13.07.2015 Views

Download PDF - Prologis

Download PDF - Prologis

Download PDF - Prologis

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

06prologis newsSustainability Update• Global 100: <strong>Prologis</strong> has been included in the 2013“Global 100 Most Sustainable Corporations in the World”.Recognised as the world’s most credible corporatesustainability ranking, the Global 100 comprises topperforming companies worldwide based on a range ofsector-specific ‘sustainability’ metrics.• Sustainability Ratings: <strong>Prologis</strong> has 38 million square feet in11 countries certified by BREEAM, LEED, CASBEE, DGNBor Association HQE.• Solar Power: <strong>Prologis</strong> has developed a portfolio of more than80 megawatts of photovoltaic system installations in fivecountries to support cost-effective clean energy generation.• Going the Extra Mile: <strong>Prologis</strong> has provided an electriccar and charging facility at <strong>Prologis</strong> Park Cologne-Eifeltor,to be used by Objectflor, a Cologne-based designer floorspecialist, for the duration of its lease. The electric car willhelp Objectflor cut CO 2emissions while travelling betweenits sites in Rodenkirchen and Eifeltor.”Work Starts at Hartland ParkIndicative master plan of hartland park<strong>Prologis</strong> and M&G Investments, are moving ahead with plans toredevelop Hartland Park, a 119 acre former Ministry of Defencesite close to Junction 4a of the M3 at Farnborough. A demolitionprogramme is now underway and the site will be ready for thestart of construction work in 2014.Hartland Park has detailed planning permission for a total of1.32 million square feet of distribution space in buildings from27,000 square feet upwards. “Hartland Park is one of the fewsites in the south east that can accommodate a wide range ofindustrial, distribution and data centre requirements,” said PaulWeston, Senior Vice President at <strong>Prologis</strong>.“Now that detailed planning permissionis in place and the demolition contractorsare on site, we are in a position to enterserious discussions with potential occupiersseeking new facilities for occupation from2015 onwards.”

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!