13.07.2015 Views

RECOMMENDED CONSTRUCTION OF WIRE ... - Saudi Aramco

RECOMMENDED CONSTRUCTION OF WIRE ... - Saudi Aramco

RECOMMENDED CONSTRUCTION OF WIRE ... - Saudi Aramco

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

COMMON RULES & INFORMATIONIf ship’s anchors must be used as an extreme emergency measure, theyshould not be used in the direction of the seabed pipeline or within 600meters (2000 feet) of the Buoy.COMMON RULES& INFORMATIONLine handling during mooring and unmooring shall be performed by theship’s staff under instructions of the Pilot/Mooring Master.Both port and starboard derricks shall be rigged and ready to lift the hoseconnecting equipment basket from the launch from either side. A trolleyshould be available to transport this equipment about the vessel’s deck.The following vessel’s equipment should be ready on the forecastle head.• Large crow bar.• Large flashlight for night mooring.• A messenger lines 24 to 28 millimeter diameter, 150 meters inlength.• Winch drum or empty spool drum to heave onboard the mooringpick up rope.Note: Where possible, the mooring line(s) should lead through a “Panamachock” in the center of the bow, rather than through a single portor starboard bow fairlead as this produces less tendency to yaw.Power should be switched on the winches (mooring deck equipment) onthe forecastle and to the derricks or cranes at the ships manifold thatshould be made ready to lift the ancillary mooring and hose handlingequipment. Manifold should be made ready.Terminal personnel will check that all equipment for mooring and hoseconnecting operations are on board the launch and in working order priorto departure. Items such as chain hoists, gaskets, wrenches, flange boltsets, butterfly valve handles, ullaging equipment, sample bottles, etc.,may be required and placed on board.PREPARING THE FORECASTLE HEADShip’s staff will prepare the forecastle head for the mooring operationat the instruction of the Pilot/Mooring Master.PREPARING THE PORT SIDE MANIFOLD(Note: <strong>Saudi</strong> <strong>Aramco</strong> SPM terminals have been designed for portmanifold vessels only.)71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!