13.07.2015 Views

an Integrated Litter Management Strategy - Townsville State of the ...

an Integrated Litter Management Strategy - Townsville State of the ...

an Integrated Litter Management Strategy - Townsville State of the ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>an</strong>d undergo regular reviews. Operational pl<strong>an</strong>s are a road map for achieving<strong>the</strong> outcomes identified in <strong>the</strong> corporate pl<strong>an</strong>. Budgets are developed eachyear <strong>an</strong>d like <strong>the</strong> operational pl<strong>an</strong>s undergo a three monthly review.Operational pl<strong>an</strong>s require perform<strong>an</strong>ce indicators to determine if <strong>the</strong> outcomesare being achieved.5.0 LITTER BIN INFRASTRUCTURE AND SERVICES5.1 Review existing situationBefore <strong>an</strong>y detailed <strong>an</strong>alysis c<strong>an</strong> be undertaken, signific<strong>an</strong>t “base line” dat<strong>an</strong>eeds to be determined.The number <strong>of</strong> litter bins within <strong>the</strong> town / cityThe number <strong>of</strong> bins within each suburbThe size <strong>of</strong> each binThe frequency <strong>of</strong> its collection.The amount <strong>of</strong> litter in <strong>the</strong> bin when it is collected.The location <strong>of</strong> each bin.Placement <strong>of</strong> bins onto a geographic information system.The condition <strong>of</strong> each binThe estimated life <strong>of</strong> each bin.The remaining life <strong>of</strong> each bin.Annual budget allocation for litter bins.The mapping <strong>of</strong> this data onto a GIS will allow information for each bin to bestored within <strong>the</strong> system <strong>the</strong>refore providing a good m<strong>an</strong>agement tool form<strong>an</strong>aging <strong>the</strong>se assets.5.2 CostsBin prices r<strong>an</strong>ge from $70.00 for <strong>the</strong> supply <strong>of</strong> a st<strong>an</strong>dard 240 litre wheelie binto several thous<strong>an</strong>ds <strong>of</strong> dollars for elaborate bin enclosures similar to thatcurrently in use on <strong>Townsville</strong>’s Str<strong>an</strong>d.The life expect<strong>an</strong>cy <strong>of</strong> conventional litter bins is approximately three to fiveyears. To ensure effective m<strong>an</strong>agement <strong>of</strong> <strong>the</strong>se assets, a full cost pricingmodel should be used to evenly spread <strong>the</strong> expenditure on litter bins over<strong>the</strong>ir effective life. From <strong>the</strong>se figures <strong>an</strong> <strong>an</strong>nual replacement cost c<strong>an</strong> becalculated for budget purposes.A detailed <strong>an</strong>alysis <strong>of</strong> litter bins in <strong>the</strong> <strong>Townsville</strong> City Council area iscontained in Appendix 4.<strong>Litter</strong> bin locations throughout <strong>Townsville</strong> are mapped at Appendix 5.Page 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!