31.07.2015 Views

Supply on hire of Transportable Buildings and Portable Toilets ...

Supply on hire of Transportable Buildings and Portable Toilets ...

Supply on hire of Transportable Buildings and Portable Toilets ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Supply</str<strong>on</strong>g> <strong>on</strong> <strong>hire</strong> <strong>of</strong> <strong>Transportable</strong> <strong>Buildings</strong> <strong>and</strong> <strong>Portable</strong> <strong>Toilets</strong>OverviewThe following document provides additi<strong>on</strong>al informati<strong>on</strong> regarding the majorrequirements for the supply <strong>on</strong> <strong>hire</strong> <strong>of</strong> <strong>Transportable</strong> <strong>Buildings</strong> <strong>and</strong> <strong>Portable</strong> <strong>Toilets</strong>for future Formula 1 TM Australian Gr<strong>and</strong>s Prix events to be held at Albert Park,Melbourne. The event is typically held in March over a four day period (Thursday toSunday inclusive), however a c<strong>on</strong>siderable amount <strong>of</strong> facilities are required to becompleted well prior to the event.Installati<strong>on</strong> <strong>of</strong> infrastructure to support the event is carried out over an eight week buildperiod with dismantle beginning immediately following the event. Full dismantle isrequired within four weeks <strong>of</strong> the event.The Scope <strong>of</strong> WorksThe works under this C<strong>on</strong>tract shall include but not be limited to:• preliminaries including provisi<strong>on</strong> <strong>of</strong> own site facilities;• supply, installati<strong>on</strong>, preparati<strong>on</strong> for use <strong>and</strong> removal <strong>of</strong> transportable buildings asspecified;• supply, installati<strong>on</strong>, preparati<strong>on</strong> for use <strong>and</strong> removal <strong>of</strong> portable toilets asspecified;• supply, installati<strong>on</strong>, preparati<strong>on</strong> for use <strong>and</strong> removal <strong>of</strong> window fittings <strong>and</strong>coverings, e.g. blinds <strong>and</strong> security grilles if required;• supply, installati<strong>on</strong>, preparati<strong>on</strong> for use <strong>and</strong> removal <strong>of</strong> internal building partiti<strong>on</strong>s<strong>and</strong>/or lockable doors if required; <strong>and</strong>


• provisi<strong>on</strong> <strong>of</strong> a St<strong>and</strong>by Crew during the event period for maintenance <strong>and</strong>rectificati<strong>on</strong>. Allowance shall include stocks <strong>of</strong> materials <strong>on</strong> site required toundertake such alterati<strong>on</strong>s or additi<strong>on</strong>s.Approximate numbers <strong>of</strong> transportable buildings required are as follows:• 2 No. <strong>of</strong> 12.0m x 6.0m complexes;• 49 No. <strong>of</strong> 12.0m x 3.0m buildings• 15 No. <strong>of</strong> 9.6m x 3.0m buildings• 88 No. <strong>of</strong> 6.0m x 3.0m buildings• 22 No. <strong>of</strong> 3.6m x 2.4m buildings• 1 No. shower blockApproximate numbers <strong>of</strong> portable toilets required are as follows:• 20 No. <strong>of</strong> 6.0m x 3.0m ‘VIP’ sewer c<strong>on</strong>nected toilet blocks• 46 No. <strong>of</strong> 6.0m x 3.0m sewer c<strong>on</strong>nected toilet blocks• 3 No. <strong>of</strong> disabled sewer c<strong>on</strong>nected toilet units• 16 No. <strong>of</strong> 6.0m x 3.0m ‘VIP’ pump out toilet blocks• 44 No. <strong>of</strong> 6.0m x 3.0m pump out toilet blocks• 14 No. <strong>of</strong> disabled pump out toilet units• 12 No. <strong>of</strong> 16 user pump out toilet blocks• 74 No. <strong>of</strong> 1.2m x 1.2m single pump out toilet unitsParticular attenti<strong>on</strong> will be paid to the presentati<strong>on</strong> <strong>and</strong> appearance <strong>of</strong> all facilities. Onlythe best quality portable buildings will be selected for use <strong>and</strong> the successfulc<strong>on</strong>tractor(s) must present a high quality finished product. Further to this a porti<strong>on</strong> <strong>of</strong>the buildings may be required to be customised in order to meet the clients’requirements.In general, 60% <strong>of</strong> pans required shall be male <strong>and</strong> 40% shall be female.The Scope <strong>of</strong> ServicesThe Scope <strong>of</strong> Services required under this C<strong>on</strong>tract shall include, but not be limited to:• preparati<strong>on</strong> <strong>and</strong> implementati<strong>on</strong> <strong>of</strong> externally accredited Quality Systems,C<strong>on</strong>tract HS&E Plan <strong>and</strong> detailed c<strong>on</strong>structi<strong>on</strong> schedules;


• inventory c<strong>on</strong>trol, including submissi<strong>on</strong> <strong>of</strong> a list <strong>of</strong> additi<strong>on</strong>al materials ifrequired <strong>and</strong> a detailed inventory up<strong>on</strong> delivery <strong>and</strong> packing <strong>of</strong> c<strong>on</strong>tainersincluding the quantity, c<strong>on</strong>diti<strong>on</strong> <strong>and</strong> locati<strong>on</strong> <strong>of</strong> all assets, where applicable;• review <strong>and</strong> acceptance <strong>of</strong> survey data provided by others, including locati<strong>on</strong><strong>of</strong> underground services;• cooperati<strong>on</strong> <strong>and</strong> coordinati<strong>on</strong> with other C<strong>on</strong>tractors <strong>on</strong> site;• c<strong>on</strong>tinuously m<strong>on</strong>itor <strong>and</strong> maintain installed works;• c<strong>on</strong>tinuously keep the Site <strong>and</strong> Albert Park clean <strong>of</strong> c<strong>on</strong>structi<strong>on</strong> <strong>and</strong> generaldebris;• preparati<strong>on</strong> <strong>and</strong> submissi<strong>on</strong> <strong>of</strong> any shop drawings required by thisSpecificati<strong>on</strong> or as otherwise necessary; <strong>and</strong>• provisi<strong>on</strong> <strong>of</strong> all facilities, crane use, hoisting, scaffolding, shoring, protectivescreens <strong>and</strong> hoardings <strong>and</strong> other works as may be necessary.St<strong>and</strong>ards, Safety <strong>and</strong> Inspecti<strong>on</strong>sThe works shall be executed in accordance with the best trade practices to provide thesite with a first class installati<strong>on</strong> both in performance <strong>and</strong> in appearance. They shall alsocomply with the requirements <strong>of</strong> all statutory acts <strong>and</strong> regulati<strong>on</strong> that apply for worksincluding the relevant Australian st<strong>and</strong>ards as published by St<strong>and</strong>ards Australia.The c<strong>on</strong>tractor shall under its own Quality Assurance programme <strong>and</strong> proceduresinspect the works during the installati<strong>on</strong>. Any rectificati<strong>on</strong> shall be carried outprogressively <strong>and</strong> the works presented for inspecti<strong>on</strong> by the Authority <strong>and</strong> the AGPC.Resp<strong>on</strong>se ProcessExpressi<strong>on</strong>s <strong>of</strong> interest must be limited to four (4) A4 pages <strong>and</strong> must include companybackground, relevant experience <strong>and</strong> capabilities, informati<strong>on</strong> <strong>on</strong> recent projects <strong>and</strong>client references.Additi<strong>on</strong>al informati<strong>on</strong> can be obtained by c<strong>on</strong>tacting Andrew Bart<strong>on</strong> at APP Corporati<strong>on</strong>Pty Ltd <strong>on</strong> 03 8699 2722 or <strong>and</strong>rew.bart<strong>on</strong>@app.com.au

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!