13.07.2015 Views

Reference system for Wire EDM machining. The standard range.

Reference system for Wire EDM machining. The standard range.

Reference system for Wire EDM machining. The standard range.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

THE MATERIAL REMOVAL CAPACITYOF THE WIRE <strong>EDM</strong> MACHINES hasbeen significantly improved over the past decades. <strong>The</strong>table shows values obtained by experience in coarse<strong>machining</strong>.So over the past 25 years, the material removalcapacity has increased almost by a factor of 15. Finefigures, but the question is: does the user exploit thisincreased capacity, or is it a hidden resource?Material removal mm 3 /min300500Introduction25020080150351980 1985 1990 1995 2000 2005Tooling-up time in astationary machineOVER THE SAME PERIOD tooling-uptimes have remained largely unchanged. Let us takean example with an ordinary <strong>machining</strong> operation of4200 mm 3 .1980: 4200 mm 3 /35 + 30 min tooling-up time inthe machine = 150 minutes’ machine time.2005: 4200 mm 3 /500 + 30 min tooling-up timein the machine = just over 39 minutes’machine time.Active <strong>machining</strong> time39Four times as fast, but far from the 15-fold capacityincrease offered by the machine! So only 25% of thecapacity increase offered by investing in a modernwire <strong>EDM</strong> machine is exploited.1985 1990 1995 2000 2005IF YOU HAD HAD THE FORESIGHTin 1980 to equip your machine with the System3R reference <strong>system</strong> <strong>for</strong> pre-setting away from themachine, the figures look like this.1211980: 4200 mm 3 /35 + 1 min tooling-up time inthe machine = 121 minutes’ machine time.Tooling-up time in astationary machine2005: 4200 mm 3 /500 + 1 min tooling-up time inthe machine = just over 9 minutes’machine time.25 years successful technical development of themachines has meant a huge potential increase inproductivity in wire <strong>EDM</strong> <strong>machining</strong>. Do you get thefull benefit of this potential? 39 or 9 minutes <strong>for</strong> thesame <strong>machining</strong> operation? <strong>The</strong> choice is yours.Active <strong>machining</strong> timeCan your company af<strong>for</strong>d to work without theSystem 3R reference <strong>system</strong>?1985 1990 1995 2000 200595

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!