31.07.2015 Views

Press Lines # 2 - CBI industrial asset management

Press Lines # 2 - CBI industrial asset management

Press Lines # 2 - CBI industrial asset management

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Blanking <strong>Lines</strong>Seokyung• Technical Data 2/2Detail Unit B-1 B-2 B-3 B-4 B-5 AOBISpeed spm 15 - 45 20 - 45 25 - 75 25 - 75 8 - 24 15 - 40Feed Direction:Leftto-RightRightto-LeftRightto-LeftBackto-FrontRightto-LeftLeftto-RightFeed Level:Metricmm 500 TBA 400 400 TBA 241Feed Level: Inch mm 804 not applicableFeed Pitch: mm 25 - 3683 TBACoil dimensions:Strip thickness:min - maxmm 0.50 - 2.26 TBAProgrammable0.53 -5.96ProgrammableTBACWPFeeder(2005)Programmable0.50 - 3.00 TBA 4.74Strip width:min - max:mm 304 - 1828 TBA25.4 -609152 - 1828 TBA 25 - 457Coil weight -maxInside diameter:min - maxOutsidediameter:min - maxStacking details:Current status:Tons 37 TBA 7.5 37 TBA 4mm 482 - 660 TBA546 -673482 - 660 TBA 533 - 609mm 914 - 2032 TBA 1828 914 - 2032 TBATwin Stackers withoverhead blanktransporter andLeft/Right stacking.OperationalOn standbyoffline:nonoperationalManualoperationOnstandby /nonoperational1524maxPRESS Promotion22SEOKYUNG ENGINEERING CO., LTD. T) +82-2-2047-7614, F) +82-2-2047-7609, e-mail) bhlee@seokyung.co.krS-28, 8th Floor, Tool Bldg, Garden5, Munjeong-dong, Songpa-gu, Seoul, 138-200, Korea

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!