31.07.2015 Views

OWNER'S MANUAL - Laundry Nation

OWNER'S MANUAL - Laundry Nation

OWNER'S MANUAL - Laundry Nation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Steam Piping - Installation InsatructionsSTEAM PIPING-INSTALLATIONINSTRUCTIONS1. Set and anchor dryer in position. Machine should be level to assure propersteam circulation.2. To prevent condensate draining from headers to dryer, piping should havea minimum 12" (305 mm) above respective header. Do not make steamconnection to header with a horizontal or downwardly facing tee or elbow.3. Whenever possible, horizontal runs of steam lines must drain, by gravity,to respective steam header. Water pockets, or an improperly drainedsteam header will provide wet steam, causing improper operation of dryer.If pockets or improper drainage cannot be eliminated, install a bypass trapto drain condensate from the low point in the steam supply header to thereturn.4. In both steam supply and steam return line, it is recommended that eachhave a 3/4" 20 mm) union and 3/4" (20 mm) globe valve. This will enableyou to disconnect the steam connections and service the dryer while yourplant is in operation.5. Before connecting trap and check valve to dryer, open globe valve insteam supply line and allow steam to flow through dryer to flush out anydirt and scale from dryer. This will assure proper operation of trap whenconnected.6. After flushing system, install bucket trap (with built-in strainer) and checkvalve. For successful operation of dryer, install trap 18" (457 mm) belowcoil and as near to the dryer as possible. Inspect trap carefully for inletand outlet markings and install according to trap manufacturer'sinstructions. If steam is gravity returned to boiler, omit trap but installcheck valve in return line near dryer.7. Install union and globe valve in return line and make final pipeconnections to return header.PIPINGRECOMMENDATIONS1. Trap each dryer individually. Always keep the trap clean and in goodworking condition.2. When dryer is on the end of a line of equipment, extend header at least 4feet beyond dryer. Install globe valve, union, check valve and bypass trap atend of line. If gravity returned to boiler, omit trap.3. Insulate steam supply and return line for safety of operator and safetywhile servicing dryer.4. Keep dryer in good working condition. Repair or replace any worn ordefective parts.Page 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!