- Page 1:
ENVIRONMENTAL AND SOCIAL RISKMANAGE
- Page 4 and 5:
PREFACEProfessor Sir Peter Crane FR
- Page 6 and 7:
Synthesis report on the Yale-WWF wo
- Page 8 and 9:
up of environmental and social stan
- Page 10 and 11:
game. There are prior examples of C
- Page 12 and 13:
expectations, including commercial
- Page 14 and 15:
Trade is a good thing. It is a way
- Page 16 and 17:
Going beyond compliance to mitigate
- Page 18 and 19:
These policy documents collectively
- Page 20 and 21:
4. Peru’s conflicting lawsThe Per
- Page 22 and 23:
contradictions in Peru’s legal re
- Page 25 and 26:
in natural resources that are essen
- Page 27 and 28:
Organization of American States. 20
- Page 29 and 30:
creating and maintaining positive r
- Page 31 and 32:
China Minmetals: Protecting Bio-Div
- Page 33 and 34:
The Corporation maintained and expa
- Page 35 and 36:
operations in Australia. The projec
- Page 37 and 38:
Case: Flood Relief Donations to Que
- Page 39 and 40:
1. Outward foreign direct investmen
- Page 41 and 42:
third country is often not directly
- Page 43 and 44:
financial returns and reputation. 1
- Page 45 and 46:
From 2005-2014, around a half of Ch
- Page 47 and 48:
Analytical framework of OFDI’s en
- Page 49 and 50:
(2) Identify the key business playe
- Page 51 and 52:
high environmental and social sensi
- Page 53 and 54:
and economic interests overseas. Th
- Page 55 and 56:
In recent years, there is an increa
- Page 57 and 58:
outlets that cover environmental an
- Page 59 and 60:
Main goals:(1) Understand the main
- Page 61 and 62:
Internationalregime11&12131415&16Un
- Page 63 and 64:
producer and important tungsten, ir
- Page 65 and 66:
environmental pollution, and was se
- Page 67 and 68:
Fig. 3 Distribution of the Río Bla
- Page 69 and 70: From the beginning, the concerns ab
- Page 71 and 72: First, the project should consider
- Page 73 and 74: or comply better with Peru’s dome
- Page 75 and 76: pollute the already meagre water re
- Page 77 and 78: understand the importance of establ
- Page 79 and 80: copper project. 25 After the projec
- Page 81 and 82: the mine of the Toromocho Project a
- Page 83 and 84: avoid further conflicts in the host
- Page 85 and 86: Besides the reports from NGOs, unde
- Page 87 and 88: Rio Blanco Project, Piura. This rep
- Page 89 and 90: industries developed on their ances
- Page 91 and 92: 87Fig. 6 Timeline of the Rio Blanco
- Page 93 and 94: Besides Peru and China, the U.K. al
- Page 95 and 96: 91Fig. 7 The main relation links be
- Page 97 and 98: China407.318Vietnam329.390Singapore
- Page 99 and 100: It is expected to provide between 3
- Page 101 and 102: historical and cultural heritage si
- Page 103 and 104: Fig. 3. Myitsone Hydropower Project
- Page 105 and 106: elated engineering studies; highway
- Page 107 and 108: Box 3 & 4: Environmental and social
- Page 109 and 110: CDB have arranged strategic lines o
- Page 111 and 112: taken steps to strengthen the stand
- Page 113 and 114: Box 10: Political stakeholders in o
- Page 115 and 116: impacts that could reasonably be ex
- Page 117 and 118: (1) Planning Phase (before 2007)The
- Page 119: Unlike the Rio Blanco case, the gov
- Page 123 and 124: organizational capacities in addres
- Page 125: AcknowledgementsThe editors would l