Presentation issued without formal editingFOR PARTICIPANTS ONLY23 April 2013ENGLISH ONLYUNITED NATIONSCENTRE FOR REGIONAL DEVELOPMENTIn collaboration withMinistry <strong>of</strong> Transportation, Government <strong>of</strong> IndonesiaMinistry <strong>of</strong> the Environment, Government <strong>of</strong> JapanSEVENTH REGIONAL EST FORUM IN ASIA&GLOBAL CONSULTATION ON SUSTAINABLE TRANSPORT IN THE POST 2015 DEVELOPMENT AGENDA,23-25 APRIL 2013, BALI, INDONESIA<strong>The</strong> <strong>Development</strong> <strong>of</strong> <strong>Indonesian</strong> <strong>Railways</strong>(Presentation for Plenary Session 7 <strong>of</strong> the Provisional Programme)Final Draft-------------------------------------This presentation has been prepared by Mr. Hanggoro Budi Wiryawan, for the Seventh Regional EST Forum in Asia. <strong>The</strong> views expressed herein are those <strong>of</strong> theauthor only and do not necessarily reflect the views <strong>of</strong> the United Nations.Disclaimer: <strong>The</strong> designations employed and the presentation <strong>of</strong> the material in this publication do not imply the expression <strong>of</strong> any opinion whatsoever on thepart <strong>of</strong> the Secretariat <strong>of</strong> the United Nations concerning the legal status <strong>of</strong> any country, territory, city or area or <strong>of</strong> its authorities, or concerning the delimitation <strong>of</strong>its frontiers or boundaries.


Ministry <strong>of</strong> TransportationDirectorate General <strong>of</strong> <strong>Railways</strong>Republic <strong>of</strong> IndonesiaTHE DEVELOPMENT OF INDONESIAN RAILWAYS7 th Regional Environmentally Sustainable Transport (EST) Forum23-25 April 2013Bali, Indonesia


OUTLINEMaster Plan for Acceleration and Expansion <strong>of</strong><strong>Indonesian</strong> Economic <strong>Development</strong> (MP3EI)Sustainable Mass TransportationStrategic Railway ProjectsUrban Railway ProjectsMinistry <strong>of</strong> Transportation – Directorate General <strong>of</strong> <strong>Railways</strong>


Ministry <strong>of</strong> Transportation – Directorate General <strong>of</strong> <strong>Railways</strong>1[Master Plan for Acceleration andExpansion <strong>of</strong> <strong>Indonesian</strong> Economic<strong>Development</strong> (MP3EI)]


THE VISION[for Acceleration and Expansion <strong>of</strong> Indonesia Economic <strong>Development</strong> 2011 – 2025 (MP3EI)]~ 12 largest~ 8 largest8 – 9 % per annum 5 – 6 % per annum


Main StrategyLOGICALFRAMEWORKOF THEMASTERPLAN


Vision <strong>of</strong> National Railway on 2030a. 12.100 Km National <strong>Railways</strong> Network on 2030 (Jawa-Bali Island, Sumatera, Kalimantan, Sulawesiand Papua) including 3.800 km urban railways network.b. Passenger Rollingstock: 2.805 unit locomotive, 27.960 unit passenger coachs.c. Freight Trains Rollingstock: 1.995 unit locomotive and 39.655 unit freight wagons.‣ Railway share 11-13% for passenger and 15-17% for freight transport‣ 10,000 km <strong>of</strong> railway network, double-track, electrification <strong>of</strong> Java mainlines‣ Trans Sumatra railways network‣ as backbone <strong>of</strong> mass transportation in cities/urban areas‣ the operation <strong>of</strong> Argo Cahaya (High Speed Train/ HST) in Java‣ railways as the backbone <strong>of</strong> freight transport in Kalimantan, Sulawesi,Papua‣ integrated, secured, safe, comfortable, reliable, and affordable <strong>of</strong>services


Railway Project on Economic Corridors<strong>Development</strong> <strong>of</strong>intercity railway (Sigli-Bireun-Lhokseumawe172 Km)Dev. BandarTinggi-Kuala TanjungRailway & Access toSei-MangkeIndustrial Area• Dev. Of M.Enim-Tj.Carat Railway• Dev. Of Tj.Enim-Lampung RailwayDev. Of PurukCahu-Tj.Issuy Railway(203 Km)Dev. Of Muara Wahau-Lubuk Tutung Railway(150 Km)25 railway project with an investment upto IDR. 200 trilion• GOI Investment: IDR 80 trilion• State Co. Investment: IDR 13 trilion• PPP investment: IDR 111 trilionDev. <strong>of</strong> Araskabu-KualanamuRailwaySource: Presidential decree No. 32/2011______(MP3EI)Kalimantan EconomicCorridorDouble tracking &Electrification Duri-Tangerang Line &Serpong-Maja-Rangkasbitung Line<strong>Development</strong> JakartaMRT (North-South)Line -24 KmSoetta AirportRailwayDev. Of DoubleDoubleTrackingManggarai-Cikarang &Electrification Bekasi-CikarangJavaEco.CorridorElectrification <strong>of</strong>Citayam-Nambo (16Km)ElectrificationPadalarang - Bandung- Cicalengka (41,8 km)And Double TrackingKiaraCondong-Cicalengka (22,5 km)DoubleTrackingJava North-Line(Pekalongan-Semarang- 87,9 Km)DoubleTrackingJava North-Line(Semarang-Bojonegoro-Surabaya-280 km)<strong>Development</strong> <strong>of</strong>Surabaya Urban<strong>Railways</strong><strong>Development</strong> <strong>of</strong>Juanda AirportRailwayReplacement <strong>of</strong>Porong/Lapindotrack (25 km)


Ministry <strong>of</strong> Transportation – Directorate General <strong>of</strong> <strong>Railways</strong>2[Sustainable Mass Transportation]


Transportation Issueshigh growth<strong>of</strong> populationhigh demand <strong>of</strong>movement> 70 % roadbasedtransportationusing privateowned vehicle• mostly usingprivate ownedvehicle•induce variouspollution,inefficient energyconsumptionrail basedtransportation•environmentallyfriendly mode <strong>of</strong>transportation•the pro: largecapacity, requireless space/land,less fuelconsumption(comparing withthe capacity)•furthermore, wehave to SHIFT thedemand from“road-based” into“rail-based”


Railway <strong>Development</strong> Policy <strong>of</strong> ESTSTRATEGY POLICY PROGRAM<strong>The</strong><strong>Development</strong> <strong>of</strong><strong>Railways</strong>Network andServices1. Increasing role <strong>of</strong> railas mass transportationin urban area;2. Increasing communityaccess to rail service;3. Integrating rail servicewith another modes.1. <strong>Development</strong> <strong>of</strong>urban railway networkand services;2. <strong>Development</strong> <strong>of</strong>railway access to portand airport;3. Integrated trainservices (with anothermodes) byTransitOriented<strong>Development</strong> (TOD)concept.


Ministry <strong>of</strong> Transportation – Directorate General <strong>of</strong> <strong>Railways</strong>3[Strategic Railway Projects]


1. Double Track Rail Project (Java North Line) -450 Km


... Cont’dObjective:•To cope with the traffic growth, especially freight transport;•To enhance safety, speed and punctuality <strong>of</strong> rail services;•To reduce heavy load on road;•To improve safety, speed and comfort on road.<strong>The</strong> InvestmentFund Source: USD 1 Billion: Government <strong>of</strong> IndonesiaStatus:Physical progress on March 2013: 67,88%, the detail are as follows:•Cirebon-Brebes 75,86%•Pekalongan-Semarang 64,71%•Semarang-Bojonegoro 77,68%•Bojonegoro-Surabaya 41,87%<strong>The</strong> Challenge:•Land acquisition•Removal <strong>of</strong> Utilities, Gas Pipe along the railway,•Soil condition , Swam Area•Limited budget•Utilization <strong>of</strong> local material like bamboo•Squatter•Local economic activity•Flood


2. Double Track Rail Project (Java South Line) -610 KmMerakSERANGDKIJAKARTACikampekBantenBogorPadalarangSukabumiBANDUNGJawa BaratCirebon -PrupukBojonegoroCirebonBojonegoroTegalPekalonganSEMARANGGambringanBojonegoroPrupukJawa TengahGundihPurwokertoJawa TimurBanjarMadiunKertosonoKroyaKutoarjoSoloBangilDIY Kutoarjo - Yogya Malang -YOGYAKARTASoloBlitarPurwokerto -Kroya -KutoarjoPrupuk-PurwokertoSolo - MadiunMadiun -SurabayaSURABAYASidoarjoJemberBanyuwangiDouble Track Java South Line Rail Project (CIREBON – YOGYA – SURABAYA): 610 kmCIREBONPURWOKERTOKUTOARJOSOLOMADIUNSURABAYAPRUPUKKROYA• Rev. Design(2011)• Land Aqusition(2011)• Construction(start 2012)• Loan IP-548YOGYA74 km 56 km 28 km 76 km123 km• DTConstruction2013 - 2014• FundAllocation bySBSN Rp.1,5 T 2013 Rp.0,8 T 2014 Rp.0,7 TFinish /Operatedat the end <strong>of</strong>2011Design 2011Finish / Operated at200797 km• 2011 - 2012Track design, bridge& signal• 2013• EIA & Larap• Roadbed cons.IDR.15 M• Total investment :IDR. 2,33 Trilion156 km• 2011 - 2012Track design, bridge &signal• 2014• EIA & Larap• Construction (start 2015)• Total Investment:IDR. 3,59 Trilion


... Cont’dObjective:•To cope with the traffic growth, especially freight transport;•To enhance safety, speed and punctuality <strong>of</strong> rail services;•To reduce heavy load on road;•To improve safety, speed and comfort on road.Progress:1.Cirebon – Pupuk (74 km) :•Financing through SUKUK (SBSN) on fiscal year 2013 – 2014•Civil work contract is already signed .2.Purwokerto – Kroya (28 km) :•Detailed Engineering Design (DED) already finish, proposed financing by Loan JICA.3.Kroya – Kutoarjo (76 km) :•Financing through Loan JICA IP-548;•Civil work procurement on process, target <strong>of</strong> contract signed at the end <strong>of</strong> 2013.•Construction plan : 2014-2017.4.Solo – Paron (70 km) :•Detailed Engineering Design already finish, proposed financing by Loan JICA.5.Paron – Madiun – Surabaya (183 km) :•DED: 2013-2014;•Construction plan: 2015.<strong>The</strong> Challenge:• New funding scheme (Sukuk/SBSN), in preparation <strong>of</strong> technical guidelines (MoF)• Land acquisitionBridge ConstructionPatuguran-KarangsariBridge ConstructionPatuguran-KarangsariDouble Track Karanggandul-Purwokerto


3. Rail Access to Seaport and Airport (North Sumatera)Rail Access to Kuala Tanjung Seaport and Access to Industrial Area (Sei-Mangke)Palm FarmingSiteSei MangkeiIndustrialClusterKuala TanjungPerlanaanObjective:• to support Domestic Connectivity and providerail access to industrial zone• <strong>The</strong> investment : Rp. 594.6 Billion• Fund Source: GOI’s BudgetProgram:• Connect industry to new Kuala Tanjungseaport• Improvement <strong>of</strong> existing track betweenPerlanaan-Gunung Bayu.• Construction <strong>of</strong> new track to industrial area(Sei-Mangke) – PTPN-IIIRubber FarmingSiteGunungBayuNORTH SUMATERA


... Cont’dRail Access to Kualanamu AirportStasiunMedanStasiunBdr KhalifahStasiunBatang Kuis+ 4 KMStasiunAras KabuObjective :1. Provide acces railroad to Kualanamu Airport;2. Supporting domestic connectivity program .Fund Source: Government <strong>of</strong> Indonesia<strong>The</strong> Investment : IDR 695 BillionProgram :1.Improvement 23 km existing track between Medan-Araskabu (finished on 2012)2.<strong>Development</strong> new single track from Araskabu-Kualanamu(4,8 Km) with investments <strong>of</strong> PT. KAI (running test onNovember 2012);3.<strong>Development</strong> <strong>of</strong> double track from Medan-Araskabu (23Km) :• DED already finish on 2012, Bridge and SignallingDesign will finished on 2013;• Land acquisition and construction started on 2014.Construction <strong>of</strong> the track Running Test (Nov 2012)


Ministry <strong>of</strong> Transportation – Directorate General <strong>of</strong> <strong>Railways</strong>4[Urban Railway Projects]


<strong>Development</strong> <strong>of</strong> Jabodetabek <strong>Railways</strong>Commuter Line Airport RailwayExpress Line Airport Railway<strong>Development</strong> <strong>of</strong>PASOSO – JICT Railway<strong>Development</strong> <strong>of</strong>Double TrackingDuri – TangerangMRT Jakarta<strong>Development</strong> <strong>of</strong> DoubleDouble TrackManggarai – Cikarang<strong>Development</strong> <strong>of</strong> TanahAbang – Serpong – Maja– Merak Line


Cont’d …Jabodetabek RailwayDouble-Double Tracking Between Manggarai-CikarangPurpose :.Increasing line capacity, so the volume <strong>of</strong> train travel canbe higher.Objective:Strategic Projects to separate the operation betweencommuter trains & long-distance trains , to preventbottlenecks traffic when double track north <strong>of</strong> Java hasbeen operated in 2014.Investment: IDR 8.3 TrilionStatus:•<strong>The</strong> contract <strong>of</strong> electrification work (package B1) betweenBekasi-Cikarang already Signed on October 2012.•Package B2(2) & Package A proposed fund by SUKUK(SBSN2014)Program 2013:•Electrification Bekasi-Cikarang (Loan JICA)•Infrastructure enhancement between Jatinegara-Bekasi•Bridge construction (Jatinegara-Bekasi)•Land aquisition (on Package A site)


Cont’d …Jabodetabek RailwayDouble Track & Electrification Serpong-Maja-Rangkasbitung (49 Km)Purpose :.Increasing line capacity, so the volume <strong>of</strong> train travel can be higher.Objective:1.Extended <strong>of</strong> commuter-line services;2.Separate the short/medium-distance rail to long distance trains3.Increase railway safety level/open the access to the Soekarno-Hatta AirportInvestment: IDR 1.5 Trilion


Cont’d ......Jabodetabek RailwayMRT Jakarta (North-South)Bund. HI Underground StationBlok A StationPurpose :.Contribute to improving the public transportation system and the socioeconomicin JakartaObjective:Increasing Jakarta transportation capacity through the construction <strong>of</strong> a massrapid transport system, thereby reducing traffic congestion, which in turncontribute to the improvement <strong>of</strong> the investment climate in JakartaMetropolitan area.Investment:USD 1.658 million (Phase 1)USD 1.414 million (Phase 2)Status:•Preparatory Survey for Jakarta Mass Rapid Transit System North-South LineExtension Project already done on 2010•Additional budget for construction MRT N-S Phase-1 and Consulting ServiceMRT N-S Phase-2 has been approved (SK Menteri PPN/Bappenas101/M.PPN/HK/11/2012) and already stated on Bluebook Revision (DRPPLN-JM 2012)•Portion <strong>of</strong> loan payment for central government 41% and local government59%•Engineering Services for MRT phase 2 already stated on Bluebook Revision(DRPPLN-JM 2012)


Cont’d ......Jabodetabek Utilization ImprovementEMU Jabodetabek Line UtilizationImprovement (2011-2014)Jabodetabek Railway• 5 New Station (Mampangbaru,Roxy, Matraman,Tomang, Bandengan)• 5 Transit Station(Manggarai, Tanah Abang, Duri,Jatinegara, Kampung Bandan)• 9 Station Interconnected With8 Transjakarta Coridor(Sudirman, Jakarta Kota, Juanda,Gambir, Mampang, Matraman,Tomang, Tanjung Priuk, PasarSenen)• 5 Station With Taxi RankFacility (Jatinegara, Manggarai,Pasar Senen, Gambir, Juanda)• 10 Station With Park and RideFacility (Bogor, Cilebut,Bojonggede, Depok, Bekasi,Serpong, Sudimara, Pondok Ranji,Poris, Tangerang)Legend:= Exisitng Station= New Station= Transjakarta Interconnected= Transit Station= Taxi Rank <strong>Development</strong>


Electrification & DoubleTracking Padalarang-Bandung-CicalengkaElectrification Padalarang-Bandung-Cicalengka (41,8 Km)Double Track KiaraCondong-Cicalengka(22,15 Km)Location: Bandung, West JavaPurpose :1.Improve public services <strong>of</strong>railways;2.Reduce congestion level <strong>of</strong>Padalarang-Cicalengka roadway;3.Improve the quality <strong>of</strong> theenvirontment.Investment : IDR. 1,772 TrillionFund Source : Government(APBN) , Loan from FranceDouble Track(Existing) (19,65 Km)Double Track (Plan)Status:•already stated on BluebookRevision (DRPPLN-JM 2011-2014)•Feasibility study Phase-1 andPhase-2 already finished (Francegovernment grant)


Surabaya Urban RailwayPurpose:•Realizing the urban railway transport inSurabaya•Reduce congestion level <strong>of</strong> SurabayaAreaProgram:1.Construction and Elektrificationbetween Kandangan-Sidoarjo Line;2.Double tracking & electrificationbetween Lamongan-Porong andMojokerto;3.Double tracking & electrificationbetween Waru Station and JuandaAirport (Airport train service);4.Reactivation track from Tarik toSidoarjo


Mamminasata Urban RailwayPurpose:• Realizing the urban railway transportin South SulawesiProgram:1.<strong>Development</strong> <strong>of</strong> urban railwayconnected with Hasanuddin Airport;2.<strong>Development</strong> <strong>of</strong> urban railwayconnected with Makasar port;3.<strong>Development</strong> <strong>of</strong> urban railway thatconnected with Makasar and Maros,Sungguminasa and Takalar(Mamminasata).Investment:Double track : IDR 15,08 trillionSingle track : IDR 8,5 trilliuon


Ministry <strong>of</strong> TransportationDirectorate General <strong>of</strong> <strong>Railways</strong>Republic <strong>of</strong> IndonesiaTHANK YOUKarsa Building, 2 nd floorJl. Medan Merdeka Barat No. 8Jakarta,Indonesiahttp://perkeretaapian.dephub.go.id/