30.07.2015 Views

AWS specifications - North Eastern Space Applications Centre

AWS specifications - North Eastern Space Applications Centre

AWS specifications - North Eastern Space Applications Centre

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.2.3.1. If the offer is withdrawn during the period of validity of theoffer or any agreed extension.3.2.3.2. If the offer is modified/altered without the knowledge ofNESAC.3.2.3.3. If the tenderer backs-out.3.2.3.4. If the tenderer attempts to procure the contract byfurnishing false/incorrect documents and by giving falsedeclarations.3.3. The EMD of the unsuccessful bidders shall be returned within areasonable time or after expiry of the validity period. No interest shallbe paid by NESAC on EMD.3.4. Any offer without the EMD shall be summarily rejected.4. General Terms and Conditions4.1. The AMC called is tentatively for all the 117 <strong>AWS</strong>s (as per Annexure1) installed by ISRO in NE states as onsite basis. The actual no. of<strong>AWS</strong> to be brought under AMC may change before finalisation.4.2. The rate quoted for AMC of each <strong>AWS</strong> shall be inclusive of all costincluding travel, fooding, lodging of the engineers visiting the sites.4.3. The vendor shall take up the AMC for all the stations mentioned inAnnexure 1.4.4. If any vendor does not wish to take AMC for any <strong>AWS</strong>, the bid shallbe summarily rejected.4.5. Vendor shall submit the technical bid and commercial bidseparately in different envelops. The technical bid shall be openedfirst and the commercial bid of only those vendors who qualify thetechnical bid shall be opened for the final consideration. All thesupporting documents only excluding the cost of the system shall beincluded in the technical bid.4.6. The vendor should have a satellite earth station to receive the datatransmitted by the <strong>AWS</strong>s. Necessary documentary evidence shall besubmitted along with the bid.5. System availability and fault recognition5.1. A particular <strong>AWS</strong> under AMC or individual sensors must be availablefor at least 90% of the time.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!