04.12.2012 Views

Our main goal is: ”Quality Procedures and Outstanding ... - GTT

Our main goal is: ”Quality Procedures and Outstanding ... - GTT

Our main goal is: ”Quality Procedures and Outstanding ... - GTT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GT Tækni ltd.<br />

Mechanical department<br />

The mechanical department <strong>is</strong> divided into four<br />

areas. Mechanical work shop, Metal work shop,<br />

Vehicle work shop <strong>and</strong> Production area where<br />

metal electrode casing for Icel<strong>and</strong>ic Alloys are<br />

produced.<br />

The area that GT Tækni has for the mechanical<br />

department <strong>is</strong> a hall of 1.000 m2 <strong>and</strong> 10 m height.<br />

There are four large doors high. There are two<br />

overhead cranes of 5 tons each <strong>and</strong> one 16 tons<br />

lift in the Vehicle workshop. The workshops are<br />

well equipped for all mechanical <strong>and</strong> electrical<br />

work <strong>and</strong> <strong>main</strong>tenance.<br />

Production<br />

In our production line the Company produces<br />

annually 1.000 pcs of metal electrode casings.<br />

The dimension of each casing <strong>is</strong> 2m in height <strong>and</strong><br />

Electrical department<br />

The Electrical department <strong>is</strong> divided into two areas,<br />

the Electric shop <strong>and</strong> the Electronic shop. The<br />

area that GT Tækni has for the electrical<br />

department <strong>is</strong> approximately 115 m2. The Electric<br />

shop <strong>is</strong> equipped with 1 tons overhead crane <strong>and</strong> a<br />

large door. The workshops are well equipped for<br />

all electrical work high or low voltages, electronic<br />

work <strong>and</strong> <strong>main</strong>tenance.<br />

The electrical department has license to operate in<br />

general electrical work (B-license) <strong>and</strong> in the high<br />

voltage electrical work (A- license). The electrical<br />

1,8 m in diameter.<br />

Page 3<br />

Working on productin of electrode<br />

casing for Icel<strong>and</strong>ic Alloys<br />

In our Vehicle shop nothing <strong>is</strong> impossible.<br />

Repair of cars, fork lifts, trucks <strong>and</strong> everything<br />

on wheels or belts from bicycles to over 40 tons<br />

container truck lift. We have special knowledge<br />

in hydraulic systems in stocking cars. The<br />

stoking cars are rebuilt in our Vehicle shop so<br />

they can take the load when stoking in extreme<br />

hot environment in the FeSi furnaces.<br />

In the Vehicle shop there long experience in servicing :<br />

Hyster – Caterpillar – Kalmar – Case – Still - Volvo – Komatzu – Brokk – Clark<br />

department also has the responsibility <strong>and</strong><br />

licenses for all electrical equipments in the<br />

Hvalfjördur tunnel.<br />

The electrical department h<strong>and</strong>les all general<br />

repair <strong>and</strong> <strong>main</strong>tenance as well as renewal <strong>and</strong><br />

rebuilding of electrical equipments.<br />

The electrical department serves the whole<br />

electrical spectrum within the heavy industry,<br />

from the low voltages to the extreme high<br />

voltage end of the industry.<br />

In the electrical department there <strong>is</strong> much experience in working with:<br />

ASEA – Siemens – <strong>and</strong> ABB high voltage equipments – PLC- A <strong>and</strong> B license

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!