13.07.2015 Views

Technical Specification for A.C. Single Phase, 2 Wire ... - WBSEDCL

Technical Specification for A.C. Single Phase, 2 Wire ... - WBSEDCL

Technical Specification for A.C. Single Phase, 2 Wire ... - WBSEDCL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

During the manufacturing of the meters the following checks shall be carried out.i) Meter frame dimensions tolerances shall be minimum.ii) The assembly of parts shall be done with the help of jigs and fixtures so thathuman errors are eliminated.iii) The meters shall be batch tested on automatic, computerized test bench andthe results shall be printed directly without any human errors.The Bidder shall invariably furnish the following in<strong>for</strong>mation along with his bid,failing which his bid shall be liable <strong>for</strong> rejection. In<strong>for</strong>mation shall be separatelygiven <strong>for</strong> individual type of material offered.‣ Statement giving list of important raw materials, names of subsuppliers<strong>for</strong> the raw materials, list of standards according to which theraw materials are tested, list of tests normally carried out on rawmaterials.‣ In<strong>for</strong>mation and copies of test certificates in respect of bought outaccessories.‣ List of manufacturing facilities available.‣ Level of automation achieved and lists of areas where manual processingexists.‣ List of areas in manufacturing process, where stage inspections arenormally carried out of quality control and details of such tests andinspections.‣ List of testing equipment available with the bidder <strong>for</strong> final testing ofequipment specified and test-plant limitations, if any, vis-à-vis type, specialacceptance and routine tests specified in the relevant standards and thisspecification. These limitations shall be very clearly brought out in scheduleof deviations.The manufacturer laboratory must be well equipped <strong>for</strong> testing of the meters.They must have computerized standard power source and standard equipmentcalibrated not later than a year (or as per standard practice). The details of testingfacilities available <strong>for</strong> conductinga) The routine tests.b) Acceptance tests shall be furnished with the bid.7. MANUFACTURING ACTIVITIESAll the materials, electronics and power components, ICs used in the manufactureof the meter shall be of highest quality and reputed make to ensure higherreliability, longer life and sustained accuracy.The manufacturer should use Application Specific Integrated Circuit (ASIC) orMicro controller <strong>for</strong> metering functions.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!