13.07.2015 Views

Height 160mm, rm = running meter - Rekord Holzmann

Height 160mm, rm = running meter - Rekord Holzmann

Height 160mm, rm = running meter - Rekord Holzmann

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fo<strong>rm</strong>work boardFo<strong>rm</strong>work board HBmade of wood concreteMaterial: wood concrete 14mm with plastic strips,Element length: 2500mm,optional with concrete contact (extra charge for concretecontact agent: 1.65 3/<strong>running</strong> <strong>meter</strong>), special heights on request.TypeElement height in mmItem noPacking unit m/palletWeight kg/<strong>running</strong> <strong>meter</strong>Price 5/<strong>running</strong> <strong>meter</strong>2020030051 R250mca. 4kg10.252525030052 R250mca. 5kg11.203030030053 R250mca. 6kg12.103535030054 R250mca. 7kg13.054040030055 R187.5mca. 8kg14.005050030056 R125mca. 10kg14.90Fo<strong>rm</strong>work board FBaus FaserbetonMaterial: fibrated concrete 18 – 26mm depending on size,element length: 1300mm,optional with concrete contact (extra charge for concretecontact agent: 1.65 3/<strong>running</strong> <strong>meter</strong>).TypeElement height in mmItem noPacking unit m/palletWeight kg/<strong>running</strong> <strong>meter</strong>Price 5/<strong>running</strong> <strong>meter</strong>2020030051120.90mca. 5.5kg9.402525030052110.50mca. 7.5kg11.30303003005365mca. 9.5kg12.50404003005465mca. 12kg16.30The fo<strong>rm</strong>work board is used as an inexpensive ceiling edge solution atconcrete -walls. The fo<strong>rm</strong>work board is nailed into the fo<strong>rm</strong>work withthe smooth side showing outwards. The thickness of the concrete ceilinglater to be installed, must be considered (upper edge of fo<strong>rm</strong>workboard = upper edge of concrete ceiling). The profiles on the inner sideof the fo<strong>rm</strong>work board will build a force-closed connection with theconcrete. In order to achieve a force-closed connection with the concrete,we recommend using the rekord concrete contact agent. After completingthe concrete fo<strong>rm</strong>work, the fo<strong>rm</strong>work board remains in the concreteas part of the construction. A further fo<strong>rm</strong>work of the ceiling tobe installed can be dropped.Gaps and slots can be bridged without any problem by simply puttingthe fo<strong>rm</strong>work board with the profile side up and concrete can be filled.All prices plus VAT.13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!