13.07.2015 Views

Reports on Visits of Inspection held on 21st September, 2012 PDF ...

Reports on Visits of Inspection held on 21st September, 2012 PDF ...

Reports on Visits of Inspection held on 21st September, 2012 PDF ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Health, Welfare and Safety Panel <strong>Visits</strong>Date 21 st <strong>September</strong> <strong>2012</strong>at all times.10:30 Bramley Sunnyside Junior School, (C<strong>on</strong>tinued)Water Coolers in the school were serviced 3 weeks ago.Fire Exit Steps to the fr<strong>on</strong>t <strong>of</strong> the building are covered in mossand need cleaning.Caretaker to carry out11:00 The Willow, School,Locksley Drive, Thurcr<strong>of</strong>t, S66 9NTPresent:Sue Smith (Admin/Data),Ralph Crosby (Vocati<strong>on</strong>al Instructor) &Wendy Lloyd (Building Manager)Outside Areas:There are several trip hazards <strong>on</strong> the footpath up to the centre,such as, drain covers, and depressi<strong>on</strong>s at the edge <strong>of</strong> the paths.- These need to be addressed.Recepti<strong>on</strong>:Loose ceiling tiles – There need to be additi<strong>on</strong>al supportslocated in the ceiling void to prevent the tiles from falling <strong>on</strong>clients or visitors.Life Skills Bungalow:The footpath needs attenti<strong>on</strong> as this path is very narrow and isnot suitable for disabled assess.Vocati<strong>on</strong>al Centre:FFE tested May <strong>2012</strong>PAT testing completed in June <strong>2012</strong>.To be inspected by Building manager <strong>on</strong> next scheduled visitTo be inspected by Building manager <strong>on</strong> next scheduled visitTo be inspected by Building manager <strong>on</strong> next scheduled visit

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!