13. <strong>Sharma</strong>, M. L. and H. R. Wason. (1994)Occurrence <strong>of</strong> low stress drop earthquakes inGarhwal Himalaya region, Physics <strong>of</strong> theEarth and Planetary Interior, 85, pp 265-272.14. <strong>Sharma</strong>, M. L. (1992) Sample telemetereddigital seismic array in Garhwal Himalaya -S<strong>of</strong>tware and data management, HimalayanSeismicity Memoir No. 23, Geo. Soc. <strong>of</strong>India, pp 67-80.PAPERS PRESENTED ININTERNATIONAL/NATIONAL CONFERENCES –401. Narayan, J. P., M. L. <strong>Sharma</strong> and AshwaniKumar (2002) Local Site effects observedduring Bhuj earthquake, Workshop on BhujEarthquake, IIT Kanpur, January 27-29.2. Ameer, A. S., M. L. <strong>Sharma</strong> and H. R.Wason (2002) Completeness <strong>of</strong> earthquakecatalogue and its implications in earthquakehazard estimation – a case study for Iraq. 12Symposium on Earthquake Engineering,<strong>Roorkee</strong>, Dec. 16-18, 2002, Vol I, 342-3493. Ameer, A. S., M. L. <strong>Sharma</strong> and H. R.Wason (2002) Maximum likelihoodestimation <strong>of</strong> seismic hazard for Iraq fromcomplete data files, 12 Symposium onEarthquake Engineering,, <strong>Roorkee</strong>, Dec. 16-18, 2002, Vol I, 306-310.4. Narayan, J. P., M. L. <strong>Sharma</strong> and AshwaniKumar (2002) Damage survey report: Bhujearthquake, January 26, 2001, 12 Symposium
on Earthquake Engineering, <strong>Roorkee</strong>, Dec.16-18, 2002, Vol II, 727-736.5. Saini S., M. L. <strong>Sharma</strong> and S.Mukhopadhyay (2002) Strong groundmotion empirical attenuation relationship forseismic hazard estimation in Himalayaregion, 12 Symposium on EarthquakeEngineering, <strong>Roorkee</strong>, Dec. 16-18, Vol I,143-150.6. <strong>Sharma</strong>, M. L., M. Khan and M. K. Arora(2002) A GIS based approach for seismichazard assessment, Asian Seismologicalcommission 2002, Symp. On Seismology,earthquake hazard assessment and riskmanagement, 24-26 Nov, 2002, kathmandu,Nepal, p-437. <strong>Sharma</strong>, M. L. and M. Arora (2002)Cyclic behavior <strong>of</strong> seismicity in theHimalayas and its prediction using ANN,Asian Seismological commission 2002,Symp. On Seismology, earthquake hazardassessment and risk management, 24-26Nov, 2002, kathmandu, Nepal, p-158-159.8. <strong>Sharma</strong>, M. L. (2002) SeismicMicrozonation <strong>of</strong> Mega cities, Indo-Chinajoint workshop on Natural disasters, Jan.21-23,2002, New Delhi.9. Narayan, J. P., M. L. <strong>Sharma</strong> and A. Kumar(2001) Local site effects during the Bhujearthquake <strong>of</strong> January 26, 2001, Report onBhuj Earthquake, DST Report (in press).10. Wason, H. R., M. L. <strong>Sharma</strong> and D.Nandini (2001) Aftershock activity <strong>of</strong> theChamoli earthquake <strong>of</strong> march 29, 1999recorded by broadband seismograph
- Page 1 and 2: M. L. Sharmamukutfeq@iitr.ernet.inA
- Page 3: the Himalayas and its vicinity from
- Page 7 and 8: Jan. 26, 2001, News Letter, Indian
- Page 10 and 11: Earthquake Engineering, Roorkee, No
- Page 12 and 13: (Submitting proposal forextension)(
- Page 14 and 15: 1 M.Sc.PhysicsDesign and Fabricatio
- Page 16 and 17: TOPDEPARTMENTAL CONSULTANCY PROJECT
- Page 18 and 19: site, BiharDelhi24. Discussion for
- Page 20 and 21: combined gas based power plant proj
- Page 22 and 23: 7. EQ: 2002-05 (2002) Site specific
- Page 24 and 25: 21. EQ: 2001-01 (2001) Site specifi
- Page 26 and 27: (Members Ashwani Kumar, A. D. Pande
- Page 28 and 29: 46. EQ : 99-01 (1999), Site specifi
- Page 30 and 31: “Seismological Network around Teh
- Page 32 and 33: 1995), (Members Ashwani Kumar, A. D
- Page 34 and 35: Earthquake Engineering, Roorkee (Me
- Page 36: 96. Status report (1987), Deploymen