40. Gunasekaran, A. and M. Sarhadi "Implementation of Activity-Based Costing in Manufacturing",Proceedings of The Ninth International Working Seminar on Production Economics,Innsbruck, Austria, February 19-23, 1996, pp. 413-433.40(1995)41. Gunasekaran, A. and Rahman, S., "An Investigation on the Applications of Multimedia inManufacturing", Proceedings of the 6th International Conference on ManufacturingEngineering, Melbourne, Australia, November 29- December 1, 1995.42. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Group Technology inManufacturing: A Review", Proceedings of the International Conference on IndustrialEngineering and Production Management, Marrakech, Morocco, April 4-7, 1995, pp. 476-484.43. Gunasekaran, A., Okko, P., Martikainen, T. and P. Yli-Olli, "Productivity and QualityImprovement in Small and Medium Enterprises", The Fifth International Conference onProductivity & Quality Research (ICPQR-95), Miami, Florida, USA, February 20-24, 1995(Proceedings edited by D. Sumanth, Productivity and Quality Frontiers V), pp. 382-392.(1994)44. Subba Rao, R., Gunasekaran, A., Goyal, S.K. and Martikainen, T., "Queueing Models in theDesign and Operations of Manufacturing Systems", Proceedings of The 45th InternationalIndustrial Engineering Conference/Third IERC Research Conference, Atlanta, Georgia,USA, May 15-19, 1994 (Edited by L. Burke and J. Chapman), pp. 623-628.45. Okko, P. and Gunasekaran, A., "An Investigation on the Technology Transfer and DiffusionProcesses", Proceedings of the Fourth International Conference on Management ofTechnology, Miami, Florida, USA, February 28-March 4, 1994, pp. 375-385.(1993)46. Lyu, J. and Gunasekaran, A., "A Simulation Model with Embedded Expert System",Proceedings of the European Simulation Symposium 1993, Delft, The Netherlands, October25-28, 1993.47. Gunasekaran, A., Virtanen, I. Martikainen, T. and Yli-Olli, P., "The Design of Computer-Integrated Manufacturing Systems", Proceedings of the International Conference onManaging Integrated Manufacturing, Keele, U.K., September 22-24, 1993 (Edited by J.S.Hassard, P.L. Forrester, C. Hawksley and N.K.H. Tang), pp. 541-558.48. Gunasekaran, A. Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Improving Productivity and Qualityin Government Institutions Through a Strategic Approach", Proceedings of the SecondInternational Symposium on Productivity and Quality Improvement with a Focus onGovernment, Washington, D.C., USA, September 8-10, 1993 (Proceedings edited by JohnS.W. Fargher, Jr.), pp. 372-378.49. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Economic Production and OrderQuantities for Jointly Replenished Items", Proceedings of the 12th International Conferenceon Production Research, Lappeenranta, Finland, August 16-20, 1993, pp. 771-772.
50. Gunasekaran, A., Lyu, J., Virtanen, I. and Yli-Olli, P., "Optimal Inventory Policies in a Class ofProduction-Inventory Systems", Proceedings of the First International Conference onGlobal Business Environment and Strategy, Tainan, Taiwan, R.O.C., March 12-15, 1993, pp.331-337.(1992)51. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Determining EconomicsInventory Policies in a Multi-Stage Just-In-Time Production System", Proceedings of TheSeventh International Working Seminar on Production Economics, Innsbruck, Austria,February 17-21, 1992.41(1991)52. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Equipment Selection Problemsin Just-In-Time Manufacturing Systems", Proceedings of the OR Research Conference,Salford, United Kingdom, December 19-20, 1991.53. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Implementation of JapaneseManufacturing Concepts in Finnish Industry", Proceedings of the NOAS 91 Conference,Turku, Finland, August 22-23, 1991.(1990)54. McTavish, R., Goyal, S. K. and Gunasekaran, A., "Implementation of Zero Inventories and Just-In-Time Production Concepts in Chinese Manufacturing Organizations", Proceedings of theInternational Canada-China Management Conference, Xylan, China, August 10-14, 1990,(Travel award winning paper), pp. 617-628.(1985)55. Gunasekaran, A., "Study of Turn-Over Rate of a Production System as a PerformanceIndicator", Proceedings of the 11th IMACS World Congress, Oslo, Norway, 1985.56. Gunasekaran, A., "Identification of the Behaviour of a Production-inventory SystemConsidering the Decay of Material", Proceedings of the 7 th IFAC/IFORS Society Symposiumon Identification and System Parameter Estimation, University of York, York, England, July3-7, 1985, Identification and System Parameter Estimation, (Edited by H.A. Barker and P.C.Young), Pergamon Press, Elmsford, NY, Vol. 7, Ch. 328, No. 7, pp. 1113-1117.57. Gunasekaran, A., "The Turn-Over Rate of a Production-inventory System for Varying Numberof Products Considering the Decay of Materials", Proceedings of the IFAC/IFORSConference on Control Science and Technology for Development, Peking, China, 1985.58. Gunasekaran, A., Subash Babu, A. and Ramaswamy, N., "Multi-stage Production-inventorySystems with Multiple Spindles and Batch Blocking- Some Problems in Optimization",Proceedings of the 2nd International Working Conference on Production Economics,Innsbruck, Austria, 1985.59. Gunasekaran, A., "The Effect of Varying Marketing Policies on the Dynamics of a ProductioninventorySystem", Proceedings of the INRIA Conference on Production Systems-Scientific,Economic, Strategic Approach, Paris, France, 1985.
- Page 2 and 3: Papers Presented in Conferences 43E
- Page 5 and 6: • Worked with other centers and c
- Page 7 and 8: 7• Reviewed many tenure and promo
- Page 9 and 10: 9September 2002 - PresentProfessor
- Page 11 and 12: 11Continuing Education Center, Univ
- Page 13 and 14: 12. Jain, R., Gunasekaran, A., and
- Page 15 and 16: 1539. So, H.W.T., Gunasekaran, A. a
- Page 17 and 18: 1767. Gunasekaran, A. and Ngai, E.W
- Page 19 and 20: (2001)1995. Gunasekaran, A., Marri,
- Page 21 and 22: 21121. Lyu, J. and Gunasekaran, A.,
- Page 23 and 24: 150. Marri, H.B., Gunasekaran, A. a
- Page 25 and 26: 25178. Lyu, J., Gunasekaran, A. and
- Page 27 and 28: 204. Gunasekaran, A., Goyal, S.K.,
- Page 29 and 30: 29(1985)229. Gunasekaran, A., "A St
- Page 31 and 32: 7. Gunasekaran, A., “Build-to-Ord
- Page 33 and 34: 3340. Gunasekaran, A. and Chung, W.
- Page 35 and 36: • Gunasekaran, A., 2008, “Techn
- Page 37 and 38: 37(2003)11. Maqsood A. Sandhu and G
- Page 39: 39(1998)30. Marri, H.B., Gunasekara
- Page 43 and 44: • Department of Industrial Engine
- Page 45 and 46: 4521. Gupta, K and Gunasekaran, A.,
- Page 47 and 48: 4743. Gunasekaran, A., Opanasenko,
- Page 49 and 50: (1992)4965. Gunasekaran, A., Goyal,
- Page 51 and 52: 51• Measuring Business Excellence
- Page 53 and 54: 5331. International Journal of Oper
- Page 55 and 56: • Editor-in-Chief, International
- Page 57 and 58: • Raoprasert, T., “Factors Infl
- Page 59 and 60: 59• D.J. Power, "Characteristics
- Page 61 and 62: Masters Dissertations:611. G. Aryee
- Page 63 and 64: 63Invited Talks/Seminars:I have pre
- Page 65 and 66: • Workshop on "New Manufacturing
- Page 67 and 68: • Track Co-Chair, Radio Frequency
- Page 69 and 70: • Program Committee Member, 15 th
- Page 71 and 72: • Served as an External Member of
- Page 73 and 74: 7314. Title: An Integrated Lean-Agi
- Page 75 and 76: • Faculty Associate, Center for I