31.07.2015 Views

Supply on hire of Transportable Buildings and Portable Toilets ...

Supply on hire of Transportable Buildings and Portable Toilets ...

Supply on hire of Transportable Buildings and Portable Toilets ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• provisi<strong>on</strong> <strong>of</strong> a St<strong>and</strong>by Crew during the event period for maintenance <strong>and</strong>rectificati<strong>on</strong>. Allowance shall include stocks <strong>of</strong> materials <strong>on</strong> site required toundertake such alterati<strong>on</strong>s or additi<strong>on</strong>s.Approximate numbers <strong>of</strong> transportable buildings required are as follows:• 2 No. <strong>of</strong> 12.0m x 6.0m complexes;• 49 No. <strong>of</strong> 12.0m x 3.0m buildings• 15 No. <strong>of</strong> 9.6m x 3.0m buildings• 88 No. <strong>of</strong> 6.0m x 3.0m buildings• 22 No. <strong>of</strong> 3.6m x 2.4m buildings• 1 No. shower blockApproximate numbers <strong>of</strong> portable toilets required are as follows:• 20 No. <strong>of</strong> 6.0m x 3.0m ‘VIP’ sewer c<strong>on</strong>nected toilet blocks• 46 No. <strong>of</strong> 6.0m x 3.0m sewer c<strong>on</strong>nected toilet blocks• 3 No. <strong>of</strong> disabled sewer c<strong>on</strong>nected toilet units• 16 No. <strong>of</strong> 6.0m x 3.0m ‘VIP’ pump out toilet blocks• 44 No. <strong>of</strong> 6.0m x 3.0m pump out toilet blocks• 14 No. <strong>of</strong> disabled pump out toilet units• 12 No. <strong>of</strong> 16 user pump out toilet blocks• 74 No. <strong>of</strong> 1.2m x 1.2m single pump out toilet unitsParticular attenti<strong>on</strong> will be paid to the presentati<strong>on</strong> <strong>and</strong> appearance <strong>of</strong> all facilities. Onlythe best quality portable buildings will be selected for use <strong>and</strong> the successfulc<strong>on</strong>tractor(s) must present a high quality finished product. Further to this a porti<strong>on</strong> <strong>of</strong>the buildings may be required to be customised in order to meet the clients’requirements.In general, 60% <strong>of</strong> pans required shall be male <strong>and</strong> 40% shall be female.The Scope <strong>of</strong> ServicesThe Scope <strong>of</strong> Services required under this C<strong>on</strong>tract shall include, but not be limited to:• preparati<strong>on</strong> <strong>and</strong> implementati<strong>on</strong> <strong>of</strong> externally accredited Quality Systems,C<strong>on</strong>tract HS&E Plan <strong>and</strong> detailed c<strong>on</strong>structi<strong>on</strong> schedules;

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!