNone.


4.2 14.21 HATCHERY RELEASES IN UPPER COLUMBIA(Upon Council Review of Re<strong>program</strong>ming Plan, Fund Releases>703(d)(2)After Council review of the re<strong>program</strong>ming plan developed by the<strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> agencies <strong>and</strong> Indian Tribes, BPA shall providefunds to transfer a portion of the <strong>fish</strong> from existing lowerColumbia River hatcheries to release sites in the upper ColumbiaRiver system to assist in restoring naturally spawning stocks,as provided in that plan.ACTION ITEM ACTIVITY SUMMARY:Objectives:To implement the re<strong>program</strong>ming plan (approved by the Council> toassist in the rebuilding of up<strong>river</strong> <strong>fish</strong> runs.Background <strong>and</strong> Progress to Date:Plans:Projects:BPA underst<strong>and</strong>s that the <strong>fish</strong>ery agencies <strong>and</strong> Tribes have notsubmitted the plan to the Council. When the Council has reviewed theplan, BPA will proceed with funding of hatchery releases in the upperColumbia River. BPA still awaits Council review <strong>and</strong> approval of theplan.Future projects <strong>and</strong> required funding will be identified after theCouncil approves the re<strong>program</strong>ming plan.No defined projects for FY 1991.1 1 7


5.15.1 KNOWN STOCK FISHERIES FIVE-YEAR DEMONSTRATION PROGRAM(Co-Fund to Test Electrophoresis: Begin 1985 Ocean Fishing Season orSubsequent Seasons>503(b)(l)The Council supports in-season management of mixed-stock<strong>fish</strong>eries using electrophoresis to profile the contribution ofthe different up<strong>river</strong> stocks. BPA shall share funding with the<strong>fish</strong>ery management agencies of a five-year <strong>program</strong> thatdemonstrates the effectiveness of this technique in profilingthe ocean <strong>fish</strong>eries more accurately <strong>and</strong> in refining harvestregulations to protect Columbia River stocks. At the conclusionof the five-year <strong>program</strong>, the <strong>fish</strong>ery management agencies willpropose a plan for further action.ACTION ITEM ACTIVITY SUMMARY:Objectives:To demonstrate the effectiveness of the electrophoresis technique forprofiling the contribution of individual Columbia River stocks inmixed populations.Background <strong>and</strong> Progress to Date:Plans:Projects:BPA contributed funds to a study to perfect the electrophoresistechnique to differentiate <strong>fish</strong> stocks <strong>and</strong> to demonstrate itsapplicability in the Columbia River Basin (Project 79-l). BPA fundedfurther application of this technique (Project 83-451) to determineseparate stocks of Columbia Basin anadromous <strong>fish</strong>. These efforts <strong>and</strong>those of the <strong>fish</strong>ery management entities have produced a provenelectrophoresis technique. This technique is now widely applied in<strong>fish</strong>eries management <strong>and</strong> could be applied to profile mixed stockocean <strong>fish</strong>eries. The technique may also soon be used to determinewhether sturgeon populations in the United States stretches of theKootenai River are different from those in Canadian waters. BPAtherefore believes that further research to improve stockidentification methods as part of a hydroelectric mitigation <strong>program</strong>is unnecessary. Stock identification is now a matter of prescriptiveapplication.BPA has no further plans for this Action Item.None.1 1 9


6.16.1 TECHNICAL WORK GROUPS(Begin to Fund in FY 1987)206(b)(l)[Abstract] BPA shall focus its funding of salmon <strong>and</strong> steelheadresearch in the next five years in the following areas ofemphasis:1. Studying water budget effectiveness <strong>and</strong> reservoir mortality;2. Controlling disease problems affecting spring <strong>and</strong> summerchinook;3. Exploring methods for substantially increasing <strong>and</strong>improving hatchery production at existing hatcheries withinthe next 10 years; <strong>and</strong>4. Improving supplementation techniques.BPA shall fund technical work groups composed of representativesof the Fish <strong>and</strong> Wildlife agencies, tribes, hydropower projectoperators <strong>and</strong> BPA, with technical input from other experts, todevelop Five-Year Work Plans for each of the areas listedabove.ACTION ITEM ACTIVITY SUMMARY:Objectives:To fund the establishment of a TWG in each of the four areas ofresearch emphasis <strong>and</strong> to fund the development of Five-Year Work Plans.Background <strong>and</strong> Progress to Date:BPA funded the establishment of four TWGs in FY 1987. Each has madeprogress in its tasks:1. Reservoir Mortality <strong>and</strong> Water Budget Effectiveness TechnicalWork Group (M/WBTWG>:The M/WBTWG agreed on four areas of emphasis: survival <strong>and</strong> flowrelationships, predation, smoltification, <strong>and</strong> dam operations.As opinion was distinctly divided on the focus of survival <strong>and</strong>flow relationships, two Work Plans were submitted to the Councilin September 1987. The <strong>fish</strong>ery agencies/Tribes plan emphasizedlong-term monitoring to determine the effectiveness of the WaterBudget <strong>and</strong> examination of the mechanisms of reservoirmortality. The BPA/USACE/PNUCC plan emphasized shorter-termsurvival research <strong>and</strong> simultaneous research on both the<strong>and</strong> mechanisms involved in reservoir mortality. This latterplan also maintains a basal monitoring <strong>program</strong>. To date, BPAnegotiates <strong>and</strong> funds research projects. In FY 1990, three newprojects were, or will be, implemented.ext


2. Fish Disease Technical Work Group (FDTWG):The FDTWG submitted a work plan to the Council in September 1987.The plan focused on eight major diseases/pathogens <strong>and</strong> theirbiological, economic, <strong>and</strong> <strong>program</strong>matic impact on the ColumbiaRiver anadromous <strong>fish</strong>ery resources. Basic information needs wereidentified <strong>and</strong> categorized by the level of urgency in relationshipto the Fish <strong>and</strong> Wildlife Program. During 1988, the Councilapproved the FDTWG's Five-Year Work Plan.In FY 1990 this <strong>program</strong> area budget was reduced dramatically,causing the PRG to put four new projects into a contingency file.These projects were:90-46, Effects <strong>and</strong> Control of Whirling Disease90-47, Bacterial Coldwater Disease Research90-48, Ectoparasite Research90-57, Ceratomyxa ControlThe FDTWG did not change the priority of these projects.During FY 1990 the FDTWG reviewed, with outside assistance, threeongoing projects:84-43, IHN Sub-unit Vaccine Development <strong>and</strong> Evaluation83-312, Epidemiology of 5 Pathogens89-31, Control of BKD via ELISA3. Hatchery Effectiveness Technical Work Group (HETWG):The HETWG developed evaluation criteria <strong>and</strong> weighting factors forresearch <strong>and</strong> demonstration projects. They ranged from increasingsurvival of salmon <strong>and</strong> steelhead (5.7 weight> <strong>and</strong> increasingproduction (5.2) down to improving evaluation methods (2.4) <strong>and</strong>basic research (1.0). These criteria were used to prioritizeresearch topics, ranging from husb<strong>and</strong>ry practices to improvesurvival or production (ranked No. 1) <strong>and</strong> the meeting of futurenutritional needs (no. 2) down to the water quality st<strong>and</strong>ards'potential to limit artificial propagation (no. 10) <strong>and</strong> potentialfor modifying <strong>fish</strong> behavior to increase survival (no. 11). Planswere drafted for each topic. The HETWG Work Plan was submitted tothe Council in September 1987. The Council adopted this plan inJanuary 1988.During FY 1990 no new projects were started under the HETWG. Arevised Five-Year Work Plan will be completed in FY 1990 that willidentify 5-6 high priority projects. Priority status will bebased, in part, on the project's ability to directly increaseadult production <strong>and</strong> those projects whose results are not sitespecific.1 2 2


4. Supplementation Technical Work Group (STWG):During FY 1987, the STWG was formed in accordance with Sections206(b)(l) <strong>and</strong> (2) of the Program. The STWG has developed aFive-Year Research Work Plan addressing stock selection, time ofrelease, <strong>and</strong> other factors affecting the success ofsupplementation activities. The Five-Year Work Plan was submittedto the Council in June 1988. The Council approved the Plan inSeptember 1988 with the provision that they approve all projectsin advance of implementation.The STWG identified six research projects during FY 1989 thataddressed the research needs identified in the Work Plan. Threeof these projects were developed in sufficient detail for approval<strong>and</strong> procurement activities to begin. The following three projectswere implemented in FY 1989:1. Project 89-96, A Genetic Monitoring <strong>and</strong> Evaluation Programfor Supplemented Populations of Salmon <strong>and</strong> Steelhead in theUpper Columbia River Basin.2. Project 89-97, Evaluation of the Success of SupplementingImnaha River Summer Steelhead with Hatchery Reared Smolts <strong>and</strong>Assessment of the Effect on Natural Production Performance,Life History Characteristics, <strong>and</strong> Genetic Characteristics.3. Project 89-98, Determination of Effectiveness ofSupplementation Strategies <strong>and</strong> Assessment of InteractionBetween Supplemental Hatchery Chinook Salmon <strong>and</strong> NaturalPopulations in the Salmon, Snake, <strong>and</strong> Clearwater Rivers inIdaho.The STWG identified five projects for possible implementation inFY 1990. Additional review by the STWG reduced the number ofprojects for possible implementation in FY 1990 to three. Theseprojects will need further development <strong>and</strong> refinement prior tosubmittal for approval <strong>and</strong> procurement. This activity will takeplace through September 1990. The STWG did not identifyadditional projects for implementation in FY 1991.Plans:BPA will continue to fund the TWGs as long as the Program containsa Measure calling for BPA funding.1 2 3


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES87-307 Technical Work Group (TWG) Datg Initiated: July 1987 FY 1991: BPA will continue to fund the TWGCoordination - PSMFCCoordinator position as long as the CBFWAResultsKonclusiony: BPA has funded continues to participate in the Council'sProject Officer: J. Gislason a TWG Coordinator position with the TWG's <strong>and</strong> the Program contains a measureCBFWA through a contract with calling for BPA to fund the TWG's.Qbiectives:the PSMFC. Travel <strong>and</strong> per diem of1. Coordinate Council Area of CBFWA TUG members are also fundedResearch Emphasis TWG activi- through this contract.ties within the TWG's <strong>and</strong> amongthe TWG's, as required by theImplementation Planning Process(IPP).2. Coordinate TWG planningactivities with other activitiessuch <strong>and</strong> MEG <strong>and</strong> System <strong>and</strong>Sub<strong>basin</strong> Planning, as requiredby the IPP.III. NEW PROJECTSNone.


6.26.2RESEARCH IN THE FIVE-YEAR WORK PLANS(Begin to Fund in FY 1988)404703(e)703(h)206(b)[Abstract] These measures address BPA funding of research,development, <strong>and</strong> testing of improved <strong>fish</strong> husb<strong>and</strong>ry practices,rearing operations, release strategies, stock assessment, <strong>fish</strong>health protection, indices of smolt quality, <strong>and</strong> hatcherysupplementation. Measure 206(b) in the Program directs BPA tofocus its funding of salmon <strong>and</strong> steelhead research in the nextfive years in the four areas of emphasis described under ActionItem 6.1 in BPA's Work Plan. Technical Work Groups in each ofthe areas of emphasis will develop a Five-Year Research WorkPlan for Council approval <strong>and</strong> BPA funding beginning in FY 1988.ACTION ITEM ACTIVITY SUMMARY:Objectives:The Council Technical Work Group (TWG) process was instituted tofocus research planning in four areas of technical emphasisconsidered fundamental to the success of the Fish <strong>and</strong> WildlifeProgram. BPA will incorporate the results of the TWG planning intothe <strong>annual</strong> work planning process <strong>and</strong> will pursue implementation ofthe research identified <strong>and</strong> prioritized by the TWGs <strong>and</strong> approved bythe Council.Background <strong>and</strong> Progress to Date:Plans:The four TWGs (Reservoir Mortality <strong>and</strong> Water Budget Effectiveness,Fish Disease, Hatchery Effectiveness, <strong>and</strong> Supplementation) submittedFive-Year Research Work Plans in 1987 or early 1988 for Councilreview <strong>and</strong> approval. BPA began funding projects from the Work Plansin late FY 1988.BPA plans to continue funding projects from the TWG Five-Year WorkPlans in FY 1991.1 2 5


1. RESERVOIR MORTALITY AND WATER BUDGET EFFECTIVENESSI. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES82-3 Magnitude <strong>and</strong> Dynamics ofPredator-Caused Mortality onHealthy Juvenile Salmonids inColumbia <strong>and</strong> Snake RiverReservoirs - USFWSProiect Officer: W. MaslenQbiectives: Determine theextent of predator-causedmortality on healthy vs.diseased, injured, <strong>and</strong> deadjuvenile salmonids <strong>and</strong> develop<strong>and</strong> evaluate prey protectivemeaures.Date initiated: 1983Results/Conclusions: An index forestimating consumption by squaw<strong>fish</strong>was refined, for use in combinationwith the abundance index (ProjectNo. 82-12) to determine the significanceof predation system-wide.Laboratory experiments on prey selectionwere conducted to develop experimentalprotocol for future prey selectionstudies.FY 1991: Continue prey selection experimentationin the laboratory <strong>and</strong> the field to determinerelationship between predation <strong>and</strong> prey condition<strong>and</strong> develop <strong>and</strong> evaluate prey protective measures(e.g., reducing predator-prey encounters, reducingpredator feeding deficiency, etc.).


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILEmNES82-12 Developing a Predation Index<strong>and</strong> Evaluating Ways to ReduceSalmonid Losses to Predationin the Columbia River Basin- DDFWProiect Officer: W. MaslenDbjectives:uate squawfniques.Develop <strong>and</strong> evalshharvest tech-Date initiated: 1983Results/Conclusions: An index forestimating abundance of squa<strong>fish</strong> wasrefined, for use in combination withthe consumption index (Project 82-3) todetermine the significance of predation.A plan was developed for step-wiseimplementation of commercial <strong>and</strong> sportreward <strong>fish</strong>eries on squaw<strong>fish</strong> on asystem-wide basis (Project 90-77).FY 1991 <strong>and</strong> beyond: Additional development ofsquaw<strong>fish</strong> harvest techniques are planned.83-319 Passive Int:e&grated Transponder(PIT) Tag Research - NMFSProiect Officer:Obiectives:D. Johnson1. Determine the biologicalfeasibility of injecting salmon<strong>and</strong> steelhead with PIT tagsfor passage <strong>and</strong> monitoringresearch activities.2. Determine biological <strong>and</strong>engineering feasibility of adult<strong>and</strong> smolt salmon <strong>and</strong> steelheaddetection facilities for passagemonitoring <strong>and</strong> research activities.Date initiated: 1983 1. FY 1991: BPA will fund the project throughResults/Conclusions: All data to dateshow that there are no biologicalproblems with the PIT tag. The detectionto completion.Biological studies are essentiallycomplete, <strong>and</strong> monitoring hardware continues to bedeveloped.systems <strong>and</strong> monitorings continue to be 2. Continuing: Contractor will finalize biologicalimproved <strong>and</strong> are working extremely well. studies <strong>and</strong> equipment development <strong>and</strong> provideAdult chinook salmon with PIT tags havebeen detected at Lower Granite Dam.evaluation reports <strong>annual</strong>ly.


PROJECTNUMBERP R O J E C T SCHFDULE AND MILESTONES87-413-1(TaskOrder97678)Fish Survival <strong>and</strong> SmoltPhysiology/Behavior Workshops- UW/BPNLt Officer: P. PoeDbiectiveL: Through the workshopprocess:1. Better define measurementsof salmon <strong>and</strong> steelhead smeltsurvival <strong>and</strong> smolt condition.2. Outline research needs.3. Present recommendations onhow to proceed with futuresurvival <strong>and</strong> smolt conditionresearch.4. Provide workshop results asone source of information toassist the Reservoir Mortality<strong>and</strong> Water Budget EffectivenessTechnical Work Group intheir development of a 5-yearWork Plan for mainstem passageresearch.Date Initiat.&: January 1989&ults/Concm: Proceedings fromSmolt Survival Workshop conducted Feb-ruary 1989 is available. Avenues ofresearch were identified to clarify <strong>and</strong>reduce uncertainty in survival estimates<strong>and</strong> their application in <strong>program</strong> evaluation.This project combines Project 89-50"Smoltification/Travel Time ResearchMethods Development Workshop," <strong>and</strong>Project 89-51, "Pool Survival ResearchMethod Development Workshop," that werelisted in the outline of the draft FY 1990AIWP.FY 1991: Conduct Smolt Physiology/BehaviorWorkshop that focuses on <strong>fish</strong> physiology <strong>and</strong>condition <strong>and</strong> its effect on downstream migrantbehavior.87-413-2(TaskOrder01772)Analysis of Historic Data forJuvenile <strong>and</strong> Adult Salmonids- uwProiect Officer: P. PoeDbiectives: Phase I of thiswork will assemble a data baseof statistically bounded estimatesof survival from smoltDate Initiatd: September 1989 1. FY 1991: Complete Phase I tasks: developResults/Conclusions: Report of Phase Iactivities available before end of 1990.criteria for decision to proceed to Phase II; beginPhase II if decision positive.2. FY 1992: Continue Phase II if positive resultsThis project combines Project 89-48, from evaluation of Phase I."Review <strong>and</strong> Synthesize Historical Data,"<strong>and</strong> Project 89-49, "Cohort Method <strong>and</strong>Analysis," that were listed in the outlineof the draft FY 1990 AIWP.


PROJECTNUMBER TITLE PROJECT STATUSSCHEDULF AND MILESTONES87-413-2 to adult <strong>and</strong> contribution ratescont.to ocean <strong>fish</strong>eries for ColumbiaRiver salmon <strong>and</strong> steelheadhatchery stocks based on thelast 15 years of Coded-Wire Tag(CWT) data. Phase II of thisresearch will consist of theanalysis of the adult production<strong>and</strong> survival data base createdin Phase I in relation to<strong>river</strong>ine factors that affectproduction <strong>and</strong> survival. PhaseII will be funded upon outcomeof Phase I.88-134 Evaluation of Factors Affecting Date Initiated: May 1988 FY 1991:Collection Efficiency Estimatesat McNary Dam - NMFSProiect Officer: P. PoeQbiectives: Assess potentialResults/Conclusions: Field data from of 1990.two years of research have been collected<strong>and</strong> analyzed. Recommendations to improvethe accuracy of estimates of collectionefficiency have been made, <strong>and</strong> whensources of error associated with implemented, will improve the precisionestimates of juvenile <strong>fish</strong> col- of daily <strong>fish</strong> passage estimates atlection efficiency <strong>and</strong> improvetechniques for estimating collectionefficiency at McNaryDam.Study will use PIT tagsto evaluate effects of <strong>fish</strong>origin, time of day of release,<strong>and</strong> the use of guided <strong>fish</strong> fortest <strong>fish</strong> on collection efficiencyresults.Columbia River dams.Project is scheduled forcompletion; final report by the end


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES88-141 Biological Manipulation ofMigration Rate <strong>and</strong> RecoveryRate - The Use of AdvancedPhotoperiod to AccelerateSmoltification in YearlingChinook Salmon - NMFSProiect Officer: W. MaslenDate Initiated: May 1988ResultsfConclusions: Advanced photoperiodtreatment in combination withholding <strong>fish</strong> in warmer water for aweek prior to release from DworshakHatchery results in a measurable decreasein travel time to Lower Granite,Little Goose, <strong>and</strong> McNary Dams. The 19881. FY 1991 <strong>and</strong> beyond: Anticipate advancedphotoperiod <strong>and</strong> temperature treatment experimentationat additional hatchery siteswith evaluation based on data from returningadults.2. Implement photperiod <strong>and</strong> temperature treatment,where practical, based on data fromreturning adults.Qbiectiveq: Determine the<strong>and</strong> 1989 Annual Reports are available.duration of exposure to advancedphotoperiod <strong>and</strong> temperature(before release fromthe hatchery) treatments tooptimize the migration rate ofyearling chinook through theSnake River <strong>and</strong> improve <strong>fish</strong>guiding efficiency at dams.Is089-107 Development of EpidemiologicalMethods for Use in QuantifyingSurvival Relationships fromPIT-Tag Releases of Salmon <strong>and</strong>Date Initiatd October 1989Results/Conclusions: None at this time.1. FY 1991: Complete Phase I tasks.2. FY 1991 <strong>and</strong> beyond: Proceed with Phase IIdependent upon the results of Phase I.Steelhead Smolts - UWProiect Officer: P. PoeDbiectives:1. Phase I: Develop epidemiologicalmodels <strong>and</strong> regressionestimators, tests of survivalrelationships, <strong>and</strong> tests ofassumptions <strong>and</strong> goodness-of-fitstatistics. Determine location<strong>and</strong> number of required PIT-tagfacilities.


PROJECTNUMBER TIT1 E PROJECT STATUSSCHEDULE AND MILESTONES89-107 2. Phase II: Develop samplecont.size calculations for PIT-tagrelease studies, conductcomputer studies of robustnessof models, develop alternativescenarios for PIT-tag studies,<strong>and</strong> develop computer package forstatistical design <strong>and</strong> analysis.90-77 Development of a System-Wide Date Initiated: April 1990 FY 1991: Implement squaw<strong>fish</strong> management in the(formerly Predator Control Program - ODFWLower Columbia River. Conduct indexing of the89-28) Results/Conclusions: Indexing of the significance of predation in the Snake RiverProiect Officer: W. Maslen significance of predation was conducted (Ice Harbor to Hell's Canyon Dam.)in the Lower Columbia River (BonnevilleQbiectives: to Ice Harbor Dam.) A pilot test <strong>fish</strong>- FY 1991 <strong>and</strong> beyond: Continue implementation <strong>and</strong>1. Determine the significance was initiated in the John Day Reservoir evaluation of system-wide squaw<strong>fish</strong> managementof predation in Columbia River to evaluate the feasibility of commer- <strong>program</strong>.reservoirs through implementa- <strong>and</strong> sport reward <strong>fish</strong>eries. Baselinetion of indexing of predator data were collected for evaluation ofabundance <strong>and</strong> integration with squaw<strong>fish</strong> management.consumption indices.2. Implement a squaw<strong>fish</strong>management development plan,beginning with a test <strong>fish</strong>eryin the John Day Reservoir in1990.3. Implement an evaluation ofthe Squaw<strong>fish</strong> Management Program.


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES90-78System-Wide Significance ofDate Initiated: March 1990FY 1991: Conduct indexing of the significancePredation on Juvenile Salmonidsof predation in the Snake River (Ice Harbor toin Columbia <strong>and</strong> Snake RiverResults/Conclusions: Indexing of theHell's Canyon Dam).Reservoir - USFWSsignificance of predation was conductedin the Lower Columbia River (BonnevilleFY 1991 <strong>and</strong> beyond: Continue to assist ODFWProiect Officer: W. Maslento Ice Harbor Dam).in the implementation of the squaw<strong>fish</strong> management<strong>program</strong>.Qbiectives:1. Index predator consumptionrates of juvenile salmonids inreservoirs throughout ColumbiaRiver Basin.2. Assist ODFW (Project 90-77)to index predator abundance,integrate predator abundance<strong>and</strong> consumption indices toestimate system-wide losses ofjuvenile salmonids to predators,<strong>and</strong> synthesize data to developsystematic approach for implementationof squaw<strong>fish</strong>management <strong>and</strong> evaluation ofthat <strong>program</strong>.86-118(TaskOrder 10)Feasibility of Satisfying Date Initiated: September 1990 FY 1990: Initiate project; assemble a multi-Model Assumptions of thedisciplinary team.Burnham <strong>and</strong> Anderson Fish Results/Conclusions: None at this time.Survival Estimation TechniquesFY 1991: Complete model evaluation; issuereport.Proiect Officer: P. PoeQbiectives:1. Evaluate the practicabilityof applying the Burnham <strong>and</strong>Anderson model to improveestimates of smolt survival


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES86-118in the Columbia River system.(Task2. Evaluate how the practicalOrder 10problems related to conductingcont.the survival experiments maylimit the ability to satisfythe model assumptions.III. NEW PROJECTSPROJECTNUMBER TITLE PROJECT STATUSSCHEDULE AND MILESTONES91-17 Investigation of Factors New ProjectAffecting Juvenile Wild SpringChinook Migration Above LowerGranite DamProiect Officer: P. PoeObjectives: Determine if thelow detection of PIT-taggedjuvenile spring chinook atLower Granite Dam (LGR) is afunction of the effects ofpoor reservoir conditions,e.g., disease, predation, flow,swimming behavior, smoltcondition, <strong>and</strong> stage ofdevelopment.1. FY 1991: Literature review <strong>and</strong> studydesign. Study design contingent upon resultsof literature review.2 . . FY 1992 <strong>and</strong> beyond: (a) Trap <strong>and</strong> PIT-tagjuvenile wild spring chinook above LGR.(b) Determine recovery rate of juvenile wildspring chinook at LGR. (c) Determine recoveryrate of adult wild spring chinook to LGR.


PROJECTNUMBER TITLE PROJECT STATUSSCHEDULE AND MILESTONES91-28 PIT-Tagging of Wild Spring New ProjectChinook in Idaho <strong>and</strong> OregonFY 1991: Start project.Project Officer: TBAObiectives: Assess the migrationalcharacteristics ofwild/natural parr in selectedstreams above Lower GraniteDam in Idaho <strong>and</strong> Oregon duringthe summer/fall (markingphase). During the recoveryphase the following spring,actual characteristics willbe established at PIT-tagrecovery sites.[Note:As the FY 1991 AIWP went to press, the following project was still under review by the PRG. Implementation in FY 1991 iscontingent upon the results of this review <strong>and</strong> BPA decision.]91-29 Early Life History Requirements New Projectof Subyearling ChinookSalmon in the Columbia RiverBasinFY 1991: Start project.Project Officer: TBAObiectives:1. Identify <strong>and</strong> estimatethe influence of environmental<strong>and</strong> biological factors whichstimulate <strong>and</strong> control season-


PROJECTNUMBER TITLE PROJECT STATUSSCHEDULE AND MILESTONES91-29 al migratory behavior of(cont.) subyearling chinook salmon,such as water temperature,flow, growth rate, <strong>and</strong>physiological development.2. Determine location <strong>and</strong>success of summer <strong>and</strong> fallchinook spawning in ColumbiaRiver Basin impoundments.3. Describe physical <strong>and</strong>biological requirements ofsubyearling summer <strong>and</strong> fallchinook salmon to successfullyrear in Columbia RiverBasin impoundments.


2. FISH DISPASFI. COMPLFTED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES88-152 Infectious HematopoieticNecrosis (IHN) VirusResearch - OSUProject Officer: R. MorinakaDate Initiat&: May 1989Results/Conclusions: None at thistime.1. Year 2: Identify sources <strong>and</strong>reservoirs of IHN virus.2. Year 3: Compare pathogenicityof 10 strains of IHN virus.Obiectives:1. To investigate <strong>and</strong> determinethe pathogenicity of IHN virusstrains in the Columbia River.2. To determine the mechanismof the location of IHN virusthroughout the life cycle ofrainbow trout <strong>and</strong> kokanee salmon.3. Year 4: Test sediment <strong>and</strong> nonsalmonid<strong>fish</strong> for sources ofhorizontal transmission.


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES89-31 Control of Bacterial KidneyDisease (BKD) via Segregationof Adult Spring Chinook <strong>and</strong>Summer Chinook Salmon withEnzyme-Linked ImmunosorbentAssay (ELISA) - OSUDate Initiated: December 1988 Year 2,3,4: Assay juvenile <strong>and</strong>adult salmon for levels of BKD.Results/w :None at this time. Segregate the gametes based upon BKDlevel. Determine quantitatively thelevels of BKD relative to progenylevels.Proiect Officer: R. MorinakaQbiectives:1. St<strong>and</strong>ardize reagents:a) antigenb) monoclonal antibodies2. Sample experimental <strong>fish</strong><strong>and</strong> quantify BKD levels inexperimental <strong>and</strong> productionsamples.3. Determine whether progeny'sBKD levels are influenced bythe parental BKD level.89-32 Registration of Erythromycin Date Initiated: March 1989 1. FY 1991: Complete tissue residue studies <strong>and</strong>-UIclinical field trials.Results/Conclusions: None at this time.Proiect Officer: R. Morinaka2. FY 1992: Complete field trials <strong>and</strong> determineenvironmental fate.Qbiectives:1. Analyze existing data onerythromycin.2. Develop additional analyticaldata required by theFood <strong>and</strong> Drug Administration(FDA) for drug registration.3. Work with appropriatesponsor for erythromycin registration.4. Conduct field studies todevelop data to support theregistration application.3. FY 1993: Submit registration package to FDA.


PROJECTNUMBER TITLE PROJFCT STATUSSCHEDULE AND MILESTONES89-32 5. Determine levels <strong>and</strong> dosage(cont.) for oral <strong>and</strong> injectable formsof erythromycin.6. Determine tissue residues.7. Complete registration packagefor FDA.89-40 Analytical Methods for Malachite Date Initiated: December 1988Green - USFWSProiect Officer: J. BauerObiectivel: Accurately determineall three forms of malachitegreen (vernal-leukocarbinolanalogs). Definedetection limits within 10 ppbor less.89-54 Research to Identify EffectiveAnti-Fungal Agents - USFWSProject Officer: R. AustinQbiectives:1. Identify <strong>and</strong> test alternateanti-fungal agents that cansafely replace malachite greenfor the control <strong>and</strong> treatmentof fungal infections on eggs,juveniles, <strong>and</strong> adult springchinook.2. Evaluate test results <strong>and</strong>rank order tested agents, basedon safety <strong>and</strong> effectiveness onspring chinook eggs <strong>and</strong> adults.3. Recommend alternative antifungalagent for U.S. Food <strong>and</strong>Drug Administration registrationfor use on food <strong>fish</strong> <strong>and</strong> eggs.Results/Conclusions: Literature searchon methods for analysis has been done.The selectivity of High PressureLiquid chromatography is being investigated.Date Initiated: September 1989Results/Conclusions:1. List of ten alternative anti-fungalagents selected for testing on salmonideggs. Selection criteria based uponfungicidal activity of agents from invitrotest results.2. Testing initiated on salmonid eggs.1 FY 1990: Test existing analytical methods formeasuring malachite green analogs in water.Determine if developed method will accurately detectmalachite green levels at 10 ppb or less.2. FY 1991: Prepare final report.1. FY 1990: Identify <strong>and</strong> test anti-fungalagents on eggs, juveniles, <strong>and</strong> adult springchinook.2. FY 1991: Continue testing anti-fungal agentson adult spring chinook; evaluate safety ofalternative agents tested.3. FY 1991: Evaluate test results <strong>and</strong> recommendalternative anti-fungal agent having best potentialfor U.S. Food <strong>and</strong> Drug Administration registration.


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULF AND MIIFSTQNFS89-81-2 Erythrocytic Inclusion BodySyndrome (EIBS) Research - OSUProiect Officer: R. MorinakaDate Initiated: September 1989 1. 1991: Analyze impact on survival.Results/Conclusions: None at this time. 2. 1992: Determine effect of water temperatureon transmission.Ubiectives:1. Determine epizootiology ofEIBS virus including susceptibility<strong>and</strong> modes of transmission.2. Assess relationship betweenEIBS <strong>and</strong> other <strong>fish</strong> pathogensrelative to immunosuppression.3. Develop more accurate <strong>and</strong>efficient methods to detect theearly stages of the syndrome.90-61 Research on Fungal Infectionsof Spring <strong>and</strong> Summer ChinookSalmonProiected to start: FY 1990FY 1990: Start project.Proiect Officer: A. RugerUbiectives:1. Isolate <strong>and</strong> identify fungispecies infecting spring chinooksalmon.2. Develop culture maintenancemethods <strong>and</strong> develop protocol foridentifying the isolated fungispecies <strong>and</strong> strains.


III. NEW PROJECTSPROJECTNUMBER TITLE PROJECT STATUS91-22 Hatchery Sorting for Bacterial New ProjectKidney Disease (BKD)SCHEDULE AND MILESTONESFY 1991: Start project.Proiect Officer: TBAs=0Objectives:1. Transfer the present BKDdetection technology to thehatchery system.2. Demonstrate that segregationof progeny by BKD infectionlevels will increasethe quality of the smolts beingreleased <strong>and</strong> positively affectadult returns.3. Analyze the data generatedby this research to evaluate theimpact of BKD on hatchery-rearedspring chinook salmon <strong>and</strong> assessthe benefits of a segragation<strong>program</strong>.91-23 Ectoparasite Research New ProjectProiect Officer: R. MorinakaObjectives:1. Review literature to findefficacious chemoterapeutants.Determine life cycle relativeto temperature.2. Determine effects of parasiteload on sea water acclimation.3. Determine host resistancemechanisms.Year 1: Review veterinary chemotherapy. Initiatehost resistance study.Year 2: Find the effects of parasite load onsea water acclimation. Compare potential new drugs<strong>and</strong> chemicals with formalin.Year 3: Determine the non-specific <strong>and</strong> specificimmunity mechanisms via acclimation.


PROJECTNUMBER TITLE PROJECT STATUSSCHEDULE AND MILESTONES90-25 Ceratomvxa Shasta Control New ProjectProiect Officer: R. MorinakaObjectives:1. Determine if freshwaterclams are essential forC. Shasta.2. Identify infectious unit.3. Develop new serologicalreagents.4. Determine route of transmission.1. Expose <strong>fish</strong> to clams from C. Shasta endemicareas.2. Develop monoclonal antibodies to recognizeC. Shasta life stages.3. Test invertebrates, identify infectiousstage, <strong>and</strong> describe.4. Expose gill, skin, <strong>and</strong> gut to determine majorroutes of transmission.91-26 Bacterial Coldwater Disease New Project Year 1: Initiate review of available drugs/chemicals(BCWD) Researchfor control.Proiect Officer: R. MorinakaObjectives:1. Screen efficacious therapeutantsfor BCWD.2. Develop serological techniquesfor rapid identification.3. Conduct demonstrationprojects to determine effectivenessof certain <strong>fish</strong> culturaltechniques.4. Determine if disease isvertically transmitted.Year 2: Select strains <strong>and</strong> seriological techniquesto be used.Year 3: Construct vertical transmission studies.Year 4: Determine best preventive measures.


PROJECTYUMBER TITLE PROJECT STATUS /SCHEDULE AND MILESTONES91-31 Infectious Hematopoietic New ProjectNecrosis Virus (IHNV) VaccineFY 1991:Start project.Proiect Officer: TBAObjectives:1. Test vaccine at several<strong>fish</strong> culture facilities <strong>and</strong>with different species of <strong>fish</strong>.2. Develop a multivalentvaccine against IHNV.3. Determine effectivenessof vaccine in preventingtransmission of IHNV inbroodstock <strong>fish</strong>.


3. HATCHERY EFFECTIVENESS1, COMPLETED PROJECTSPROJECTNUMBER TITLE PROJECT STATUS86-118 Hatchery Effectiveness Date Completed: May 1990(TaskTechnical Working GroupOrder 8) Workshop/Retreat - BPNL Results/Conclusions: The retreat metProiect Officer: R. AustinQbiectives:1. Improve the effectivenessof the HETWG through clarifyingits role <strong>and</strong> developing proceduresfor its operation.2. Develop an action plan forrevision of their currentresearch plan.its objectives of providing a forum forfor discussion of group process <strong>and</strong>development of an action plan for revisingthe current five-year researchplan. Bylaws developed during the retreatwere adopted at the February 1990HETWG meeting. BPNL staff attended thethe March 1990 HETWG meeting as a followupto the January retreat. Theycritiqued the meeting <strong>and</strong> facilitatedgroup discussion of "well done's" <strong>and</strong>"opportunities for improvement." Finalreport received April 1990.86-118 Volitional <strong>and</strong> Serial Release(TaskOrder 9)Workshop - BPNLProiect Officer: J. Bauerwectives:1. Review existing st<strong>and</strong>ardsused for release strategies.2. Identify new approaches,feasibilities, <strong>and</strong>/or equipmentfor improving releasestrategies.3. Agree on st<strong>and</strong>ards forfuture release studies.4. Recommend strategies foruse.Date: June 1990Results/Conclusions: The workshopproduced ranked research recommendations,a list of release practices to improvehatchery effectiveness, <strong>and</strong> generalcomments about hatchery effectivenessresearch. Final report with recommendationsdue June 1990.


PROJECTNUMBER TITLE PROJECT STATUS89-45 Assess Present AnadromousProduction Facilities inthe Columbia River Drainage-NMFS.Project Officer: J. BauerProjected Completion: July 1990Results/Conclusions: None at thistime. Final report scheduled forcompletion in July 1990.Objectives: This project willcomplement completed Project84-51 in providing accurateexisting hatchery capacities,theoretical capacities, <strong>and</strong>expansion potentials forColumbia River hatcheries.II.FY 1990 ONGOING PROJECTS-LPPPROJECTNUMBERTITLE88-160 Bioengineering Evaluation ofRetrofitted SupplementalOxygen for Rearing SpringChinook - ODFWProiect Officer: A. RugerPROJECT STATUSSCHEDULE AND MILESTONESDate Initiated: September 1988 1. 1994: Begin recovering <strong>and</strong> decoding tags fromreturning adults.Results/Conclusions: None at this time.2. June 2000: Complete data analysis. Completefinal report.Obiectives:1. Rear spring chinook underexperimental conditions;tag <strong>fish</strong>: monitor <strong>fish</strong>health/quality.2. Recover <strong>and</strong> decode tagsfor returning adults.3. Analyze <strong>and</strong> summarizeall data.4. Transfer technologyto user groups.5. Write final report.


PROJECTNUMBER TITLE - PROJECT STATUS - SCHEDULE AND MILESTONES88-160-Z Engineering Consultation/ Date Initiated: August 1989 1. August 25, 1989: Complete evaluation ofAssistance on Project 88-160proposed water quality monitoring methods in- Consultant Results/Conclusions: None at this time. project operation manual.Project Officer: G. BouckObiectives: Conduct engineeringevaluations associated withProject 88-160.2. October 1, 1989: Evaluate <strong>and</strong> modifyoxygen contactor <strong>and</strong> supply system.3. Draft a plan for engineering evaluation ofthe project.4. Continuing: Attend quarterly meetings ofsteering committee.88-163 Effects of Coded-WireTagging on the Survivalof Spring Chinook Salmon - WDFProiect Officer: A. RugerQbiectives:1. Mark entire production ofeach of three hatcheries withotolith marks <strong>and</strong> mark aportion of the production withcoded-wire tags.2. Repeat procedure for threebrood-years at each facility.3. Determine difference insurvival rates between codedwiretagged <strong>and</strong> untagged groups.Date Initiated: January 1, 1989Results/Conclusions: First brood year<strong>fish</strong> were otolith marked in winter1989-90. Coded-wire tagging of firstyear <strong>fish</strong> completed.1. October 1990: Begin otolith marking of secondbrood year <strong>fish</strong>.2. September 1993: Begin samplingotoliths from adults.3. June 30, 1997: End of project: finalreport completed.


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES89-30 Evaluation of Pre-ReleaseTemperature Acclimation at"Ground Water" Hatcheries - WDFProiect Officer: A. RugerQbiectives:1. To provide Klickitat Riveracclimation water to the KlickitatHatchery site.2. Compare the performance(survival of adults to hatcheryrack) of spring chinook smoltsraised in <strong>and</strong> released directlyfrom a groundwater suppliedhatchery to smolts released fromthe same hatchery following acclimationwith the ambienttributary receiving water for aperiod of time before release.Date Initiated: July 1989 1. July 1, 1989 - June 30, 1990: Feasibility<strong>and</strong> engineering studies <strong>and</strong> construction toResults/Conclusions: First objective is provide <strong>river</strong> water to the hatchery site.complete <strong>and</strong> BPA is reviewing constructiondocuments <strong>and</strong> budget. Work on 2. September 1990: Start coded-wire tagObjective 2 pending this review. <strong>fish</strong> for 4 years.3. August 1992: Start sampling coded-wiretags for 5 years.4. June 30, 1998: Final report <strong>and</strong> projectcompletion.89-46 Spring Chinook Smelt QualityAssessment - NMFSProinct Officer: R. Austinmectiva:1. Select <strong>and</strong> monitor <strong>fish</strong>quality at four hatcheries.2. Correlate these data withoverall survival of the releasedgroups (total contribution).3. Determine suitability ofsmolt quality indices <strong>and</strong>other physiological parametersfor assessing <strong>fish</strong> quality <strong>and</strong>improving hatchery effectiveness.Date Initiated: February 1989Results/Conclusions:1. Sampling during the first year atfour hatcheries indicated that most <strong>fish</strong>were released prior to the initiation ofthe smoltification process.2. Sampling is continuing.3. Developed plan for monitoring physiologicalparameters of wild smolts.1. FY 1990: Characterize physiological parametersfor wild spring chinook in at least three sub<strong>basin</strong>s;continue monitoring of hatchery smolts.2. FY 1991: Continue monitoring wild <strong>and</strong> hatcherysmolts.3. FY 1992: Complete monitoring of smolt qualityparameters.4. FY 1993-1996: Recovery of adult returns.5. FY 1996: Recovery of adult <strong>fish</strong> complete; finalreport written.


PROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES89-65 Coded-Wire Tag Evaluation ofMissing Hatchery Groups - USFWSProject Officer: J. BauerDate Initiated: November 1989 FY 1991: Project ends on October 31, 1990.ResultsKonclusim: All groups forFY 1990 have been tagged.1. Identify missing productiongroups of salmon for ColumbiaRiver hatcheries.2. Recover, decode <strong>and</strong> recordsurvivability data.3. Evaluate hatchery production<strong>program</strong>s.89-66 Coded-Wire Tag Evaluation ofMissing Hatchery Groups - WDFProject Officer: J. BauerBbiectives:1. Identify missing productiongroups of salmon for ColumbiaRiver hatcheries.2. Recover, decode <strong>and</strong> recordsurvivability data.3. Evaluate hatchery production<strong>program</strong>s.Date Initiated: September 1989 FY 1991: Project ends on September 30, 1991.Results/Conclusions: All <strong>fish</strong> groupsscheduled for tagging in 1989-90 werecompleted. Groups for 1991 will betagged with FY 1990 dollars on h<strong>and</strong>.


PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES89-69 Coded-Wire Tag Evaluation of Date Initiated: September 1989 FY 1991: Project ends on September 30, 1991.Missing Hatchery Groups - ODFWProject Officer: J. BauerQbiectives:1. Identify missing productiongroups of salmon for ColumbiaRiver hatcheries.2. Recover, decode, <strong>and</strong> recordsurvivability data.3. Evaluate hatchery production<strong>program</strong>s.ResultsK~clusi~: All <strong>fish</strong> groupsscheduled for tagging in 1989-90 werecompleted. Groups for 1991 will betagged with FY 1990 dollars on h<strong>and</strong>.89-81-3 Modeling Optimized HatcheryProduction - OSUProject Officer: R. AustinQbiectives:1. Develop a computerizedmodel for defining <strong>and</strong> solvingthe problems of optimizinghatchery production of anadromoussalmonids.2. Test the model by applyingto actual hatchery situations.3. Calibrate <strong>and</strong> apply the modelto specific hatcheries.4. Use model as a tool towardsoptimizing the hatchery productionsystem <strong>and</strong> to identifyareas where further research isnecessary.Date Initiated: September 1989 1. 1990: Model DevelopmentResults/Conclusions: 2. 1991: Model Testing <strong>and</strong> RefinementContacts established with <strong>fish</strong>eriesagencies <strong>and</strong> Tribes to form a project 3. 1992: Model Application: final producttask force of hatchery biologists toassist in the development <strong>and</strong> testingof the hatchery model.will include full documentation of software.


PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILFSTONFS89-81-4 Survey of Research <strong>and</strong> Research Date Initiat&: September 1989 1. Literature <strong>and</strong> research review. NineImplementation - Consultantmonths post-award.Results/Cm: None at thisProiect Officer: A. Ruger time. 2. Agency interviews complete. Ten monthsQbiectives:post-award.1. Propose to 8PA methods <strong>and</strong> 3. Completion report with final reconnnendations.approaches necessary to surveyPacific Northwest agencies involvedin salmon/steelheadresearch.2. Upon approval conductsurvey of projects in progress.3. Report results of unpublishedresearch.4. Determine why researchwas not implemented.Eighteen months post-award.III. NEW PROJECTSNone.


4. SUPPLEMENTATIONI. COMPLETED PROJECTSPROJECTNUMBER TITLE PROJECT STATUS88-100 Analysis of Past <strong>and</strong> Present Proiected Comoletion: August 1990Salmon <strong>and</strong> SteelheadSupplementation in theNorthwest United States - Results/Conclusions: None at thisUSFWStime. Draft report availablelate May or early June 1990. FinalProiect Officer: T. Vogel completion report due August 1990.Qbiectives:1. Summarize <strong>and</strong> evaluatepast <strong>and</strong> current supplementationof salmon <strong>and</strong> steelhead.2. Develop a qualitative "model"of factors affecting the resultsof supplementation.3. Develop recommendations forfuture supplementation needs <strong>and</strong>future opportunities.


II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJFCT STATUS SCHEDULE AND MILESTONES89-96 A Genetic Monitoring <strong>and</strong> Evalua- Pate Initiated: September 1989 September 1992: Evaluate Projecttion Program for Supplemental<strong>and</strong> determine desirability to continue.Populations of Salmon <strong>and</strong>Steelhead in the UpperColumbia River Basin - NMFSResults/ConclusictDs: None at this time.Proiect Officer: T. VogelQbiectives:1. Evaluate the nature <strong>and</strong>extent of genetic changes inhatchery stocks to be used forsupplementation.2. Quantify the genetic impactof supplementation on targetednatural stocks <strong>and</strong> non-targetedwild stocks.89-97 Evaluation of the Success of Date Initiated: September 1989 1. December 1990: Review experimental designSupplementing Imnaha River<strong>and</strong> management agreements.Summer Steelhead with Hatchery- Results/Conclusions: None at this time.Reared Smolts <strong>and</strong> Assessment of 2. March 1991: Start Phase II, Experimentation.the Effect on Natural ProductionPerformance, Life HistoryCharacteristics, <strong>and</strong> GeneticCharacteristics - ODFWProject Officer: T. VogelQbiectives:1. Determine the effects onnaturally produced <strong>fish</strong> due topredation by hatchery <strong>fish</strong> <strong>and</strong>competition for food <strong>and</strong> spacebetween naturally produced <strong>fish</strong><strong>and</strong> hatchery <strong>fish</strong>.


PROJECTNUMBER TITLE PROJECT STATUS89-97cont.89-982. Determine the effects onindigenous stock productivitythat result from hatchery adultsinterbreeding with indigenouswild <strong>fish</strong>.3. Determine the effects of supplementationwith hatchery <strong>fish</strong>of indigenous stock.. .Determination of Effectiveness Pate Initiated : September 1989 1. December 1990: Review experimental designof Supplementation Strategies<strong>and</strong> Assessment of Interactionbetween Supplemental HatcheryChinook Salmon on NaturalPopulations in the Salmon,Snake, <strong>and</strong> Clearwater Rivers inIdaho - IDFGResults/Conclusim: None at this time.<strong>and</strong> management agreements.2. March 1991: Start Phase II, Experimentation.Proiect Officer: T. VogelQbiectives:1. Determine the effects ofoutplanting different life stagesof spring <strong>and</strong> summer chinookon natural <strong>fish</strong> production.2. Determine effectiveness ofsupplementation in building selfsustainingnatural runs of thespecies.3. Develop guidelines for futuresupplementation in terms of size<strong>and</strong> time of release.


III. NEW PROJECTS[As the FY 1991 AIWP went to press, the three projects listed below were still under review by the PRG.]PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES90-52 Performance/Stock Productivity New ProjectImpacts of Hatchery Supple-mentation.FY 1991: Start project.Proiect Officer: T. VogelQbiectives: Develop genericallyapplicable model using appropriate<strong>fish</strong> stock.90-53 Southeast Washington Species New ProjectInteraction StudyFY 1991: Start project.Proiect Officer: T. VogelObiectives:1. Determine inter-specific<strong>and</strong> intra-specific competition<strong>and</strong> predation among springchinook, summer steelhead, <strong>and</strong>resident trout.2. Determine magnitude <strong>and</strong>impact of residualization onwild stocks <strong>and</strong> supplementation<strong>program</strong>s.


PROJECTNUMBER TITLE PROJFCT STATUS SCHEDULF AND MIl&SXJN)N90-55 Effectiveness of Supplementa- New Projecttion Strategies <strong>and</strong> Assessmentof Interactions BetweenWild/Natural <strong>and</strong> HatcheryStocks of Summer Steelheadin Idaho.FY 1991: Start project.Proiect Officer: T. VogelUbiectives: Evaluate existingSupplementation <strong>program</strong>s forstock performance characteristics.


6 . 36.3 DATA COLLECTION FOR HATCHERY DATA BASE(Fund in Response to System Monitoring <strong>and</strong> Evaluation Work GroupProposals)206(e)(l)Hatchery Data Base. BPA shall fund collection of Columbia RiverBasin hatchery data for anadromous <strong>fish</strong>. Data to be collected,format, <strong>and</strong> schedules shall be determined by the work group onimproving hatchery production (described above), working inconjunction with the work group on system monitoring <strong>and</strong>evaluation (described above>. These data shall include, at aminimum: numbers of returning adults; disposition of returningadults; source <strong>and</strong> description of brood stock; actions taken tomaintain genetic diversity; <strong>and</strong> size, location, <strong>and</strong> time ofrelease of juvenile <strong>fish</strong>. Data collected shall be stored in theCouncil's anadromous <strong>fish</strong> data base.ACTION ITEM ACTIVITY SUMMARY:Objectives:To develop <strong>and</strong> implement the Hatchery Data Base.Background <strong>and</strong> Progress to Date:Plans:Projects:The scoping of the CIS in FY 1990 <strong>and</strong> 91 (Project 88-108-l) willprovide overall guidance for development of the Hatchery Data Base,as well as the Natural Production Data Base.The Hatchery Data Base will be designed as part of the CIS project(Project 88-108-l).None at this time.1 5 5


6.46.4 DATA COLLECTION FOR NATURAL PRODUCTION DATA BASE(Fund in Response to System Monitoring <strong>and</strong> Evaluation Work GroupProposals)206(e)(2)Natural Production Data Base. BPA shall fund collection ofinformation on the natural production of anadromous <strong>fish</strong> in theColumbia River Basin. Data to be collected shall include, at aminimum: adult escapement, redd counts, <strong>and</strong> juvenile migrationfor key index streams in the Columbia River Basin. The keyindex streams shall be consistent with any key index streamsidentified through the U.S./Canada Pacific Salmon Treaty <strong>and</strong>other planning processes. Data collected shall be stored in theCouncil's anadromous <strong>fish</strong> data base.ACTION ITEM ACTIVITY SUMMARY:Objectives:To develop <strong>and</strong> implement the Natural Production Data Base.Background <strong>and</strong> Proqress to Date:Plans:Projects:The scoping of the CIS in FY 1989 (Project 88-108-l) provided overallguidance for development of the Natural Production Data Base, as wellas the Hatchery Production Data Base. IDFG has the lead incoordination <strong>and</strong> development of the Natural Production Data BaseTechnical Work Statement by the Council's MEG. No work ondevelopment planned during FY 1990-91. CIS will be designing thedata base during FYs 1991 <strong>and</strong> 1992.Following approval of the Work Statement by the MEG <strong>and</strong> CBFWA, BPAmay be asked to fund a Natural Production Data Base project inFY 1992.None at this time.157


6.56.5 HIGH PRIORITY PROJECTS IN AREAS OF EMPHASIS(Fund Only These in FY 1987)206(b)[Abstract] This measure directs BPA to focus its funding ofsalmon <strong>and</strong> steelhead research in the next five years in the fourareas of emphasis.ACTION ITEM ACTIVITY SUMMARY:Objectives:To fund only high priority projects in the areas of emphasis duringFY 1987.Background <strong>and</strong> Proqress to Date:Plans:Projects:One project, a demonstration of a system for removing malachite greenfrom hatchery effluent (Project 87-4211, was identified by theagencies <strong>and</strong> Tribes as sufficiently important to merit priorityfunding in FY 1987. The FDTWG strongly supported this project <strong>and</strong>requested that it be funded immediately. BPA initiated Project87-421 in FY 1987; the project was completed in FY 1989.Action Item 6.5 has been completed.None.1 5 9


6.106.10 SYSTEM MONITORING AND EVALUATION(Coordinated Information System)206(d)(2)(c) [Abstract] The Council's system monitoring <strong>and</strong> evaluation<strong>program</strong> will include development of a coordinated informationsystem designed to facilitate effective exchange <strong>and</strong>dissemination of <strong>fish</strong>eries data.ACTION ITEM ACTIVITY SUMMARY:Objectives:To fund development <strong>and</strong> operation of SMEP.Background <strong>and</strong> Proqress to Date:Plans:In FY 1988, BPA began funding Project 88-108-l to develop the CIS tocontribute to the SMEP. Projects 88-108-2 <strong>and</strong> 89-104 began inFY 1989.BPA will continue to fund the three ongoing projects throughcompletion.1 6 1


I. COMPIETED PROJFCTSNone.II. FY 1990 ONGOING PROJECTSPROJECTFlUMEW TITLE PRQJFCT STATUSSCHFOULF AND -ES88-108-lCoordinated InformationSystem (CIS) - PSMFC. .nitTat&: January 1989 FY 1990: Complete Phase I.Proiect Officer: S. Detering Results/Conclusions: Objectives 1 & 2Qbiectives:& 3 are completed. CIS Team hasprovided guidance for development of1. Select project team stock assessment <strong>and</strong> the Hatchery <strong>and</strong>2. Conduct project orientation Natural Production Data Bases.3. Complete scoping for CISdevelopment (Phase I)4. Complete CIS application <strong>and</strong>prototype development <strong>and</strong>watershed classification <strong>and</strong>stock analysis (Phase II)5. Complete CIS Final Report,Watershed Classification FinalReport, <strong>and</strong> Stock AnalysisReport (Phase III)FY 1991: Complete Phase II.FY 1992: Complete Phase III.88-108-2 EPA/USGS Mapping System for Date Initiated: October 1989 October 1990: Complete data base for Oregon <strong>and</strong>Coordinated InformationMontana.System (CIS) - USGS ResultsKonclusionr: None at thistime.Proipct Officer: T. PanskyDbiectives:1. Complete regional digitalhydrographic data base atl:lOO,OOO scale for use in CIS.2. Enhance current EPA/USGSmapping system.


PROJECTNUMBER TITLE PROJECT STATUSSCHEDULE AND MILESTONES89-104 Historical Data Base- USFS/PNWRSProiect Officer: S. DeteringQbjectivs: Archive summaries<strong>and</strong> raw data from originalBureau of Fisheries habitatsurveys of the Columbia River<strong>and</strong> tributaries. Publishsummaries in book form by sub<strong>basin</strong>. .Pate Initi&ed : FY 1989time.lusiom: None at thisFY 1990: Microfiche original field notes <strong>and</strong>prepare notes for data base management system.FY 1990 to FY 1993: Produce a data base managementsystem for historical stream inventorieswhich is integrated with CIS protocols for sub<strong>basin</strong>stream inventory data. Edit <strong>and</strong> produceColumbia Basin stream inventory for areas above<strong>and</strong> below Bonneville Dam.FY 1993: Project scheduled for completion.III. NEW PROJECTSNone.


COORDINATION ACTION ITEMS1 6 5


6.126.12 CONTINUING COORDINATION AND CONSULTATION(By All Federal Project Operators/Regulators)1203(c) [Abstract] The Federal project operators <strong>and</strong> regulators shall workwith the agencies <strong>and</strong> Tribes to comply with theconsultation/coordination requirements of the Act. The Councilexpects research planning consultation to occur among agencies,Tribes, <strong>and</strong> project operators <strong>and</strong> regulators. The Council willencourage improved coordination of <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> efforts byconsulting with the <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> agencies, Tribes, projectoperators <strong>and</strong> regulators, BPA customers, Federal <strong>and</strong> state water <strong>and</strong>l<strong>and</strong> management agencies, irrigation districts, academic experts, <strong>and</strong>interested citizens groups.ACTION ITEM ACTIVITY SUMMARY:Objectives:In conjunction with the Council <strong>and</strong> the Ad-Hoc Roles Committee ofCBFWA, BPA has participated in the development of a formal processthrough which BPA <strong>and</strong> the Fish <strong>and</strong> Wildlife agencies <strong>and</strong> Tribesjointly plan! <strong>and</strong> BPA subsequently implements, the Fish <strong>and</strong> WildlifeProgram. This process provides for the involvement of the region'sFish <strong>and</strong> Wildlife agencies <strong>and</strong> Tribes at relevant decision-makingpoints <strong>and</strong> should improve coordination <strong>and</strong> consistency between BPA'simplementation actions <strong>and</strong> the agencies' <strong>and</strong> Tribes' existing <strong>and</strong>future management activities.Background <strong>and</strong> Progress to Date:Plans:In early April 1987, BPA staff began meeting with Council staff <strong>and</strong>an ad-hoc committee of CBFWA. The meetings focused on explainingBPA's process for implementing the Program, from inception throughcompletion. Participants agreed to continue discussion, with a goalof developing a collaborative <strong>and</strong> cooperative process through whichBPA would plan <strong>and</strong> implement the Program. As a result of thesediscussions, an Implementation Planning Process (IPP) was developed(see Section III of the AIWP).The IPP was endorsed by the BPA Administrator <strong>and</strong> the CBFWA Chairmanon October 19, 1988. The IPP's Policy Review Group (PRG) was formedin late 1988. In January 1989, the PRG began providing BPA withpolicy <strong>and</strong> funding recommendations related to Programimplementation. The PRG continues to serve a forum for policycoordination <strong>and</strong> consultation among BPA, <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> agencies,Tribes, utility interests, Council, <strong>and</strong> other interested parties.The AIWP is based on the outline developed by the PRG during Step 1of the <strong>annual</strong> IPP cycle.BPA plans to continue to use the IPP as a coordination <strong>and</strong>consultation mechanism <strong>and</strong> to develop the AIWP.1 6 7


RESIDENT FISH ACTION ITEMS AND TECHNICAL SUBJECTS1 6 9


7.17.1 COLVILLE HATCHERY(Complete Construction: March 1989)(Fund Operation <strong>and</strong> Maintenance>903(g)(l)(A) [Abstract] Design, construction, operation <strong>and</strong> maintenance of aresident trout hatchery on the Colville Indian Reservation. TheCouncil expects that state-of-the-art technologies will be usedin the design of the hatchery.ACTION ITEM ACTIVITY SUMMARY:Objectives:To design <strong>and</strong> construct a resident trout hatchery on the ColvilleIndian Reservation to mitigate partially for anadromous <strong>fish</strong> lossesfrom hydroelectric development <strong>and</strong> operation.Background <strong>and</strong> Progress to Date:Plans:The primary purpose of the hatchery is to produce trout to stocklakes <strong>and</strong> streams on the Reservation. The Colville ConfederatedTribes (CCT> received the construction contract for the hatchery.The final design for the hatchery was completed in October 1987.Construction began in July 1988 <strong>and</strong> was completed in fall 1989.BPA is funding the operation <strong>and</strong> maintenance of the facility by theCCT.171


I. COMPLETED PROJECTSNone.Y1I.F 1PROJECTNUMBERTITLEPROJECT STATUS85-38 Colville Hatchery - CCTProject Officer: J. MarcotteUbiectives: Design <strong>and</strong>construct a resident trouthatchery on the Colville IndianReservation.Date initiated: 1985Results/Conclusions: Design completedin FY 1987. Construction contractinitiated July 1988. Completedconstruction of 50,000 pound trouthatchery in September 1989.Continuing: Started operation <strong>and</strong> maintenancein October 1989. O&M to continue.III. NEW PROJECTSNone.


7.2 COEUR D'ALENE RESERVATION ACTIONS(Fund Stream Survey; Design, Construction, Operation, <strong>and</strong> Maintenanceof Cutthroat/Bull Trout Hatchery; Habitat Improvement Projects;3-Year Monitoring Program>7.2903(g)(l)(B) [Abstract] BPA shall fund a baseline stream survey oftributaries located on the Coeur d'Alene Indian Reservation tocompile information on improving spawning habitat, rearinghabitat, <strong>and</strong> access to spawning tributaries for cutthroat <strong>and</strong>bull trout, <strong>and</strong> to evaluate the existing <strong>fish</strong>eries. Ifjustified by the results of the survey, fund the design,construction, <strong>and</strong> operation of a cutthroat <strong>and</strong> bull trouthatchery on the Coeur d'Alene Reservation; necessary habitatimprovement projects; <strong>and</strong> a three-year monitoring <strong>program</strong> toevaluate the effectiveness of the hatchery <strong>and</strong> habitatimprovement projects. If the baseline survey indicates a betteralternative than construction of a <strong>fish</strong> hatchery, the Coeurd'Alene Tribe will submit an alternative plan for considerationin <strong>program</strong> amendment proceedings.ACTION ITEM ACTIVITY SUMMARY:Objectives:Survey the streams on the Coeur d'Alene Indian Reservation for statusof stocks <strong>and</strong> the possibility of improving habitat. If feasible,construct habitat improvement projects. Determine need for stocksupplementation <strong>and</strong>, if needed, fund design, construction, <strong>and</strong>operation of a cutthroat <strong>and</strong> bull trout hatchery.Background <strong>and</strong> Progress to Date:Plans:Not applicable.BPA plans to fund this Action Item, beginning in FY 1990 with aproject to conduct the stream surveys.173


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOIN G PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDUI EAND MIIFSTS90-44 Stream Survey, Hatchery, Date Initiated: July 1990Improvements ,<strong>and</strong> Monitoringon the Coeur D'AleneReservationProiect Officer: R. Austin1. FY 1990: Begin stream surveys<strong>and</strong> determine stock status.2. FY 1991 <strong>and</strong> beyond: Identifyprojects to meet objectives 2, 3, <strong>and</strong> 4.Objectives:1. Survey streams <strong>and</strong> determinestock status.2. Assess possibilities forhabitat improvement.3. Construct hatchery, if needed.4. Monitor results of habitatimprovement projects <strong>and</strong> hatcherysupplementation.311. NEW PROJECTSNone.


7.37.3 KOKANEE SALMON HATCHERIES(Fund Design, Construction, Operation, Maintenance of Hatcheries atGalbraith Springs <strong>and</strong> Sherman Creek: Begin FY 1988.)(Fund Monitoring Programs>903(g)(l)(C) [Abstract] BPA shall fund design, construction, operation, <strong>and</strong>maintenance of two kokanee salmon hatcheries, one at GalbraithSprings <strong>and</strong> one at Sherman Creek. The Sherman Creek hatcherywill be used as an imprinting site <strong>and</strong> egg collection facilityto provide a source of kokanee fry for: i> stocking into BanksLake <strong>and</strong> ii> transferring to Galbraith Springs hatchery forrearing to fingerling size before planting into Lake Roosevelt.Decisions on hatchery production, stocking, <strong>and</strong> outplantinglocations will be coordinated by a three-member committeeconsisting of one representative each appointed by the ColvilleConfederated Tribes, Spokane Tribe, <strong>and</strong> the WashingtonDepartment of Wildlife.ACTION ITEM ACTIVITY SUMMARY:Objectives:To fund the design, construction, operation, <strong>and</strong> maintenance of twokokanee salmon hatcheries.Background <strong>and</strong> Proqress to Date:Plans:Preliminary design began in FY 1988.BPA will complete the final design of the hatcheries, <strong>and</strong>construction will begin in FY 1990.1 7 5


COMPLETEDI.PROJECTNUMBERTITLEPROJECT STATUS88-124-l Archeological Survey -Galbraith Springs - ConsultantProiect Office r: K. WardQbiectives: To investigate<strong>and</strong> recover cultural resourcesat hatchery site.Date Comoleted: November 1989Results/Conclusior: Cultural sites,including stone ovens <strong>and</strong> a pit housewere discovered <strong>and</strong> documented. Criteriafor site protection during constructionwere established.88-162-1 Hatchery ConsultantExoected Comoletion Da&: September 1998Proiect Officer: S. LevyQbiectives Provide engineeringservices in support of <strong>fish</strong>project design <strong>and</strong> construction.Results/Conclusions: Consultant isproviding engineering services.II. FY 1990 ONGOING PROJECTS88-62 Kokanee Hatcheries - Galbraith Date Initiated: FY 1988Springs <strong>and</strong> Sherman CreekProject Officer: S. LevyQbiectivel: Design, construct,<strong>and</strong> operate kokanee hatcheries.Results/Conflusioos: N o n e .FY 1991: Complete final design <strong>and</strong> Galbraith SpringsHatchery construction.FY 1991: Complete construction of Sherman Creekfacility.


5hLoaF ‘; 5.r .F2 gl-4:a* +VI.r 42.- 10 IAz.rP:2 CTw i vl.C1 7 7


7 . 47.4 HABITAT AND PASSAGE IMPROVEMENTS ON LAKE ROOSEVELT TRIBUTARYSTREAMS(Fund Design, Construction, Operation, Maintenance of Projects:Begin FY 1989)(Fund Monitoring Programs).903(g)(l)(D) [Abstract] BPA shall fund capital, operation, <strong>and</strong> maintenanceof pilot projects for improving habitat <strong>and</strong> passage into <strong>and</strong> outof Lake Roosevelt tributary streams for rainbow trout. The aimof this measure is to emphasize natural production by: i)facilitating passage of migratory rainbow trout between LakeRoosevelt <strong>and</strong> its tributary streams <strong>and</strong> ii) improving fry <strong>and</strong>fingerling rearing habitat in these streams.903(g)(l)(E) [Abstract] Monitoring to evaluate the effectiveness of theabove measures.ACTION ITEM ACTIVITY SUMMARY:Objectives:To improve stream habitat <strong>and</strong> passage into <strong>and</strong> out of Lake Roosevelttributary streams for rainbow trout. Determine status of <strong>fish</strong> stocksin Lake Roosevelt before habitat improvements <strong>and</strong> hatcheryconstruction. Evaluate the contribution of the hatcheries <strong>and</strong>habitat improvement projects of stocks in Lake Roosevelt.Background <strong>and</strong> Progress to Date:Plans:BPA funded a stock assessment study in FY 1988. Monitoring <strong>program</strong>started in summer of 1988.BPA will continue to fund habitat improvement projects in FY 1991.Annual reports on monitoring are available.1 7 9


I. COMPLETED PROJECTSNone.JI. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJPCT STATUSONFS88-63 Lake Roosevelt MonitoringProgram - Spokane TribeProject Officer: F. HolmObjectives:1. Determine status of <strong>fish</strong>stocks in Lake Roosevelt beforeconstruction of habitatimprovement projects <strong>and</strong>hatcheries.2. Evaluate contribution ofthese projects <strong>and</strong> hatcheriesto Lake Roosevelt.Date Initiated: July 1988Results/Conclusions: Available in<strong>annual</strong> reports.1. Continuing: Assess status of stocks inLake Roosevelt <strong>and</strong> measure the success of habitatimprovement projects <strong>and</strong> hatcheries.2. FY 1995: Project scheduled for completion.90-18 Lake Roosevelt HabitatImprovement Projects - CCTProiect Officer:S. LevyDate Initiatd: April 1990!+ults/Conclusions: None at this timeFY 1991 <strong>and</strong> 1992: Implement improvementsfrom work plan developed in FY 1990.aiectives: Fatilitate passageof resident <strong>fish</strong>velt tributariesrearing habitat.in Lake Roose<strong>and</strong>improveJII. NEW PROJECTSNone.


7.5 KOOTENAI INDIAN RESERVATION STURGEON HATCHERY(Fund Design, Construction, Operation, Maintenance of Hatchery: BeginFY 1988)(Fund Evaluation Study>7 . 5903(g)(l)(H) [Abstract] BPA shall fund design, construction, operation <strong>and</strong>maintenance of a low-capital sturgeon hatchery on the KootenaiIndian Reservation. BPA <strong>and</strong> the Kootenai Tribe also shallexplore alternative ways to make effective use of the hatcheryfacility year-round.ACTION ITEM ACTIVITY SUMMARY:Objectives:To design, construct, <strong>and</strong> operate a low-cost experimental sturgeonhatchery on the Kootenai Reservation in Idaho.Background <strong>and</strong> Proqress to Date:Plans:Project was funded to develop a water supply, design a hatchery, <strong>and</strong>train personnel in sturgeon culture in FY 1990. Ground water wastested <strong>and</strong> hatchery scheduled for construction in FY 1990 <strong>and</strong> FY 1991.BPA has funded project as stated above. Hatchery will be constructedin FY 1990 <strong>and</strong> FY 1991.1 8 1


I. COMPLETED PROJECTSNone.1 1 .PROJECTNUMBER TITLE PBpJrCT STATUS SW AND MIIFmS88-64 Design, Construct, <strong>and</strong> Date Initiatd: September 1988 FY 1991: Construction has started <strong>and</strong> will beOperate a Sturgeon Hatcherycompleted in FY 1991. Hatchery is scheduled to beon the Kootenai Reservation, in operation in spring of 1991.Idaho - Kootenai Tribe Results/Conclusions: Ground water hasbeen tested <strong>and</strong> hatchery scheduled forProject Officer: F. Holm construction in FY 1990 <strong>and</strong> FY 1991.Qbiectives: Same as title.UI. NEW PROJECTSNone.


7 . 67.6 STURGEON AND WATER LEVEL FLUCTUATIONS: IDAHO PORTION OF KOOTENAIRIVER(Fund Study to Assess Impacts: Begin FY 1989)903(g)(l)(I) [Abstract] BPA shall fund a survey of the Kootenai Riverdownstream from Bonners Ferry, Idaho, to the Canadian border to:i> evaluate the effectiveness of the hatchery <strong>and</strong> ii> assess theimpact of water level fluctuations caused by Libby Dam onhatchery operation for outplanting of sturgeon in the Idahoportion of the Kootenai River.ACTION ITEM ACTIVITY SUMMARY:Objectives:To assess the status of sturgeon stocks in the Kootenai River; obtainbrood <strong>fish</strong> for hatchery; assess the impact of water level fluctuationscaused by Libby Dam.Background <strong>and</strong> Progress to Date:Plans:BPA has funded a project with IDFG to begin looking for broodstock<strong>and</strong> train hatchery personnel. Project began in late FY 1988.Sturgeon have been caught <strong>and</strong> tagged <strong>and</strong> are being monitored. Itappears that broodstock will be available for spawning in spring of1991 after hatchery is completed.BPA will continue to fund this study in FY 1991, with emphasisdirected toward obtaining brood <strong>fish</strong> for the proposed hatchery.


I. COMPLETED PROJECTSNone.11. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJFCT STATUS ULF AND MI1 FSlQNFS88-65 Assess Impacts of Water LevelFluctuations on Sturgeon inthe Kootenai River - IDFGProiect Officer: F. HolmGbiectivel: Assess status ofsturgeon stocks in the KootenaiRiver <strong>and</strong> effects of waterfluctuations on these stocks.Obtain brood <strong>fish</strong> for hatchery.Date Initiated: September 1988 Continuing: Status of sturgeon populations<strong>and</strong> availability of brood stock will be determined.Eggs will be taken for experimental rearing/Results/Conclusions: 8PA contracted Project 88-64.with IDFG to conduct this studybeginning in 1988. Sturgeon are beingcaught, tagged <strong>and</strong> monitored. It islikely broodstock for experimentalrearing can be obtained for 1991.G P21. NEW PROJFCTSNone.


7 . 77.7 PEND OREILLE RIVER FISHERY IMPROVEMENTS ON KALISPEL RESERVATION(After Council Consultation, Fund Assessment of ImprovementOpportunities: Begin FY 1988)903(g)(l)(G) [Abstract] BPA shall fund an assessment of <strong>fish</strong>ery improvementopportunities in the Pend Oreille River within the boundaries ofthe Kalispel Indian Reservation. This survey will provide:i> baseline information about existing <strong>fish</strong> populations <strong>and</strong>habitat <strong>and</strong> ii) information on possible means of improving<strong>fish</strong>eries. Upon completion of the assessments, recommendationsfor <strong>fish</strong>eries projects will be submitted to the Council.ACTION ITEM ACTIVITY SUMMARY:Objectives:To survey the <strong>fish</strong> populations in the Pend Oreille River within theboundaries of the Kalispel Reservation. Develop recommendations toimprove the <strong>fish</strong>eries.Backqround <strong>and</strong> Proqress to Date:Plans:Project began in February 1988. Baseline data of <strong>fish</strong> stocks <strong>and</strong>angler use are in <strong>annual</strong> reports printed in 1989 <strong>and</strong> 1990.BPA will continue to fund this project through completion inFY 1991. At that time, recommendations will be submitted to theCouncil for <strong>fish</strong>eries improvement alternatives.1 8 5


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PS TATUS AND -ES88-66 Assess Fishery ImprovementOptions in the Pend OreilleRiver - KITProiect Officer: F. Holm. .Date Ini t&ed : February 1988 FY 1991: Project will be completed <strong>and</strong>recormnendations will be made to the CouncilResults/Conclusiw: Preliminary dataare in reports printed in 1989 <strong>and</strong> 1990.for <strong>fish</strong>eries improvement alternatives.gbiectives: Survey <strong>fish</strong>eriesin the Pend Oreille River.Develop recommendations toimprove the <strong>fish</strong>eries.III. NEW PROJECTSNone.


7 . 1 07.10 FUND PROJECTS AS PROVIDED IN SECTION 903(g)(2) AND ACTION ITEM 7.8.903(g)(Z)[Abstract1 The appropriate party or parties shall fund resident<strong>fish</strong> substitution actions in the blocked area above Hells CanyonDam to partially mitigate for salmon <strong>and</strong> steelhead lossesincurred as a result of the construction <strong>and</strong> operation ofFederal <strong>and</strong> non-Federal hydropower projects in the blockedarea.ACTION ITEM ACTIVITY SUMMARY:Objectives:Develop funding mechanisms <strong>and</strong> scheduling forsubstitution projects above Hells Canyon Dam.resident <strong>fish</strong>Background <strong>and</strong> Progress to Date:Plans:BPA has agreed to fund a portion of the Duck Valley measure. Troutwere purchased from private growers <strong>and</strong> stocked in FY 1988, FY 1989,<strong>and</strong> FY 1990. BPA funded a study to develop alternative means to<strong>annual</strong> <strong>fish</strong> stocking to enhance the <strong>fish</strong>eries of the Reservation <strong>and</strong>the development of a <strong>fish</strong>eries management plan.The Duck Valley <strong>fish</strong>eries management plan will be refined <strong>and</strong> troutwill be purchased in FY 1991. BPA plans to fund a feasibility studyfor resident <strong>fish</strong> artificial production above Hells Canyon Dam inFY 1991. Funding of this feasibility study does not representagreement by BPA to fund additional resident <strong>fish</strong> substitutionprojects above Hells Canyon Dam prior to the determination of theappropriate funding entity, or entities, by the Council.1 8 7


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS ES88-156 Duck Valley Resident FishProject - SPTProiect Officer: F. HolmQbiective: Purchase rainbowtrout to stock waters on DuckValley Reservation <strong>and</strong> developa management plan for reservationwaters.Date Initiated: FY 1988Results/Conclusion: The project fundedthe purchase of fingerling <strong>and</strong> catchablerainbow trout for stocking in waters onon the Duck Valley Reservation <strong>and</strong> thedevelopment of a <strong>fish</strong>eries managementplan.FY 1991: The <strong>fish</strong>eries management plan will berefined <strong>and</strong> trout will be purchased.III. NEW PROJECTSPROJECTNUMBER TITLE PROJFCT STATUS91-27 Feasibility Study - Hatchery New ProjectProduction Above Hells CanyonSCHEDULE AND MILESTONESFY 1991: Start study <strong>and</strong> complete within 12 months.Proiect Officer: TBAQbiectives: Determine thecosts, feasibility, <strong>and</strong> advantagesof exp<strong>and</strong>ing capacity(construction of new raceways,collection of additional waterfrom wells or springs, installationof oxygen injection, oradditional staffing) at Ashton,Cabinet Gorge, Hayspur, Mackay,or Nampa hatcheries to meet <strong>fish</strong>


5iii2 a Ic z.r uz:‘:.r ul‘c L.- a,2’2;.C vVI cn-Oggf .g,“::z,”.r -7-c.- 0u .rm mY- c aPC..r aJii L2 a, VI-2’m-oc E0 .r‘- mZiBa”1 8 9


7.117.11 ONGOING STUDIES IN MONTANA(Continue Cooperative Studies; Present Results to Council.Submit Recommendations by October 1, 1990.)903 [Abstract] The measures referenced in the Action Item areconcerned with the operations of Hungry Horse <strong>and</strong> Kerr dams <strong>and</strong>how their operations affect the game <strong>fish</strong> populations in theFlathead Basin. They also concern the reservoir levels ofHungry Horse <strong>and</strong> Libby <strong>and</strong> how these levels affect the game <strong>fish</strong>population in the reservoirs themselves. Operation proceduresare to be recommended <strong>and</strong> mitigation levels for <strong>fish</strong> lossesdetermined for effects of the hydroelectric system.ACTION ITEM ACTIVITY SUMMARY:Objectives:To determine the effects of reservoir drawdown <strong>and</strong> flows on resident<strong>fish</strong> in the Flathead River Basin in order to determine how variousreservoir levels affect the <strong>fish</strong> in Libby <strong>and</strong> Hungry Horse Reservoirs.Background <strong>and</strong> Progress to Date:Plans:These projects have been implemented because the resident <strong>fish</strong>resources of the Flathead Basin have been severely affected by theconstruction <strong>and</strong> operation of Hungry Horse <strong>and</strong> Kerr dams. In theKootenai Basin, the resident <strong>fish</strong> resources have been similarlyaffected by the construction <strong>and</strong> operation of Libby Dam. The effectsof reservoir drawdown <strong>and</strong> flows on the kokanee <strong>and</strong> other game <strong>fish</strong>are being determined. When projects have been completed,recommendations will be made for hydro operations <strong>and</strong> seasonaldrawdown levels compatible with the needs of the <strong>fish</strong>. Mitigationplans will be developed for losses that have occurred.The final reports for the projects were completed in 1989 <strong>and</strong> 1990;BPA will submit the project results to the Council.for future action will be submitted to the Council by RecommendationsNovember 1, 1991.1 9 1


L al II)Lki5y,e-id YI‘c Fiw-0 o E* a!25:::.; 0 “, 2Id al uL m 3-oQ iv) m0”s al2Lc 2%0 $‘GGVI c 134 aI“l8r:I-Q:‘,a; Ej 2 .zEPL. .L.r‘cLc11 9 2a;sl-Id it!j *z CT aP


7.127.12 STURGEON STUDIES(Fund Ongoing Studies>903(e)(l)BPA shall fund research to determine the impacts of development<strong>and</strong> operation of the hydroelectric power system on sturgeon inthe Columbia River Basin. These studies may include: 1) habitatrequirements; 2) maintenance of genetic integrity; 3) stockassessment; 4) potential for artificial propagation; <strong>and</strong>5) migrating potential. Specific recommendations for the ,protection, mitigation, <strong>and</strong> enhancement of sturgeon may besubmitted to the Council upon completion of these studies.ACTION ITEM ACTIVITY SUMMARY:Objectives:To determine the impacts onoperation of the hydropowerprotection, mitigation, <strong>and</strong>Background <strong>and</strong> Progress to Date:Plans:white sturgeon from the development <strong>and</strong>system. Develop recommendations for theenhancement of white sturgeon.Impacts on white sturgeon from the development <strong>and</strong> operation ofhydropower have not been determined, but there is evidence that,theimpacts have been substantial. From a series of workshops funded byBPA, a work plan for sturgeon research was developed, followed by asturgeon research <strong>program</strong> implementation plan. These were submittedto the Council, as called for by Action Item 7.12. Two projects arecurrently being funded by BPA. The University of Idaho (UI> studytransferred from the University of Washington will determine earlylife history requirements <strong>and</strong> the genetic makeup of the stocksthroughout the Basin. The other study, a four-agency project todetermine the habitat requirements <strong>and</strong> status of stocks downstreamfrom McNary Dam, is in its fourth field season.The genetic identification study is being exp<strong>and</strong>ed into the UpperColumbia Basin <strong>and</strong> the Kootenai River areas, where a sturgeonhatchery is proposed. The habitat requirements <strong>and</strong> stock assessmentstudy has been designed as a 6-year project because of the largestudy area <strong>and</strong> the multiple objectives involved.1 9 3


I. COMPLETED PROJECTSNone.PROJECTNUMBER TITLE89-44 White Sturgeon Early LifeHistory Requirements <strong>and</strong>Genetics Study - UIProiect Officer: F. HolmQbiectives: 1. Determinewhether white sturgeon arerepresented by geneticallydistinct stocks.2. Determine the early lifehabitat requirements <strong>and</strong>effects of the hydropowersystem on the sturgeon habitat.PEQJFCT STATUSDate initiated: 1984Results/bclusim: Allelic differenceshave been identified in <strong>fish</strong> from LakeRoosevelt <strong>and</strong> the Kootenai River.Additional samples will be taken toverify these differences. Stocks fromthe lower Columbia appear to be geneticallysimilar. Behavioral patterns <strong>and</strong>food requirements for young sturgeonhave been documented. Annual reportsare available.SCHFDULF AND MILFSTONFS1991: Project scheduled for completion.86-50 Determine the Status <strong>and</strong> Habitat Date initiated: 1986 1. 1991: Study will continue in The Dalles,Requirements of White SturgeonJohn Day, <strong>and</strong> Bonneville Dam pools. ModelPopulations in the Columbia Results/Conclusions: development will continue to identify effectsRiver Downstream from McNary Collection of all age groups of of hydropower on population status <strong>and</strong> habitat.Dam -ODFW (WDF, USFWS, <strong>and</strong> sturgeon has been successful, withNMFS are subcontractors) larval sturgeon <strong>and</strong> eggs being 2. 1992: Project is scheduled for completion.collected in The Dalles <strong>and</strong> BonnevilleProiect Officer: F. Holm Dam pools. Coordination with the workongoing below Bonneville Dam isexcellent.Annual reports for 1988-DOE/BP-63584-2<strong>and</strong> 1989-DOE/BP-63584-3 are available.


PROJECTNUMBERTITLESCHEDUIF AND MI1 FWES86-50cont.Qbiectives: Determine thestatus <strong>and</strong> habitat requirementsof white sturgeon in theColumbia River downstream fromMcNary Dam. Detailed objectives<strong>and</strong> results are described inthe Project's <strong>annual</strong> reports._III. NEW PROJECTSNone.


PEND OREILLE----- PEND OREILLE HATCHERY (FORMER ACTION ITEM 41.4)MEASURE LANGUAGE:Not applicable. Council deleted measure in amended Program.TECHNICAL SUBJECT ACTIVITY SUMMARY:Objectives:To design, construct, <strong>and</strong> evaluate the Pend Oreille (Cabinet Gorge>Hatchery. Evaluate the degree to which the Albeni Falls <strong>and</strong> CabinetGorge projects are responsible for the decline of the Lake PendOreille <strong>fish</strong>ery, <strong>and</strong> the level of mitigation necessary to restore areasonable number of <strong>fish</strong> in Lake Pend Oreille.Background <strong>and</strong> Progress to Date:Plans:The Pend Oreille (Cabinet Gorge> Hatchery was completed in 1985. Thehatchery produces 20 million kokanee fry <strong>annual</strong>ly to enhance the<strong>fish</strong>ing of Lake Pend Oreille, which has been adversely affected byCabinet Gorge <strong>and</strong> Albeni Falls dams <strong>and</strong> the introduction of mysisshrimp. BPA <strong>and</strong> the Washington Water Power Company shared the costsof constructing the facility. The IDFG funds the operation <strong>and</strong>maintenance of the hatchery. Evaluation activities are continuing.Fund evaluation activities through completion.7 9 7


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TIT1 E PROJECT STATUS85-339 Kokanee Stock Status <strong>and</strong>Contribution of Cabinet GorgeHatchery, Lake Pend Oreille,Idaho - IDFGProiect Officer: F. Holmmectives: Determine thecontribution of the CabinetGorge Hatchery to the kokanee<strong>fish</strong>ery in Lake Pend Oreille.Detailed objectives aredescribed in the Project's<strong>annual</strong> reports.Date initiated: 1985 1. 1991: Water will be requested for flushingflows in July <strong>and</strong> August 1991. Zooplankton dataResults/Conclusions: Kokanee egg takes will be analyzed <strong>and</strong> results compared to previousfor the hatchery have been increasing years' data <strong>and</strong> related changes in kokanee densitieseach year. 12 million eggs were taken <strong>and</strong> growth rates in order to define carryingin 1990. Hatchery water problems are capacity better. Some plants will be made, usingbeing solved; flushing flows from Cabinet a U.S. Navy barge. Creel census done in 1990 willGorge Dam are required to get fingerlings be used to estimate contribution of Cabinet Gorgedown the Clark Fork River into Lake Pend Hatchery.Oreille. IDFG continues to work withWashington Water Power on this. 2. Project scheduled for completion in 1991.The current kokanee population in PendOreille is estimated to be 10.2 million,compared to 4.3 million in 1986. Theincrease is a direct result of the hatcherycontribution. Over 100,000 kokaneewere caught in 1989.III. NEW PROJECTSNone.


7.137.13 ACCUMULATED MATERIALS IN KOOTENAI RIVER(Initiate Removal>903(d)(l)BPA shall fund the removal of materials which have accumulatedin Kootenai River tributary deltas below Libby Dam as a resultof the dam's construction <strong>and</strong> operation <strong>and</strong> which interfere withthe migration of spawning <strong>fish</strong>.ACTION ITEM ACTIVITY SUMMARY:Objectives:When necessary, remove materials which have accumulated in KootenaiRiver tributary deltas <strong>and</strong> which interfere with <strong>fish</strong> migration.Background <strong>and</strong> Progress to Date:Plans:Not applicable.None at this time.1 9 9


7.147.14 IMPACTS OF DWORSHAK DAM(Begin Assessment of Construction <strong>and</strong> Current Operation Impacts)903(e)(4)BPA shall fund a study to assess the impacts of the originalconstruction <strong>and</strong> current operation of Dworshak Dam on theresident <strong>fish</strong>ery. This study will include the followingresearch concerns of the Nez Perce Tribe: 1) population dynamicsof kokanee; 2) reservoir productivity; 3) food habits of rainbowtrout; 4) population dynamics <strong>and</strong> habitat preferences of smallmouth bass; <strong>and</strong>, 5) the status of forage species. This studyeffort will be coordinated with the Corps. Recommendationsdetailing specific protection, mitigation <strong>and</strong> enhancementopportunities, consistent with the requirements of 804(e)916),may be submitted to the Council.ACTION ITEM ACTIVITY SUMMARY:Objectives:To assess the status of resident <strong>fish</strong> stocks, particularly kokanee;to compare data to that obtained when reservoir was first filled; todetermine whether changes are caused by operation of Dworshak Dam.Background <strong>and</strong> Progress to Date:Plans:Two projects have been funded to cover the five concerns listed inthe Proaram Measure. IDFG <strong>and</strong> the NPT are the contractors for theproject;.The projects started July 1, 1987.The projects will run until December 31 1991, at which time IDFG <strong>and</strong>the NPT may submit recommendations detajling spec ific protection,miti gation, <strong>and</strong> enhancement plans to the Council.2 0 1


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE ECT STATUS SCHW AND WNFS87-99 Dworshak Dam Impacts Assessment<strong>and</strong> Fisheries Investigation -IDFGPro-Officer: R. AustinDbiectives: 1. Assess thestatus of kokanee stocks in thereservoir.2. Document losses of kokanee<strong>fish</strong> in Dworshak Reservoir.through turbines at DworshakDam.3. Assess limnologicalparameters <strong>and</strong> evaluate impactsof reservoir management on thezooplankton community <strong>and</strong>kokanee production.Date initiated: July 1987 1. FY 1990: Continue baseline data collection.Results/Conclusions: Kokanee abundanceestimated from late June trawl data, was540,000 <strong>fish</strong> in 1989. Anglers harvested 2. FY 1991: Continue baseline data collection.171,331 kokanee at 1.3 <strong>fish</strong> per hour. Prepare final report coordinated with Project 87-407.Creeled <strong>fish</strong> averaged 246 mm <strong>and</strong> 121 g; recommendations will be made to the Council forYield was 3.1 kg/hr. Spawning escapement measures to protect, mitigate, <strong>and</strong> enhance residentwas similar to 1988 with 37,000 kokaneeobserved in five tributaries of thereservoir in mid-to-late September.Two-year old spawners (277 mm totallength) comprised the bulk of the run.87-407 Dworshak ReservoirInvestigation: Trout, Bass<strong>and</strong> Forage Species - NPTProiect Officer: R. Austinobiectives: 1. Assess thestatus of rainbow trout, smallmouth bass, <strong>and</strong> forage speciesin the reservoir.2. Assess changes in thesepopulations in relation toreservoir management.Date initiated: July 1987 1. FY 1990: Continue baseline data collection.Results/Conclusions: An estimated 2. FY 1991: Continue baseline data collection.152,700 angler hours were expended from Prepare final report coordinated with Project 87-99.March 1989 through February 1990 to catch Recommendations will be made to the Council fora total of 20,426 rainbow trout, 13,064 measures to protect, mitigate, <strong>and</strong> enhancesmallmouth bass, <strong>and</strong> 180 bull trout. resident <strong>fish</strong> in Dworshak Reservoir.Approximately 98% of the rainbow troutcaught were of hatchery origin. Overallgrowth of smallmouth bass is betterthan that reported for other smallmouthbass populations at similar latitudes.Fish production has apparently stabilized


PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES87-407 since the extreme population fluctuationscont.noted during the 1970’s.III. NFW PROJFCTSNone.


7.157.15 ONGOING DRAWDOWN STUDIES(Continue Cooperative Studies; Present Results to Council. SubmitRecommendations by March 1, 1988.)903(b>(3-4)[Abstract] BPA shall fund research to develop operatingprocedures for Libby <strong>and</strong> Hungry Horse, including establishmentof reservoir levels to protect resident <strong>fish</strong> <strong>and</strong> development ofalternative means to resolve conflicts between drawdown limits<strong>and</strong> requirements for <strong>fish</strong> flows by means of the water budget.BPA shall submit results to the Council by March 1, 1988.Mitigation projects shall be identified in the Flathead Basin inrelation to construction <strong>and</strong> operation of Hungry Horse. Resultswill be submitted to the Council by November 15, 1987.ACTION ITEM ACTIVITY SUMMARY:Objectives:To determine the effects of reservoir operations on <strong>fish</strong> in Libby <strong>and</strong>Hungry Horse Reservoirs. Identify mitigation projects in theFlathead Basin in relation to construction <strong>and</strong> operation of theHungry Horse hydroproject.Background <strong>and</strong> Progress to Date:Plans:Projects at Libby <strong>and</strong> Hungry Horse Reservoirs have been funded since1983. Both projects were designed to document the effects of waterlevel fluctuations on resident <strong>fish</strong>. The fluctuations reduce primary<strong>and</strong> secondary production in the reservoirs, hence they have a directimpact on <strong>fish</strong> production. Annual reports from 1983 through 1988document these effects. Mitigation alternatives for losses from theconstruction <strong>and</strong> operation of Hungry Horse Dam are described in thefinal report for BPA-funded Project 85-23. The models developedduring the project have been critically reviewed by researchers atthe University of Washington.Recommendations for further action will be submitted to the Councilafter completion of the studies. Biological models will be runconcurrently with the System Analysis Model to help guiderecommendations.2 0 5


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILFSTONFS83-465 Quantification of Hungry HorseReservoir Levels Needed toMaintain or Enhance ReservoirFisheries - MDFWPProiect Officer: D. JohnsonQbiectives: 1. To study theeffects of reservoir drawdown.2. To develop a predictivemodel of hydro operations onresident <strong>fish</strong>eries, <strong>and</strong> recommendseasonal drawdown levelscompatible with the needs ofthe <strong>fish</strong>.Date initiated: April 1, 1983Results/Conclusions: Reservoir drawdownhas adverse effects on benthic macroinvertebrates<strong>and</strong> zooplankton, can increasecompetition between <strong>fish</strong>, <strong>and</strong>makes juveniles more accessible topredators. Fall drawdown is particularlydamaging to cutthroat growth rates.1. June 30, 1990: Biological model for thereservoir will be completed <strong>and</strong> runs will bemade concurrently with the Systems AnalysisModel. The biological model has beencritically reviewed <strong>and</strong> will be improvedby researchers at the University of Washington.83-467 Quantification of LibbyReservoir Levels Needed toMaintain or Enhance ReservoirFisheries - MDFWPmeet Officer: 0. JohnsonQbiectivel: 1. To study theeffects of reservoir drawdown.2. To develop a predictivemodel of hydro operations onresident <strong>fish</strong>eries, <strong>and</strong> recommendseasonal drawdown levelscompatible with the needs ofthe <strong>fish</strong>.m~nitiated: April 1, 1983 1. June 30, 1990: Biological model for thereservoir will be completed <strong>and</strong> runs will beResults/Conclusions: Gill net sampling made concurrently with the Systems Analysisindicates fluctuations in kokanee Model. The biological model has beennumbers. The reservoir model now in- critically reviewed <strong>and</strong> will be improved byeludes a hydrologic component downstream researchers at the University of Washington.to Duncan <strong>and</strong> Corra Linn dams.2. Work on <strong>fish</strong> entrainment through theLibby Dam penstocks <strong>and</strong> effects of operationson the <strong>river</strong> <strong>fish</strong>ery will begin in FY 1990to increase utility of the reservoir model.


UI. NFW PROJECTSNone.


WILDLIFE ACTION ITEMS AND TECHNICAL SUBJECTS2 0 9


8.18.1 LOSS STATEMENTS(Fund as Needs are Identified.>1003(b)(3)[Abstract] Bonneville shall fund studies to develop statementsof <strong>wildlife</strong> <strong>and</strong> habitat losses at the projects listed inTable 3 of the Fish <strong>and</strong> Wildlife Program, includingpower-related storage <strong>and</strong> regulatory dams. These statementsshall take into account all existing information pertinent tothe project area <strong>and</strong> shall address both realized <strong>and</strong> potentialpositive <strong>and</strong> negative effects.ACTION ITEM ACTIVITY SUMMARY:Objectives:To obtain an estimate of the net impacts on <strong>wildlife</strong> <strong>and</strong> habitat fromdevelopment <strong>and</strong> operation of Columbia River Basin Federal hydroelectricfacilities. This information will be used in developing objectives toprotect, mitigate, <strong>and</strong> enhance <strong>wildlife</strong> affected by hydro development<strong>and</strong> operation.Background <strong>and</strong> Progress to Date:Plans:The development of the hydroelectric system has caused both adverse<strong>and</strong> beneficial effects on <strong>wildlife</strong> <strong>and</strong> habitat. Action Item 8.1calls for the funding of studies to identify net impacts on <strong>wildlife</strong><strong>and</strong> <strong>wildlife</strong> habitat from hydroelectric development <strong>and</strong> operation.Study information will be used to develop Action Item 8.3: <strong>wildlife</strong>protection, mitigation, <strong>and</strong> enhancement plans.Table 7 outlines the status of loss assessments at FCRPS facilities.Loss assessments have been completed for 22 of the 29 FCRPSfacilities. Two facilities (Roza, <strong>and</strong> Ch<strong>and</strong>ler> do not require lossassessments. The U.S. Army Corps of Engineers has funded losssments for the Lower Snake facilities.asse SThecantosses assessment for Chief Joseph Dam in Washington willnue <strong>and</strong> be completed in FY 1991.2 1 1


STATUS OFTABLE 5ACTION ITEM 8.1 WILDLIFE LOSS STATEMENTSAT FCRPS FACILITIESMontanaHydro FacilityHungry HorseLibbyStatusCompletedCompletedIdahoPalisadesAnderson RanchBlack CanyonBoise DiversionDworshakMinidokaAlbeni FallsCompletedCompletedCompletedCompletedCompletedCompletedCompletedWashingtonGr<strong>and</strong> CouleeChief JosephIce HarborLower MonumentalLittle GooseLower GraniteCh<strong>and</strong>lerRozaCompletedOngoingFunded by USACEFunded by USACEFunded by USACEFunded by USACENone ProposedNone ProposedOregonCougarLookout PointDexterHills CreekGreen PeterFosterDetroitBig CliffCompletedCompletedCompletedCompletedCompletedCompletedCompletedCompletedOregon/WashingtonBonnevilleThe DallesJohn DayMcNaryCompletedCompletedCompletedCompleted2 1 2


1. COMPLETED PROJECTSPROJECTNUMBERTITLEPROJECT STATUS88-12 Lower Columbia (The Dalles,John Day, McNary) WildlifeProtection, Mitigation, <strong>and</strong>Enhancement Planning - WildlifeAssessment Phase - USFWSProiect Officer: A. RugerDate Completed: December 1989Results/Conclusion: Not available atthis time. USFWS has not submitted the<strong>wildlife</strong> loss assessment report forthese facilities.Qbiectives:1. Estimate net effects on<strong>wildlife</strong> from hydroelectricdevelopment <strong>and</strong> operation.2. Identify current status <strong>and</strong>management plans/goals for target<strong>wildlife</strong>.NE;II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES88-44 Wildlife Protection, Mitigation<strong>and</strong> Enhancement Plan forChief Joseph Dam - WDWProiect Officer: A. RugerQbiectives: Project implementsAction Items 8.1 <strong>and</strong> 8.3.1. Identify pre-construction<strong>and</strong> current status of <strong>wildlife</strong>in the project area.Date Initiated: September 1988 Schedule will be revised via an agreementmodification or by execution of a newagreement. Project completion <strong>and</strong> finalResults/Conclusions: Project start-up report anticipated in fall 1991.has been delayed. Agreement will bemodified or a new agreement will bedeveloped to adjust the schedule, toincorporate changes resulting fromthe Council's amendments to the <strong>wildlife</strong>section of the Program, <strong>and</strong> to includethe Colville Tribe in the planning.


PROJECTNUMBER TITLE PROJECT STATUSRESULTS/CONCLUSIONS88-44cont.2. Estimate net effects on effort.<strong>wildlife</strong> resulting fromhydroelectric development<strong>and</strong> operation.3. Develop protection, mitigation,<strong>and</strong> enhancement goals/objectives.4. Coordinate project activitieswith involved/interested parties(public involvement).Cleat-water River Otter Study Expected start date: September 1990 FY 1990: Start project.wet Officer: R. WalkerDbiectives: Provide baselinedata on population status,habitat use patterns, seasonaldistribution, <strong>and</strong> food habitatsof otters along the ClearwaterRiver <strong>and</strong> its tributaries.This information will helpidentify site-specific limitingfactors affecting otter populationsin the ClearwaterRiver drainage <strong>and</strong> help directmitigation efforts towardsthe selection of effectivemitigation techniques <strong>and</strong>locations of mitigation efforts.III. NEW PROJECTSNone.


8.2 LOSS STATEMENT CONSULTATIONS(Begin Consultation>8.21003(b)(4)(A)[Abstract] Upon completion of the 1003(b)(3) studies, theappropriate <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> agencies, Tribes, BPA, <strong>and</strong>project operators for each project shall review the results<strong>and</strong> discuss the options available to provide <strong>wildlife</strong>protection, mitigation, <strong>and</strong> enhancement in accordance with theNorthwest Power Act.ACTION ITEM ACTIVITY SUMMARY:Objectives:To provide a review of Action Item 8.1, loss assessments, <strong>and</strong> toassist in the development of Action Item 8.3, <strong>wildlife</strong> protection,mitigation, <strong>and</strong> enhancement plans. No projects/contracts will befunded by BPA in implementing this Action Item.Background <strong>and</strong> Progress to Date:Plans:Projects:Consultations have been held on 19 of the 29 FCRPS facilities.Consultations are not anticipated for six facilities. Table 8outlines the status of these consultations.Consultations will be held on four FCRPS facilities in FY 1991.These facilities include Bonneville, The Dalles, John Day, <strong>and</strong> McNaryDams. Consultations will be conducted as part of the mitigationplanning effort for these facilities being funded under ActionItem 8.3 (Project No. 90-25).None.2 1 5


TABLE 6STATUS OF ACTION ITEM 8.2 WILDLIFE CONSULTATIONSAT FCRPS FACILITIESHydro Facility Status OutcomeMontanaHungry HorseLibbyIdahoHeldHeldMitigation plan was funded.Palisades Held Mitigation plan was funded.Anderson Ranch HeldBlack Canyon HeldBoise Diversion HeldDetermined it was not effective tofund development of a mitigationplan.Dworshak Held Mitigation plan was funded.Albeni Falls Held Combined loss assessment <strong>and</strong>mitigation plan funded.Minidoka Held Mitigation plan was funded.WashingtonGr<strong>and</strong> Coulee Held Mitigation plan was funded.Chief Joseph Held Combined loss assessment <strong>and</strong>mitigation plan funded.Lower Snake None Proposed(Ice Harbor,Lower Monumental,Little Goose,Lower Granite>Mitigation planning beingconducted by USACE.Ch<strong>and</strong>ler None Proposed Status Review findings indicatedno need for mitigation planning.Roza None Proposed Status Review findings indicatedno need for mitigation planning.2 1 6


Hydro FacilityOregonWillametteCougarLookout PointDexterHills CreekGreen PeterFosterDetroitBig CliffOregon/WashingtonBonnevilleThe DallesJohn DayMcNaryHeldHeldHeldHeldHeldHeldHeldHeldStatusProposed for FY 1991Proposed for FY 1991Proposed for FY 1991Proposed for FY 1991OutcomeMitigation plan was funded.2 1 7


8.38.3 MITIGATION PLANS(Fund Development>1003(b)(4)[Abstract] Bonneville shall fund the development of mitigationplans for each of the projects listed in Table 3 of the Fish <strong>and</strong>Wildlife Program, including power-related storage <strong>and</strong> regulatoryDams.ACTION ITEM ACTIVITY SUMMARY:Objectives:To identify target <strong>wildlife</strong> species for protection, mitigation, <strong>and</strong>enhancement; to develop protection, mitigation, <strong>and</strong> enhancementgoals/objectives; <strong>and</strong> to coordinate mitigation goals/objectives withinterested <strong>and</strong> involved parties for Federal hydroelectric facilities.Background <strong>and</strong> Progress to Date:Plans:Action Item 8.3 pertains to the development of <strong>wildlife</strong> protection,mitigation, <strong>and</strong> enhancement plans. These plans are to take intoaccount the <strong>wildlife</strong> impacts identified under Action Item 8.1, are tocomplement existing <strong>wildlife</strong> management plans <strong>and</strong> goals, <strong>and</strong> are totake into account the st<strong>and</strong>ards outlined in Measure 1003(b)(4)(C).Wildlife protection, mitigation, <strong>and</strong> enhancement goals/objectivesdeveloped in these plans are submitted to the Council for theirapproval <strong>and</strong> prioritization.Table 9 outlines the status of mitigation plans at FCRPS facilities.Mitigation plans have been completed for 16 of the 29 FCRPSfacilities. Mitigation plans are not anticipated for seven FCRPSfacilities (Roza, Ch<strong>and</strong>ler, Boise Diversion, <strong>and</strong> Lower SnakeFacilities>.Mitigation plans for Chief Joseph, Minidoka, Bonneville, The Dalles,John Day, <strong>and</strong> McNary Dams will continue <strong>and</strong> be completed in FY 1991.2 1 9


STATUS OFTABLE 7ACTION ITEM 8.3 WILDLIFE MITIGATION PLANSAT FCRPS FACILITIESHydro FacilityStatusMontanaHungry HorseLibbyCompletedCompletedIdahoPalisadesAnderson RanchBlack CanyonBoise DiversionDworshakMinidokaAlbeni FallsCompletedCompletedCompletedNone proposedCompletedOngoingCompletedWashinqtonGr<strong>and</strong> CouleeChief JosephIce HarborLower MonumentalLittle GooseLower GraniteCh<strong>and</strong>lerRozaCompletedOngoingNone Proposed - Conducted by ..-_ USACENone Proposed - Conducted by USACENone Proposed - Conducted by USACENone Proposed - Conducted by USACENone proposedNone proposedOregonCougarLookout PointDexterHills CreekGreen PeterFosterDetroitBig CliffAll completedOregon/WashinqtonBonnevilleThe DallesJohn DayMcNaryOngoingOngoingOngoingOngoing220


I. COMPLETED PRQJECTSPROJECTNUMBER TITLE PROJECT STATUS88-154 Wildlife Protection,Mitigation, <strong>and</strong> EnhancementPlan for Dworshak Dam - IDFGProiect Officer: R. AustinQbiectives:1. Quantify net impacts ontarget <strong>wildlife</strong> species fromhydroelectric development <strong>and</strong>operation.2. Adress Nez Perce Tribe concernslisted in section 1000 ofthe Fish <strong>and</strong> Wildlife Programby identifying <strong>and</strong> summarizingthe best available information.3. Develop protection, mitigation,<strong>and</strong> enhancement goals.4. Recommend protection, mitigation,<strong>and</strong> enhancement actions.Date Compl&&: November 1989&ults/Cpgrlusim: A total of 15,188acres of low-elevation terrestrialhabitat <strong>and</strong> 1,782 acres of free-flowing<strong>river</strong> habitat were inundated by DworshakReservoir, as determined by a HabitatEvaluation Procedure (HEP). Estimatedlosses included 16 breeding Canada goosehabitat units (HU's), 91 black-cappedchickadee HU's, 4,312 <strong>river</strong> otter HU's,3,524 piliated woodpecker HU's, 11,603elk HU's, <strong>and</strong> 8,906 white-tailed deerHU's. Gains to <strong>wildlife</strong> were 323wintering canada goose HU's, 2,678wintering bald eagle HU's, 1,674 ospreyHU's, <strong>and</strong> 119 yellow warble HU's.Mitigation goals have been recommendedby an interagency Workgroup to replacebig game, old growth, <strong>and</strong> <strong>river</strong>inehabitats losts. Final results can befound in publication number:DOE/BP 92631-1.


PROJECTNUMBER TITLE PROJECT STATUS90-50 Minidoka Dam WildlifeMitigation Plan - IDFGProiect Officer: R. AustinDbiectivel:1. Develop <strong>and</strong> prioritizeprotection, mitigation, <strong>and</strong>enhancement goals for <strong>wildlife</strong>affected by hydroelectricdevelopment <strong>and</strong> operation(e.g., Wildlife Mitigation Plan).2. Recommend protection,mitigation, <strong>and</strong> enhancementactions.3. Coordinate project acitivitieswith interested/involved parites(public involvement).. .5&e Inltu!d : December 1989Results/Coadusions: Not availableat this time.SCHEDUlF AND MILESTONESAug. 1990: Draft Mitigation Plan.Sept 1990: Public review of mitigationPlan.Oct. 1990: Final Mitigation Plan;Project Completion.90-25Lower Columbia WildlifeExoected Start Date: Sept. 1990.Schedule is being developed as partMitigation PlanHowever, the project start dateof negotiations for the project.is dependent upon receipt of theFinal report anticipated spring 1991.Proiect Officer: R. Walkerloss assessment report fundedunder Action Item 8.1Qbiectives:(Project No. 88-12)1. Identify target <strong>wildlife</strong>species for protection,Results/Conclusions: Not availablemitigation, <strong>and</strong> enhancement.at this time.2. Develop protection,mitigation, <strong>and</strong> enhancemntgoals/objectives.3. Coordinate project activitieswith involved <strong>and</strong> interestedparties (public involvement).


8.4 - 8.7a.4a.58.6a.7LIBBY DAM MITIGATION(Initiate Advance Design for White-Tailed Deer, Mule Deer, ColumbiaSharp-Tailed Grouse, <strong>and</strong> Waterfowl Projects; Continue Implementation<strong>and</strong> Monitoring of Bighorn Sheep Project: 1987)LIBBY DAM MITIGATION(Continue Advance Design for Deer, Waterfowl, Grouse Projects; BeginImplementation <strong>and</strong> Monitoring for Mule Deer Project; ContinueImplementation <strong>and</strong> Monitoring of Bighorn Sheep Project: 1988)LIBBY DAM MITIGATION(Begin Implementation <strong>and</strong> Monitoring for White-Tailed Deer, Grouse, <strong>and</strong>Waterfowl Projects; Continue Implementation <strong>and</strong> Monitoring of Mule Deer<strong>and</strong> Bighorn Sheep Projects: 1989LIBBY DAM MITIGATION(Continue Implementation <strong>and</strong> MonDeer, Bighorn Sheep, Grouse, <strong>and</strong>toring for White-Tailed Deer, MuleWaterfowl Projects: 1990, 1991)1003(b)(7)[Abstract] Bonneville shall implement Council approvedmitigation priorities <strong>and</strong> plans at Federal projects through theImplementation Planning Process. Council-approved mitigationplans <strong>and</strong> priorities for Libby Dam are listed in Table 4 of the1987 Fish <strong>and</strong> Wildlife Program.Table 4 calls for BPA to undertake projects to enhance winterrange in Northwest Montana to support a target carryingcapacity of an additional 1,340 white-tailed deer, 485 muledeer, <strong>and</strong> 66 bighorn sheep. Table 4 also calls for theprotection of 2,462 acres of prairie habitat for Columbiasharp-tailed grouse, <strong>and</strong> 3,4.18 acres of wetl<strong>and</strong> habitat in theFlathead Valley.ACTION ITEM ACTIVITY SUMMARY:Objectives:To undertake advance design <strong>and</strong> then begin implementation of the<strong>wildlife</strong> mitigation projects for Libby Dam.Backsround <strong>and</strong> Progress to Date:Action Items 8.4 through 8.7 pertain to the advance design <strong>and</strong>implementation of <strong>wildlife</strong> mitigation projects for Libby Dam.In FY 1987, BPA began advance design for the <strong>wildlife</strong> habitatimprovement <strong>and</strong> protection projects. In FY 1988, BPA continued advancedesign <strong>and</strong> began big game habitat improvement projects. Big Gamehabitat improvement projects were continued in FY 1989 <strong>and</strong> FY 1990Sharp-tailed grouse work was initiated in FY 1989 <strong>and</strong> continued in FY1990.225


Plans:BPA plans to continue <strong>and</strong> complete projects for bighorn sheep, muledeer, <strong>and</strong> sharp-tailed grouse in FY 1991. Future <strong>wildlife</strong> projectsfor Libby Dam will be funded through the Montana Wildlife MitigationTrust Agreement.226


I. COMPLETED PROJFCGPROJECTTITLEPROJECT STATUS84-38 Ural-Tweed Bighorn SheepEnhancement - USFSProiect Officer: R. WalkerDbiectives: Enhanceapproximately 1,300 acresof sheep range on KootenaiNational Forest l<strong>and</strong>s.Exoec&Q&nComaletlon Date: June 1990Results/ConclusiPns: Final results/conclusions are not available atthis time. Preliminary informationis in <strong>annual</strong> reports: publicationnumbers DOE/BP 18966-1 <strong>and</strong>DOE/BP 18966-2.84-39 Ural-Tweed Bighorn SheepMitigation - MDFWPProiect Officer: R. Walkergbiectives:1. Evaluate the effectivenessof the habitat improvementsdone under Project 84-38.2. Outline a <strong>program</strong> tomaintain a viable bighornsheep population.Exoected Comoletion Date: June 1990Results/Conclusions: Final results/conclusions are not available atthis time. Preliminary informationcan be found in <strong>annual</strong> reports:publication numbers DOE/BP 18966-1<strong>and</strong> DOE/BP 18966-2.


II. FY 1990 ONGOING PROJECTS Action Item No. 8.4 - 8.7PROJECTNUMBERTITLE=CT STATUSSCHEDULF AND MILESTONES87-55 Northwest Montana WildlifeHabitat Enhancement - MDFWPProiect Officer: R. WalkerQbiectivel: This project undertakesadvance design of thehabitat enhancement actions forLibby <strong>and</strong> Hungry Horse Dams.1. Develop a habitat enhancementplan for elk/mule deer on FlatheadNational forest l<strong>and</strong>s.2. Develop a habitat enhancementplan for mule deer/bighorn sheepon Kootenai National Forest l<strong>and</strong>s.Date Initiated: September 1987&sults/Conclusim: Not availableat this time.1. April 1990: Draft lo-yearenhancement plans.2. June 1990: Final lo-yearenhancement plans.3. October 1990: Draft monitoring plan.4. December 1990; Final monitoring plan;Project Completion.


PROJECTNUMBERTITLEPROJFCT STATUSSCHEDULE AND MILESTONES88-43Libby Wildlife HabitatEnhancement - USFS. .Rate In1 t1at.d : September 1988.lusim: Not available1. Fall 1990: Continue habitattreatments.2. Spring 1991: Continue habitatProject Officer: R. Walkerat this time.treatments.3. December 1991: Project Completion.Ubiectivec: Initiate habitatimprovement activities onKootenai National Forest l<strong>and</strong>sfor mule deer <strong>and</strong> bighorn sheep.Treat approximately 1000 acres ofkey winter range by slashing <strong>and</strong>prescribed burning.90-49Libby/Hungry HorseWildlife Project - MDFWPProiect Officer: R. WalkerDbiectives:1. Determine critical habitatsnecessary for the protection,Date Initiated: May 1990Results/Conclusions: Not availableat this time.1. February 1991: Status report onLibby/Hungry Horse HabitatProtection Program.2. April 1992: Draft report ongrouse mitigation <strong>program</strong>.3. June 1992: Final report ongrouse mitigation <strong>program</strong><strong>and</strong> project completion.enhancement, <strong>and</strong> maintenanceof grouse on the Tobacco Plains.2. Develop a mitigation strategyfor grouse.3. Refine the habitat protection<strong>program</strong>s for Libby <strong>and</strong> HungryHorse.4. Coordinate project activitieswith interested/involved parties.III. NEW PROJECTSNone


8.8 - 8.108.8 HUNGRY HORSE DAM MITIGATION(Initiate Advance Design/Begin to Implement Elk/Mule Deer Project;Begin Advanced Design, Interagency Coordination, Site Prioritization,<strong>and</strong> Appraisals for Black Bear/Grizzly Bear, Waterfowl, TerrestrialFurbearer Projects: 1987.)8.9 HUNGRY HORSE DAM MITIGATION(Continue Advance Design Waterfowl, Terrestrial Furbearer, BlackBear/Grizzly Bear Projects; Continue Implementation/Monitoring ofElk/Mule Deer Project: 1988.)8.10 HUNGRY HORSE DAM MITIGATION(Begin/Continue Implementation of Waterfowl, Elk/Mule Deer, BlackBear/Grizzly Bear Projects: 1989-1991.)1003(b)(7)[Abstract].Bonneville shall implement Council approvedmitigation priorities <strong>and</strong> plans at Federal projects through theImplementation Planning Process. Council-approved mitigationplans <strong>and</strong> priorities for Hungry Horse Dam are listed in Table 4of the 1987 Fish <strong>and</strong> Wildlife Program.Table 4 calls for BPA to undertake projects to enhance winterrange in Northwest Montana to support a target carrying capacityof additional 133 elk. Table 4 also calls for the protection of8,590 acres of riparian habitat for grizzly bears <strong>and</strong> 1 146 acresof wetl<strong>and</strong> habitat, along with determining the feasibility ofprotecting 11,050 acres of old-growth timber for terrestrialfurbearers.ACTION ITEM ACTIVITY SUMMARY:Objectives:To undertake advance design <strong>and</strong> then begin implementation of the<strong>wildlife</strong> mitigation projects at Hungry Horse Dam.Background <strong>and</strong> Progress to Date:Plans:Action Items 8.8 through 8.10 pertain to the advance design <strong>and</strong>implementation of <strong>wildlife</strong> mitigation for Hungry Horse Dam.In FY 1987, BPA initiated advance design for the <strong>wildlife</strong> habitatimprovement <strong>and</strong> protection projects. In FY 1988, BPA continuedadvance design <strong>and</strong> began habitat improvement <strong>and</strong> protectionprojects. In FY 1989 <strong>and</strong> FY 1990, habitat improvement <strong>and</strong> protectionprojects were continued.BPA plans to continue <strong>and</strong> complete activities for the elk/mule deerhabitat enhancement projects <strong>and</strong> the easement/acquisitions (habitatprotection) projects in FY 1991. Future <strong>wildlife</strong> projects for HungryHorse Dam will be funded through the Montana Wildlife MitigationTrust Agreement.2 3 1


I. COMPLETED PROJECTSPROJECTNUMBER TITLE PRO.lFCT STATUS87-60 Montana Wildlife Easements/ Exoectedpletion Date: July 1990L<strong>and</strong> Acquisitions - MOFWPProject Officer: R. WalkerResults/Conclusions :at this time.Not availableDbiectives: This projectundertakes advance design forthe Libby <strong>and</strong> Hungry Horse <strong>wildlife</strong>habitat protection actions.1. Outline habitat protectionstrategies for the bear,waterfowl, <strong>and</strong> grouse projects.2. Outline the feasibilityfor protection of terrestrialfurbearer habitat.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES88-113 Hungry Horse Wildlife Date Initiatd: September 1988 1. Fall 1990: Continue habitatHabitat Enhancement - USFStreatments.Results/Conclusions: Not available 2. Spring 1991: Continue habitatProiect Officer: R. Walker at this time. treatments.3. December 1991: Project completion.Ubiectives: Begin habitatimprovement activities onFlathead National Forest l<strong>and</strong>sfor elk <strong>and</strong> mule deer. Treatapproximately 500 acres of keywinter range by slashing <strong>and</strong>prescribed burning.


II. FY 1990 ONGOING PROJECTSPROJECTNUMBER - PROJECT STATUSSCHEDULE AND MILESTONES89-23 Montana Wildlife HabitatProtection - MDFWPProiect Officer: R. Walkeructives:1. Obtain information toevaluate specific habitatsfor protection.2. Provide coordination forproject actions.3. Protect specific habitats.Date Initiata: September 1989Results/Conclusions:Evaluation of acquiring <strong>and</strong>developing a waterfowl enhancementproject (Ashley Creek) wascompleted. Soils evaluationsindicated developing theAshely Creek project was noteconomically feasible.Alternative habitat protectionprojects are being evlauated.1. May - June 1990: Evaluate feasibilityof modifying project to protect specifichabitats.2. September 1990: Report summarizingproject activities.3. September 1990: Project modificationto provide for protection of specifichabitats.III. NEW PROJECTSNone.


8.118.11 PUBLIC INVOLVEMENT ON MITIGATION PLANS(Fund Public Involvement Concerning Mitigation Plans>1003(b)(4)(B) [Abstract] Bonneville shall fund the entity or entitiespreparing mitigation plans to conduct appropriate publicinvolvement activities to ensure that interested <strong>and</strong> affectedparties are informed concerning the mitigation plans <strong>and</strong> havebeen afforded the opportunity to comment on them.ACTION ITEM ACTIVITY SUMMARY:Objectives:To conduct appropriate public involvement for the mitigation plansbeing developed pursuant to Measure 1003(b)(4). Noprojects/contracts will be funded by BPA under this Action Item.Public involvement will be funded as part of the mitigation planningeffort under Action Items 8.1 <strong>and</strong> 8.3.Background <strong>and</strong> Progress to Date:Plans:Projects:Public involvement on mitigation plans for Gr<strong>and</strong> Coulee Dam inWashington; Palisades, Black Canyon, Anderson Ranch, Albeni Falls,<strong>and</strong> Dworshak Dams in Idaho; <strong>and</strong> for the Willamette facilities inOregon have been completed by the entities that prepared these plans.Public involvement will be conducted for mitigation plans beingdeveloped for Chief Joseph, Minidoka, Bonneville, The Dalles, JohnDay, <strong>and</strong> McNary Dams as part of the mitigation planning effort beingfunded under Action Items 8.1 <strong>and</strong> 8.3 in FY 1991.None.2 3 5


8.12 FUND IMPLEMENTAION OF MITIGATION PRIORITIES(Fund Mitigation Priorities approved by the Council)8.121003(b)(7)[Abstract] Bonneville shall implement Council-approvedmitigation priorities <strong>and</strong> plans at Federal projects throughthe IPP. Projects to be implemented shall take intoconsideration the st<strong>and</strong>ards listed under Measure 1003(b)(7).In reviewing proposals, the IPP will consider the extent towhich proposals would protect or enhance special habitat orspecies that would not be available unless prompt action istaken; such proposals should be implemented only with theconsent of the Council.ACTION ITEM ACTIVITY SUMMARY:Objectives:To identify, develop, <strong>and</strong> implement projects for priority <strong>wildlife</strong>mitigation objectives for Federal hydroelectric facilities.Background <strong>and</strong> Progress to Date:Plans:No <strong>wildlife</strong> mitigation has been implemented in the states of Oregon,Washington, or Idaho. Efforts to date have been directed towardsmitigation planning (Action Items 8.1 <strong>and</strong> 8.3).The Council is currently considering <strong>wildlife</strong> mitigation prioritiesfor Gr<strong>and</strong> Coulee Dam in Washington; for Palisades, Black Canyon,Anderson Ranch, <strong>and</strong> Albeni Falls Dams in Idaho; <strong>and</strong> for theWillamette facilities in Oregon.BPA will initiate <strong>wildlife</strong> mitigation projects for Federalhydroelectric facilities in Oregon, Washington <strong>and</strong> Idaho once theCouncil establishes mitigation priorities. Initiation in FY 1991depends upon Council action.2 3 7


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES90-91 Idaho Timber Rights AdvanceDesign Study - IDFGProiect Officer: R. WalkerQbiectives: Conduct advancedesign study to facilitatedecision on implementation ofacquisition.Date Initiated: September 1990Results/Conclusions: None atthis time.FY 1990: Initiate advance design study<strong>and</strong> conduct Habitat Evaluation Procedure(HEP) analysis.FY 1991: Complete advance design study.90-92 Conforth Ranch Advance DesignStudy - USFWSProiect Officer: R. WalkerDate Initiatd: September 1990Results/Conclusions: None atthis time.FY 1990: Initiate advance design study<strong>and</strong> conduct HEP analysis.FY 1991: Complete advance design study.uectiva: Conduct advancedesign study to facilitatedecision on implementation ofacquisition.


III. NEW PROJECTSPROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES91-16 Wildlife Mitigation(Oregon, Washington, Idaho)Proiect Officer: R. WalkerNew Project 1. Initiation in FY 1991 dependsupon Council establishing prioritymitigation objectives for the ColumbiaRiver Basin.Q&ectives: Begin development<strong>and</strong> implementation of<strong>wildlife</strong> mitigation projectsfor Federal facilities inOregon, Washington, <strong>and</strong> Idaho.Multiple mitigation actions(projects) will be developed<strong>and</strong> implemented.2. Initiation is also dependentupon scopes of work being developed<strong>and</strong> coordinated for priority mitigationobjectives.


8.138.13 DEVELOP MONITORING AND EVALUATION PROGRAM(In Consultation with Involved Parties, Develop aMonitoring <strong>and</strong> Evaluation Program)1003(c) Bonneville shall develop in consultation with the Council, the <strong>fish</strong><strong>and</strong> <strong>wildlife</strong> agncies <strong>and</strong> tribes, utilities, <strong>and</strong> other interestedparties a comprehensive <strong>program</strong> to monitor <strong>and</strong> evaluate theeffectiveness of the <strong>wildlife</strong> <strong>program</strong>.ACTION ITEM ACTIVITY SUMMARY:Objectives:To develop <strong>and</strong> implement a <strong>program</strong> to monitor <strong>and</strong> evaluate <strong>wildlife</strong>projects funded by BPA.Background <strong>and</strong> Progress to Date:Plans:Projects:Wildlife mitigation to date has been limited to efforts for Libby <strong>and</strong>Hungry Horse Dams in the State of Montana. Monitoring <strong>and</strong> evaluationof these activities are being undertaken through the Montana WildlifeMitigation Trust Agreement. Mitigation has not yet been initiatedfor facilities in Oregon, Idaho, <strong>and</strong> Washington. Monitoring <strong>and</strong>evaluation will be undertaken as part of the mitigation efforts inthese states.In FY 1991, BPA will initiate discussions with the Council, the <strong>fish</strong><strong>and</strong> <strong>wildlife</strong> agencies <strong>and</strong> tribes utilities, <strong>and</strong> other interestedparties to begin scoping a <strong>wildlife</strong> monitoring <strong>and</strong> evaluation<strong>program</strong>. Actions to be undertaken <strong>and</strong>/or funded will be determinedthrough this scoping effort.None.2 4 1


----- INNOVATIVE FUNDING OF HUNGRY HORSE/LIBBY MITIGATION(Fund the Montana Wildlife Trust)MITIGATION FUNDING1003(b)(7)[Abstract] Bonneville shall implement Council approvedmitigation priorities <strong>and</strong> plans at Federal Projects. Councilapproved mitigation plans <strong>and</strong> priorities for Libby <strong>and</strong> HungryHorse Dams are listed in Table 4 of the 1987 Fish <strong>and</strong> WildlifeProgram.ACTION ITEM ACTIVITY SUMMARY:Objectives:Implement the Wildlife Mitigation Agreement (Montana Trust Fund)negotiated between BPA <strong>and</strong> the State of Montana for funding <strong>wildlife</strong>mitigation for Libby <strong>and</strong> Hungry Horse dams.Backqround <strong>and</strong> Progress to Date:Plans:BPA <strong>and</strong> the State of Montana signed a mitigation agreement inDecember 1988. The agreement establishes a $12.5 million Trust Fundto finance <strong>wildlife</strong> mitigation for Libby <strong>and</strong> Hungry Horse Dams. BPAmade its first payment of $2 million to the Trust Account in December1989.BPA plans to make its scheduled payment to the Trust account inDecember 1990.2 4 3


I. COMPLETED PROJECTSNone.II. FY 1990 ONGOING PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHE;PUl E AND MIIESTONFS89-52 Montana Wildlife Trust Date Initiated: December 1988Proiect Officer: R. Walker Results/Conclusions: Initialpayment of $2 million was madegbiectives:to the Trust Account1. Establishes a $12.5 in December 1989.million Trust Account.2. Sixty year agreement.3. Addresses impacts to <strong>wildlife</strong>from the development ofLibby <strong>and</strong> Hungry Horse Dams.4. Montana, through the useof Trust Account, responsiblefor Wildlife Mitigation.1. December 1990: Make scheduledpayment to the Trust Account.2. Subsequent payments to be made onan <strong>annual</strong> basis.III.NEW PROJECTS


FUTURE HYDROELECTRIC DEVELOPMENTACTION ITEMS AND TECHNICAL SUBJECTS2 4 5


9.19.1 APPLICATION OF PROGRAM SECTIONS 1204(a), (b), (c), AND (e) TO NEWPROJECTS1103 (a-c, e) [Abstract] These measures direct BPA <strong>and</strong> the hydroelectricproject operators <strong>and</strong> regulators not to license, exempt fromlicense, relicense, propose, recommend, agree to acquire powerfrom, grant billing credits for, or otherwise support anyhydroelectric development in the Columbia River Basin withoutproviding for numerous development conditions related toprotection of <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> resources.ACTION ITEM ACTIVITY SUMMARY:Objectives:To apply Program Section 1103(a-c, e) to all new hydro projects.Background <strong>and</strong> Progress to Date:Plans:Projects:BPA is applying these Program sections to the BPA Hydro OptionsProgram.BPA will continue to apply these <strong>program</strong> sections to the BPA HydroOptions Program <strong>and</strong> any future hydro development.No BPA-funded projects.2 4 7


9.39.3 ASSESSMENT OF CUMULATIVE EFFECTS(Complete Study; Develop Methods: June 1987)1103(b)(2)Develop methods for assessing the cumulative effects ofhydroelectric development upon <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> in the ColumbiaRiver Basin.ACTION ITEM ACTIVITY SUMMARY:Objectives:To review all pertinent literature on potential cumulativehydroelectric effects, for specific key <strong>fish</strong> <strong>and</strong> <strong>wildlife</strong> species; toanalyze existing techniques for assessment of identified cumulativeeffects; to develop an array of recommended pertinent assessmenttechniques for a cumulative effects method; <strong>and</strong> to develop ahypothetical example of a cumulative assessment using the method.Background <strong>and</strong> Progress to Date:Plans:Projects:Development of a cumulative effects method supported the Council'sdesire to have all applications or proposals for hydroelectricdevelopment reviewed in a consolidated manner. Project 84-4 1(completed in 1987) developed a methodology to assess potentialcumulative effects.BPA has no plans for further funding.No BPA-funded projects.2 4 9


9.4 TURBINE INTAKE SCREENS(Develop New Designs, Complete Tests, Report to Council: January 1989)9.41103(d)Bonneville shall fund studies to determine the effectiveness ofnew designs for turbine intake screens <strong>and</strong> their suitability forapplication at small hydroelectric projects.ACTION ITEM ACTIVITY SUMMARY:Objectives:To develop a new st<strong>and</strong>ard <strong>fish</strong> screen that is biologically efficient<strong>and</strong> cost-effective for hydro developers.Background <strong>and</strong> Progress to Date:Plans:ProjectsInstallation <strong>and</strong> maintenance of currently available screening systemsare expensive <strong>and</strong> must be tailored to the site. Most present screensystems have not been tested sufficiently to be characterized asproven. Existing designs <strong>and</strong> new designs must be evaluated todetermine which designs are biologically <strong>and</strong> economically efficient.The suitability of screen designs for application at smallhydroelectric facilities must also be determined. The intent is toprovide acceptable <strong>fish</strong> screen designs with general applicability forregional hydropower developers.Presently deferred, since BPA's adoption of Protected Areas in itsLong-Term Intertie Access Policy provides protection for <strong>fish</strong>investments through denying access to the Pacific Northwest-PacificSouthwest Intertie to any new hydroelectric projects located indesignated Protected Areas of the Columbia River Basin.No BPA-funded projects.2 5 1


WORK AND EXPENDITURE PLANACTION ITEMS253


10.1 - 10.3lO.l- EXPENDITURE AND OBLIGATION PLANS10.3 (Submit to Council bv September 15 of Each Year. Update <strong>and</strong> SubmitInformation Quarterly. Submit Review of Previous Year. ReportExpenditures by Measure.>1203(a,c,d)[Abstract] These measures describe Program implementation byFederal project operators <strong>and</strong> regulators <strong>and</strong> BPA, consultation<strong>and</strong> coordination, <strong>and</strong> BPA funding of the Program.ACTION ITEM ACTIVITY SUMMARY:Objectives:The Annual Implementation Work Plan (AIWP) for FY 1990 describes BPAplans for implementation of the Council's Program <strong>and</strong>, in particular,the Action Plan. The AIWP is intended to contain:1. A report on progress to date on each Action Item.2. A description of the activities to be undertaken under eachAction Item, including;Background <strong>and</strong> Proqress to Date:Plans:a. the objective of each activity, <strong>and</strong>b. the schedule for each activity, including kevdecision po nts <strong>and</strong> major milestones.Annually since FY 1986, BPA has completed a Program Work Plan <strong>and</strong>submitted this plan to the Coun Cil.In 1987, BPA began developing aProgram Implementation PlanningProcess (IPP) that would provide an opportunity for the agencies,Tribes, <strong>and</strong> other interested parties to become more involved inplanning the implementation of the Program. Development of thisprocess was completed in 1988, <strong>and</strong> the IPP (see Section III) wasendorsed by the BPA Administrator <strong>and</strong> the Chairman of the CBFWA onOctober 19, 1988. The IPP's Policy Review Group (PRG) was formed inlate 1988. In January 1989, the PRG began providing BPA with policy<strong>and</strong> funding recommendations related to Program implementation. TheAIWP is based on the outline developed by the PRG during Step 1 ofthe <strong>annual</strong> IPP <strong>annual</strong> cycle.The AIWP will continue to be developed through the IPP.2 5 5


PROGRAM-RELATED, NON-MEASURE PROJECTS2 5 7


----- PROGRAM-RELATED PROJECTSPROGRAM-RELATED PROJECTSMEASURE LANGUAGE:Not applicable. These are non-measure projects.TECHNICAL SUBJECT ACTIVITY SUMMARY:See individual projects in the following table.2 5 9


I. COMPLETED PROJECTSPROJECTNUMBER TITLE PROJECT STATUS87-130 An Assessment of the Freeze Date Comoleted: 1990Br<strong>and</strong> Recovery Data for YearlingChinook Salmon at McNary Dam - Results/Conclusions: Information pendingNMFSProiect Officer:0. Johnsonfor first draft. Final report is inprint.Objectives: Determine whetherPIT-tagged <strong>and</strong> freeze-br<strong>and</strong>edyearling chinook <strong>and</strong> steelheadare recovered at different rates<strong>and</strong> identify the sources ofsampling error.II. FY 1990 ONGOING PROJECTSPROJECTNUMBERTITLEPROJECT STATUSSCHEDULE AND MILESTONES82-13 Coded Wire Tag/SamplingProgram Recovery - PSMFCProject Officer: P. PoeQbiectives: Support WDF, WDW,<strong>and</strong> ODFW <strong>fish</strong>ery recoveriesof coded-wire tagged salmon<strong>and</strong> steelhead.Date initiated: 1982Results/Conclusions: Commercial <strong>and</strong>sport <strong>fish</strong>ery recoveries of coded-wiretagged salmon <strong>and</strong> steelhead were decoded,compiled, <strong>and</strong> reported.Continuing: BPA will continue to fund codedwiretag recoveries.


PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES82-16 Yakima River Spring ChinookEnhancement Study - YINProject Officer: T. Vogelgbiectiva: Establishmethods to rebuild springchinook salmon runs in theYakima River while maintainingthe genetic components of thenaturally reproducing stocks.Date Initiated: FY 1982 1. Continuing: BPA has funded the projectto completion.Results/Conclusion$: Information hasbeen collected on survival <strong>and</strong> 2. March 1991: Project is scheduled foremergence from redds, survival from fry completion: final report will be available.to smelt, <strong>and</strong> downstream movement offry. Project <strong>annual</strong> reports areavailable.Ncn-L


PROJECTNUMBER TITLE PROJECT STATUS _ SCHEDULE AND MILESTONES86-13 Augmented Fish HealthMonitoring in Washington - WDW86-54 Augmented Fish HealthMonitoring in Washington - WDF87-117 Augmented Fish HealthMonitoring in Idaho - IDFG87-118 Augmented Fish HealthMonitoring in Oregon - ODFW87-119 Augmented Fish HealthMonitoring - USFWSDate initiated:87-13: August 198687-54: July 198687-117: June 198787-118: June 198787-119: July 1987ResultsKonclusioaZ: Projects haveassured consistent <strong>fish</strong> health datamonitoring <strong>and</strong> reporting in the ColumbiaBasin anadromous <strong>fish</strong> hatcheries.1. Continuing: Fund a comprehensive <strong>fish</strong>health management system through st<strong>and</strong>ardizedmonitoring.2. Continuing:: Define <strong>fish</strong> culture impediments,including water quality, in the Columbia Basinhatcheries.3. Continuing: Ensure compatibility of the datagenerated by these projects with that of theArtificial <strong>and</strong> Natural Production Data Bases(Program Measure 204).Proiect Officer: R. MorinakaObiectives: Collect data in asystematic, st<strong>and</strong>ardized manner<strong>and</strong> provide a system of rapidstorage <strong>and</strong> retrieval of <strong>fish</strong>health/production informationin the anadromous <strong>fish</strong> hatcheriesof the Columbia River Basin.Begin to develop a documentation<strong>and</strong> data retrieval system thatcan be used by persons who arenot <strong>fish</strong> diagnosticians.


PROJECTNUMBER TITLE _ PROJECT STATUSSCHEDULE AND MILESTONES89-20 Airlift Fabrication Date Initiated: 1989Proiect Officer: W. MaslenQbiectives: Provide fundingfor fabrication of airlift<strong>fish</strong> sampling devices <strong>and</strong>miscellaneous supporting hardwarefor Lower Monumental,Ice Harbor, John Day, <strong>and</strong> TheDalles Dams, as specified inthe Long-Term Fish SpillMemor<strong>and</strong>um of Agreement. Thisequipment supports monitoring<strong>program</strong>s specified underprojects 84-14 <strong>and</strong> 87-127.Results/Conclusjons: One airliftsampling device was fabricated for useat The Dalles Dam.Additional airlift <strong>fish</strong> sampling devices may befabricated, as agreed by the parties.90-80 Columbia River Basin PIT-Tag Information System (PTAGIS)- PSMFCProiect Officer: P. PoeQbjectives:1. To develop, operate,maintain, <strong>and</strong> enhance a longtermColumbia River Basin-widedatabase of information onPIT-tagged <strong>fish</strong> to ensure thatall PIT-tag information isavailable in a timely <strong>and</strong> usefulmanner to all state, Federal,Tribal <strong>and</strong> other interestedentities.Date Initiated: May 19901. 1991: Operate, maintain, <strong>and</strong> enhanceColumbia River PIT-tag systems <strong>and</strong> database.Results/Conclusions: PTAGIS officeestablished at the Pacific States Marine 2. Continuing: BPA will continue to fundFisheries Commission (PSMFC) in Portl<strong>and</strong>. PTAGIS.Progress in transfer of responsibilityof operation <strong>and</strong> maintenance of PIT-tagsystems from the NMFS to PTAGTS.


PROJECT;\IUMBERI TITLEPROJECT STATUSSCHEDULE AND MILESTONES90-80 2. To perform all othercont. activities related to ColumbiaRiver PIT-tag systems including:maintenance <strong>and</strong> documentationof <strong>fish</strong> tagging <strong>and</strong> interrogationsystems; operation <strong>and</strong> maintenanceof equipment at the remote sites.Provision of technical support forsoftware <strong>and</strong> hardware; provisionof training to users; <strong>and</strong> purchaseof PIT-tags <strong>and</strong> associatedequipment.III. NEW PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES90-60 Bypass Evaluations New ProjectProiect Officer: W. MaslenObjectives:1. Determine <strong>fish</strong> guidingefficiency of prototype bypassscreens.2. Determine <strong>fish</strong> guidingefficiency of installed bypassscreens.3. Evaluate various means toimprove <strong>fish</strong> guiding efficiencyof bypass screens.FY 1991: Prototype testing of st<strong>and</strong>ardlength submersible traveling screens<strong>and</strong> evaluation of sluiceway effectivenessat the Ice Harbor Clam.FY 1991 <strong>and</strong> beyond: Provide funding asnecessary to conduct prototype <strong>and</strong>post-installation testing of bypass screens(<strong>and</strong> sluiceway where appropriate), as providedin the Fish Spill Memor<strong>and</strong>um of Agreement.


VII, NON-ACTION ITEM PROJECTS2 6 5


awc):'0"k 423:~-s4YlE ‘0”k3i z”. L .Iz I c0 0I .-2% mPI .rcc,3 .rIE2 6 6


VIII, NON-PROGRAM, INTERNAL SUPPORT PROJECTSThis section of the AIWP lists <strong>and</strong> describes BPA Division of Fish <strong>and</strong> Wildlifeinternal support projects. These projects do not implement measures in theProgram <strong>and</strong> were not subject to PRG review as part of the IPP. The projectsare included in the AIWP to help the PRG <strong>and</strong> the public to better underst<strong>and</strong>what BPA is doing.267


J. COMPLETED PROJECTSNone.IT. FY 1989 ONGOING PROJECTS1)PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILFSTONES85-87-01 Anadromous Fish MitigationAnalysis Assistance - RFFProiect Officer: S. DeteringObjectives: To provide fortechnical participation inCouncil effort to developCommon Analytical Methods <strong>and</strong>to assist in developing inhousecapabilty for <strong>fish</strong>modeling with workshops focusedon cost-effectiveness (C-E) ofmitigation alternatives.Date initiat&: April 1987Results/Conclusions: C-E analysistechnical participation in review ofSub<strong>basin</strong> Plans has provided a formatthat the Council has decided to usein review of all Sub<strong>basin</strong> Plans. BPAFish-Power Modeling Workshops havedeveloped the nucleus for a modelingteam within BPA.Expect this project to terminatethis FY. New activites listed in88-125.FY 1991: Shift Analytical Methods Work Group<strong>and</strong> MEG support to new contract (Project 88-125).86-118 Fish <strong>and</strong> Wildlife Task OrderAgreement - BPNLProiect Officer: R. AustinQbiectives: To supplementthe limited staff <strong>and</strong> timeresources of BPA's Division ofFish <strong>and</strong> Wildlife with theservices of a professionalcontractor (BPNL), who canprovide technical assistanceon a wide variety of tasks.Date initiatd: June 1986Results/Conclusions: Nine taskorders have been completed under thismaster task order agreement: (1) SpringChinook Outplanting, (2) Production/CostRecords, (3) Yakima Hatchery Master Plan,(4) Yakima Flow Enhancement, (5) YakimaHatchery Master Plan II, (6) Smolt SurvivalWorkshop, (7) Predator/Prey Workshop,(8) Hatchery Effectiveness TWGWorkshop, (9) Anadromous Fish ReleaseWorkshop. If the task order implementsa Program project, the task order islisted in the AIWP under the appropriateAction Item.FY 1991: Continue funding master task orderagreement. Initiate individual technicalassistance tasks orders as required by BPAstaff.


PROJECTNUMBER TITLE PROJECT STATUS e87-413 Fish <strong>and</strong> Wildlife Task OrderAgreement, Fisheries TechnicalAssistance - UWProjert Officer: Il. JohnsonObiectives: To assist thelimited staff <strong>and</strong> time resourcesof BPA's Division ofFish <strong>and</strong> Wildlife through theservices of a uniquelyqualified professional staffable to provide technicalassistance on diverse <strong>fish</strong><strong>and</strong> <strong>wildlife</strong> issues.Date Initiated: September 1987J&.ults/ConclusiQns: Numerous taskorders have been completed under thismaster task order agreement, including1) review of Project 84-46, Developmentof a Vaccine for Bacterial KidneyDisease in Salmon; 2) review of BPA'sanadromous <strong>fish</strong> passage assessmentmethods; 3) review of relevantstatistics <strong>and</strong> reports on populationdynamics of Hanford Reach fall chinooksalmon; <strong>and</strong> 4) conduct of a smoltsurvival workshop. If the task orderimplements a Program project, the projectis listed in the AIWP under the appropriateAction Item.FY 1991: Continue funding master task orderagreement. Initiate individual technicalassistance task orders as required by BPAstaff.89-108 Columbia River SalmonPassage Model - UWProject Officer: D. JohnsonQbiectives:1. Replace FISHPASS model.2. Develop graphical input<strong>and</strong> output features.3. Develop Monte Carlo <strong>and</strong> multiyearanalytical capabilities4. Integrate database system.5. Develop <strong>and</strong> calibratemechanistic submodels.6. Develop model documentation.7. Perform model analysis8. Test statistical models9. Develop life stage components.Date Initiated: 1988 1. Continuing: The contractor will provideResults/Conclusions: Work completedreports regarding all objectives.to date: Beta versions of the model for 2. Early 1990: Complete objectives 1, 2, <strong>and</strong> 3.objectives 1, 2, <strong>and</strong> 3.3. Late 1990: Complete objectives 4, 5, <strong>and</strong> 6.4. 1991: Complete objectives 7 through 10.5. Objective 11 is ongoing objective.


PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILESTONES89-108 10. Interface cost-effectiveness(cont.) algorithms.11. Coordinate with other entities.89-47 Technical Assistance Date Initiated: 1989 Continuing: Schedule <strong>and</strong> milestones vary with timing- Consultant of issues <strong>and</strong> receipt of proposals.Project Officer: Il. Johnson8biectives:1. Provide recommendations on<strong>fish</strong> passage related research<strong>and</strong> monitoring;2. Assist in development ofresearch designs.ResultsKonslusionS: Various technicalrecommendations on Water BudgetEffectiveness <strong>and</strong> Reservoir Mortalityhave been made to BPA.89-62 Implementation Planning Process Date Initiated: May 1989 FY 1991: BPA plans to continue funding the IPP(IPP) Coordination - PSMFCCoordination contract.ResultsKonclusionL: BPA has funded anProject Officer: J. Gislason IPP Coordinator position with theCBFWA through a contract with the PSMFC.Objectives:Through this contract, BPA also reim-1. Facilitate communication burses most of the SRG members oramong BPA, CBFWA, Policy Review their employers for the time that theGroup (PRG), Scientific Review members spend on SRG activities.Group (SRG), <strong>and</strong> IPP ScopingGroups (St's).2. Ensure the timely deliveryof all PRG, SRG, <strong>and</strong> SG workproducts required by the IPP.3. Administer financial support(time <strong>and</strong> travel expense reimbursement)of non-Federal SRGscientists.


PROJECTNUMBER TITLE PROJECT STATUS SCHEDULE AND MILFSTONFS89-72-1 Scientific Review Group (SRG) Date Initiaa: September 1989 FY 1991: BPA plans to continue funding thisSupport - DOEcontract.Results/Conclusiw: BPA providesProject Officer: J. Gislason financial support for one SRG memberthrough this contract.Qbiectives: To provide financialsupport (time <strong>and</strong> travel expensereimbursement) for SRG scientistemployed by DOE.90-93 Genetic Analysis of Date Initiated: August 1990Qncorhvnchu nerka (for EndangeredSpecies Act) - UIProiect Officer: G. BouckQbiectives:Phase I:1. Collect Q. nerka foranalysis.2. Refine DNA analysis.3. Develop a plan for Phase II.Phase II: Objectives to bedefined.Results/Conclusions: None atthis time.1. FY 1991: Complete Objectives 1 <strong>and</strong> 2 byNovember 15, 1990; complete Objective 3 byDecember 1, 1990.2. FY 1992: Complete Phase II by December 31,1991.


III. NEW PROJECTSPROJECTNUMBER TITLE PROJECT STATUS SCHEDUlE AND MILESTONES88-125 Anadromous Fish Planning <strong>and</strong> New ProjectImplementation Decision SupportSystem - RFFProiect Officer: S. DeteringFY 1991: Assist Council in completing C-E analysisof all Sub<strong>basin</strong> Plans. Prepare multi-stock C-Emodels. Prepare C-E comparison of all passage <strong>and</strong>production alternatives consistent with BPA passagealternatives.mctives:1. Assist regional entities tocomplete cost-effectiveness(C-E) analysis of alternativesin all Sub<strong>basin</strong> Plans.2. Compare existing <strong>and</strong> proposed<strong>fish</strong> passage alternativeswith propagation alternativesof Sub<strong>basin</strong> plans.3. Review methods used toevaluate effectiveness <strong>and</strong> costof plan options.4. Identify direct <strong>and</strong> opportunitycost of changes in waterdiversions.5. Long Term: Complete modelcomponents needed for C-Eanalysis of mitigation issues,including training <strong>and</strong> assistanceneeded for use of modelsby analysts in the region.FY 1991-92: In coordination with theAnalytical Methods Work Group, UW's Center forQuantitative Science, <strong>and</strong> OSU, completemitigation decision support system models <strong>and</strong> userguides, <strong>and</strong> provide user support. Review methodsused to evaluate effectiveness <strong>and</strong> cost of planoptions.(VS6-PJSP-3633W)


IX. APPENDIXLETTERS OF COMMENT ON THEDRAFT FY 1991 AIWPA - l


United StatesDepartment ofAgricultureForestServicePacific319 S.W. Pine StreetNorthwest P.O. Box 3623Region Portl<strong>and</strong>, OR 97208-3623Reply To: 2600Date: August 10, 1990Mr. John PalenskyBonneville Power AdministrationPO Box 21Portl<strong>and</strong>, OR 97208Dear Mr.Palensky:My <strong>fish</strong>eries staff has reviewed the Draft 1991 Columbia Basin Fish <strong>and</strong> WildlifeProgram Annual Implementation Work Plan <strong>and</strong> agree with many of the HabitatImprovement <strong>and</strong> Passage Enhancement selections. These projects, aimed atrestoring stream habitat capability to full potential, will play an importantrole in maintaining the genetic viability of wild stocks in the Columbia.The selection of several hatchery augmentation, <strong>and</strong>/or supplementation <strong>program</strong>sgenerates some concern. Review of the CBFWA memor<strong>and</strong>um generated by theScientific Review Group on the Hatchery Effectiveness Work Plan indicates thatnumerous information deficiencies exist with hatchery effectiveness.Specifically, more information is needed on the potential impacts of increasedhatchery production on wild-stocks. In light of increasing concern onmaintaining genetic diversity <strong>and</strong> identity of these stocks, we suggest thatemphasis be placed on those proposals that serve to answer these questions, orpromote existing natural <strong>and</strong> wild-stock diversity.Thank you for the opportunity to respond to the 1991 Annual Implementation WorkPlan. Strengthening communication between Fisheries Management Agencies willserve to better meet the established Columbia Basin goals.b-d EBERNIE RIOSActing Columbia Basin Coordinatorcc:Harv Forsgren - R4Rick Stowell - RlGordon Haugen - WO Fish <strong>and</strong> WildlifeA - 3


ADDENDUM TO FY 1991 AIWPREDUCTION LISTThe projects listed in the table below were in the Draft FY 1991 AIWP, but were recommended for deferral, modification, or deletion by thePRG to reconcile the AIWP with BPA's FY 1991 Fish <strong>and</strong> Wildlife Program budget. BPA incorporated the PRG's recommendations in the finalFY 1991 AIWP.PROJEClftPJNUMBERTITLEACTION/RATIONALEF1107 87-112Orofino Creek Passage, IdahoThe project is deferred in FY 91. Not ready for constructionin FY 91. Funds were left in FY 91 budgetfor possible trap-<strong>and</strong>-haul pre-design activities.F1113 88-160Bio-Engineering Eva1 of Oxygen SupplementationThe Michigan raceway portion of this project will bedropped. Consensus of <strong>fish</strong> culturists was that theMichigan raceway was not needed to answer questionsthat the project was intended to answer.F1113 89-06589-06689-06991-03891-039Analysis of CWT Prog Missing Production OR/WAAnalysis of CWT Prog Missing Production WAAnalysis of CWT Prog Missing Production ORAnalysis of CWT Prog Missing Production WAAnalysis of CWT Prog Missing Production OR(USFWS)(WW(ODFW)(WDW)(IFG)Ongoing projects to continue until current FY 91contracts expire; FY 91 funds deleted from BPA'sbudget. New projects deleted from FY 91 AIWP.Projects were dropped until an adequate <strong>program</strong> forcoded-wire tagging can be developed.F1113 89-099Hatchery Water Quality SurveyProject dropped in FY 91. Project not started yet.Agencies <strong>and</strong> Tribes/SG willing to drop project inFY 91.F1113 91-02191-02491-032IHN Rapid DiagnosisControl of Whirling DiseaseIHNV EvolutionDrop projects in FY 91. These were the lowest priorityprojects of the Artificial Propagation SG. Notimplementing these proposed new projects would havethe least impact. In general, research is a lowerpriority of the PRG in FY 92/93.Ad Hoc Committee (VS6-6123W)