13.07.2015 Views

visakhapatnam steel plant materials management ... - Vizag Steel

visakhapatnam steel plant materials management ... - Vizag Steel

visakhapatnam steel plant materials management ... - Vizag Steel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. Samplers for the collection of hot metal.6. Samplers for the collection of liquid <strong>steel</strong>.7. Lances for taking the samples.8. 2-wire contact block.9. 4- Wire contact block.10. End connector.11. 4-pin male and female plug.12. Handle.13. 2-core mineral insulated metal sheathed (MIMS) cable.14. 4-core mineral insulated metal sheathed (MIMS) cable.15. 2-core compensating cable.16. 4-core compensating cable.17. Trailing cable.18. All types of lance accessories and consumables.4.0 Maintenance:Regular comprehensive maintenance of the following equipment in allrespects:1. Liquid Metal Temperature measuring instruments -6 Nos.2. Oxygen ppm measuring instruments -7 Nos.3. Hydrogen ppm measuring instruments -1No.4. Large displays for the above measuring systems.5. Signalling circuits along with hooters and lamp compartments for theabove measuring instruments.6. Associated cables upto instrument terminals.7. Calibration instruments such as checkmates.8. Checking the cabling circuit and replacement of the same in case of anytrouble.9. Calibration of the above instruments as per VSP’s QMS (ISO 9001) andpreparation of the calibration certificates.10. Traceability certificates of the secondary master instruments such asdigital multimeters are also to be submitted.11. All lance consumables, required compensating cables, male femaleplugs, instrument cable (If required), laying from field to instrumentincluding its protection shall be considered in the scope of supply.5.0 Operational Requirement:Minimum number of temperature /oxygen/Hydrogen measuring lances to be keptready at different places:TLC1&2- Three (3) Nos Temperature measuring lances per TLCLD Converter 1&2— Three (3) Nos. Temperature& Oxygen ppm measuringlances Per ConverterCCM1, 2 &3- Three (3) Nos Temperature measuring lances per MachineLHF1&2- Three (3) Nos Temperature& Oxygen ppm measuring lances for eachLadle FurnaceARS1&2- Three (3) Nos Temperature& Oxygen ppm measuring lances for eachARSHMDP- Three (3) Nos Temperature measuring lances8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!