13.07.2015 Views

Panorama Mall Technical Tenant Criteria Manual - Macerich

Panorama Mall Technical Tenant Criteria Manual - Macerich

Panorama Mall Technical Tenant Criteria Manual - Macerich

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Panorama</strong> <strong>Mall</strong>8401 Van Nuys Blvd, Los Angeles, California 91402PLUMBING CRITERIA (cont’d.)<strong>Tenant</strong>s must submit calculations to the Landlord which show the size selectionor basis of capacity of all equipment and piping.Gas ServiceAll new development and newly <strong>Tenant</strong>ed restaurants need to have seismicgas shut-off valves installed on Landlord side of the meter, at each individualspace. Seismic valves must be:code. <strong>Tenant</strong>s are required to provide for the upkeep and maintenance forsuch vertical exhaust duct and related devices and materials.All sanitary sewer and plumbing vent piping shall comply with all local codes.1. UL-approved;2. FM-approved; or,3. ACSE 25-compliant.All devices must be installed consistent with manufacturer’s instructions andfollowing jurisdictional code.Gas may be available at the Center. <strong>Tenant</strong>, at its sole cost and expenseand in compliance with local code must procure gas service to and within thedemised premises and will make all necessary arrangements with the localGas Company for such service. <strong>Tenant</strong> is responsible for installation of a gasmeter at the gas meter header.Pressure regulators and piping required for connection to <strong>Tenant</strong>’s equipmentis the responsibility of the <strong>Tenant</strong>. Coordinate with Landlord for regulator ventrouting.Gas piping on the roof must be placed on pillow blocks or similar arrangement.Seismic Gas Shutoff ValveAll <strong>Tenant</strong>s who use or have a gas line installed for their premises, or equipmentthat serves their premises, are required to install a code and Landlordcompliantseismic gas shut off valve on the main gas line serving the space.Ventilation<strong>Tenant</strong>s will provide vertical exhaust ducts at a location designated by Landlord.All hood exhaust must be connected to vertical duct in accordance with<strong>Tenant</strong> Design <strong>Criteria</strong>Section t <strong>Technical</strong> <strong>Criteria</strong>Updated: December 2012<strong>Technical</strong> <strong>Criteria</strong>t10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!