- Page 1: Assessment of theIrish Ports & Ship
- Page 5: Youth Center 695-8522 (after 4 PM)
- Page 9 and 10: Table 6.1: The 25 largest offshore
- Page 11 and 12: Executive SummaryThis study of Irel
- Page 13: 1.0 IntroductionInitially, this rep
- Page 16 and 17: Table 2.1: Offshore wind projects i
- Page 18 and 19: In addition to the offshore develop
- Page 20 and 21: 2.3 Wave resource in the Republic o
- Page 22 and 23: Figure 2.3: Location of wave energy
- Page 24 and 25: several small islands located near
- Page 26 and 27: The resource charts illustrate how
- Page 28 and 29: 2.7 Summary - Northern IrelandBased
- Page 30 and 31: The 4,500 MW scenario could also po
- Page 32 and 33: 3.0 Geographic Distribution of Iris
- Page 34 and 35: 4.0 Assessment of Offshore Support
- Page 36 and 37: MPI ResolutionIn January 2010 the i
- Page 38 and 39: operated by Dutch company Seaway He
- Page 40 and 41: 3. Галагузова Ю.Н., Ш
- Page 42 and 43: Each of these companies and the ass
- Page 44 and 45: Irish Mainport HoldingsThe Mainport
- Page 46 and 47: Sinbad Marine ServicesSinbad Marine
- Page 48 and 49: Fastnet Shipping LtdFastnet Shippin
- Page 50 and 51: Pacific Blue LtdThe Pacific Blue fl
- Page 52 and 53: The Burke Shipping GroupThe Burke S
- Page 54 and 55: MSV International LtdMSV Internatio
- Page 56 and 57:
Construction, deployment and O&M ve
- Page 58 and 59:
6.0 Port Infrastructure Demand Anal
- Page 60 and 61:
Manufacture and foundation producti
- Page 62 and 63:
Helicopter transport for O&MOffshor
- Page 64 and 65:
6.2 Other factors influencing choic
- Page 66 and 67:
Ireland’s wave resource is largel
- Page 68 and 69:
Choice of port may be made several
- Page 70 and 71:
7.1 Irish ports’ experience in th
- Page 72 and 73:
Installation of MCT device using cr
- Page 74 and 75:
7.2 Ports - existing facilities and
- Page 76 and 77:
Belfast Harbour / Harland & WolffPr
- Page 78 and 79:
WarrenpointProximity to MainTest Be
- Page 80 and 81:
DroghedaProximity to MainTest Beds
- Page 82 and 83:
permissions for new developments an
- Page 84 and 85:
WaterfordProximity to MainTest Beds
- Page 86 and 87:
Port of Cork / Cork DockyardProximi
- Page 88 and 89:
CastletownbereProximity to MainTest
- Page 90 and 91:
as supporting resources in the regi
- Page 92 and 93:
Killybegs FHCProximity to MainTest
- Page 94 and 95:
7.3 OE developments - summary of po
- Page 96 and 97:
will not be available to service th
- Page 98 and 99:
Table 8.1: Anticipated numbers of o
- Page 100 and 101:
Table 8.2: Indicative number of por
- Page 102 and 103:
8.3 Manufacturing facility associat
- Page 104 and 105:
industrial plants at coastal locati
- Page 106 and 107:
Tidal energy opportunities will be
- Page 108 and 109:
The granting of permissions for har
- Page 110 and 111:
ports to develop infrastructure wit
- Page 112 and 113:
10.2.3 This report identifies a spa
- Page 114 and 115:
HOS Iron HorseAs an example of a Mu
- Page 116 and 117:
AHTS vessels differ from PSVs in be
- Page 118 and 119:
SMIT Marine Projects is one company
- Page 120 and 121:
A2SEA Sea Power is identical to Sea
- Page 122 and 123:
design, incorporating the same high
- Page 124 and 125:
Seacore jackupFugro Seacore has dev
- Page 126 and 127:
Shearleg crane barger. Cable-lay Dy
- Page 128 and 129:
There are only around 10 jack-up cr
- Page 130 and 131:
Sea Installer will take the install
- Page 132 and 133:
Similarly, Swire Blue Ocean parent
- Page 134 and 135:
no more than 1000 MW in-feed loss f
- Page 136:
65,000m 2 WeserWind offices.Besides
- Page 139:
Ports’ perspectiveFrom the ports